PizarraContexto de trabajoDocumentos y registrosControles críticosRegistrosPreparaciónCondiciones bloqueantesAutorización
Aseguramiento / Técnico
PH6A-FPSO-EXECUTIVE-FINAL-DEMO-REV3

Executive Final Demonstration REV3

MM WTP YANACOCHA / BECHTEL GLOBAL · CONTROLLED_NON_DESTRUCTIVE_EXECUTIVE_DEMONSTRATION · PRESERVE_EXTEND_AND_REEXECUTE

DEMO_ARCHITECTURE_ASSURED_WITH_CONTROLLED_ACTIONSExecutiveFinalDemoStatus = READY_FOR_PRESENTATIONDemoAssurance = PASS_WITH_CONTROLLED_ACTIONSTechnicalCloseout = CURRENT_DESIGN_DEMO_PHASE_COMPLETE
Preserved assets
42
Deleted / Overwritten
0 / 0
Silent supersession
0
Material traceability breaks
0

§0 · Governing parent state

Referenced without modification.

Parent baseline
MASTER-PH6A-FPSO-CV07-REV2_FINAL
Functional / assurance baselines
PH6A-FPSO-FINAL-INTEGRATION-PROMPT-A-REV1 · PH6A-FPSO-FINAL-INTEGRATION-PROMPT-B-REV2
Temporal correction
PH6A-FPSO-CORRECTION-PROMPT-01-REV0 = ACCEPTED
Preservation overlay
PH6A-FPSO-CORRECTION-PROMPT-02-REV2 = ACCEPTED
Previous demo
PH6A-FPSO-EXECUTIVE-FINAL-DEMO-REV1 = IMMUTABLE_HISTORICAL_EXECUTION
Demo REV2
PRESERVED_DESIGN_PREDECESSOR
Production implementation
OUT_OF_CURRENT_EXECUTION_SCOPE
Future production architecture
PRESERVED_FOR_CORPORATE_INDUSTRIALIZATION

§2 · Non-destructive governing invariant

PriorArchitecturePreserved
TRUE
PriorFunctionalDesignPreserved
TRUE
PriorAssuranceDesignPreserved
TRUE
PriorTemporalModelPreserved
TRUE
PriorContinuousAssurancePreserved
TRUE
PriorChangeControlPreserved
TRUE
PriorProductionArchitecturePreserved
TRUE
PriorSealHistoryPreserved
TRUE
PriorDemoHistoryPreserved
TRUE

§3 · Dual-layer lifecycle model

Layer A — current controlled demo
  • Architecture
  • Functional Design
  • Assurance
  • Temporal Compliance
  • Controlled Simulation
  • Architecture Scalability
  • ES&H Change Control
  • Continuous Assurance
  • Controlled Executive Demo
  • Demo Assurance
  • Technical Closeout
Layer B — future corporate industrialization
  • Production IAM
  • Production Decision Rights
  • Production Source Authority
  • Production PKI
  • Production Offline / Edge
  • Production integrations
  • Production cybersecurity
  • Production electronic signature
  • Production configuration baseline
  • Production operational evidence
  • Production Service Management
  • Production Continuous Assurance
  • Production Seal
  • Production Pilot
  • Enterprise rollout
NOT EXECUTED NOW != NOT DESIGNEDNOT EXECUTED NOW != FAILEDNOT EXECUTED NOW != DELETED

§4 · Demo entry gate

11/11 conditions met · ENTRY_CONDITIONS_MET. G-PH6A is not an entry blocker for the current controlled demo.

EG-01CorrectionPrompt01 (temporal)MET
required ACCEPTED · observed ACCEPTED
EG-02CorrectionPrompt02 (preservation overlay)MET
required ACCEPTED · observed ACCEPTED
EG-03PreservationFlagsMET
required ALL_TRUE · observed 23/23 TRUE
EG-04DeletedArtifactCountMET
required 0 · observed 0
EG-05OverwrittenArtifactCountMET
required 0 · observed 0
EG-06SilentSupersessionCountMET
required 0 · observed 0
EG-07TraceabilityBreaksMET
required 0 · observed 0
EG-08TemporalModelMET
required CORRECTED_AND_HARDENED · observed CORRECTED_AND_HARDENED
EG-09DemonstrationConfigurationBaselineMET
required ESTABLISHED · observed ESTABLISHED
EG-10G-FPSO-ARCH-01MET
required PASS or PASS_WITH_CONTROLLED_ACTIONS · observed PASS_WITH_CONTROLLED_ACTIONS
EG-11ArchitectureChangeRequiredFromScalabilityMET
required 0 · observed 0
G-PH6A
HOLD_PRESERVED_FOR_FUTURE_INDUSTRIALIZATION
GPH6A_CurrentDemoGateImpact
NONE
GPH6A_FutureIndustrializationGateImpact
BLOCKING

§5–§6 · Demonstration configuration baseline & predeclared run

DEMONSTRATION_CONFIGURATION_BASELINE
ESTABLISHED
PRODUCTION_CONFIGURATION_BASELINE
NOT_ESTABLISHED_IN_CURRENT_PHASE
PRODUCTION_ARCHITECTURE_DESIGN
PRESERVED
ReferenceMode
REFERENCED_WITHOUT_MODIFICATION
DemoScenario_ID
PH6A-FPSO-DEMO3-SCENARIO-CV07-AWTP-WEST
DemoScenarioVersion
REV3.0
DemoRun_ID
DEMO3-RUN-0001
ParentBaseline_ID
MASTER-PH6A-FPSO-CV07-REV2_FINAL
InputDatasetVersion
DEMO3-DATASET-REV0
ExpectedResultsStatus
IMMUTABLE_AFTER_RUN_START
ScenarioSpecificCode
NONE
HardCodedFavourableOutcomes
NONE
Referenced without modification
DesignBaselineFunctionalBaselineAssuranceBaselineTemporalComplianceModelAuthorityModelDecisionRightsModelSourceAuthorityModelRequirementCatalogueRecordCatalogueLocationModelCriticalControlModelSIMOPSModelReadinessModelEvidenceModelOfflineReconciliationModelSignatureAssuranceModelChangeControlModelContinuousAssuranceModelScalabilityAssuranceResultG-FPSO-ARCH-01ExecutiveAssurancePanel

§7–§21 · Demonstration moments 01–19

M-01Demand & Operational ContextPASS
Demonstrates
  • Demand → IWP / Work Package → Activity → Crew → Shift
  • CanonicalLocation TT01 / AWTP_WEST
  • LocationConcurrentWorkSet with 3 concurrent activities
Preserved distinctions
  • Location = OPERATIONAL_CONTEXT_CONTAINER
  • GPSCandidate != CanonicalLocation
  • Proximity does not create authority
Expected
GPS candidate remains SEMANTIC_PROPOSAL; canonical identity human-validated
Observed
GPS candidate held as SEMANTIC_PROPOSAL; no authority derived from proximity
M-02Governing ES&H Documents (Class A)PASS
Demonstrates
  • PETS, Procedures, Standards, Core Processes, Plans, Programs, Instructions
  • Critical Control requirements and Requirements of Record
  • ApprovalStatus / CurrentRevision / EffectiveStatus / Applicability / SourceAuthority
Preserved distinctions
  • Allowed: CURRENT_AND_APPLICABLE
  • Blocking: SUPERSEDED, EXPIRED, WITHDRAWN, UNCONTROLLED, UNKNOWN_VERSION, UNKNOWN_SOURCE, NOT_APPROVED
Expected
Any blocking state → HOLD_FOR_AFFECTED_SCOPE
Observed
Superseded PETS produced HOLD_FOR_AFFECTED_SCOPE; scope bounded to affected activity
M-03Daily / Shift Operational Records (Class B)PASS
Demonstrates
  • IPERC Continuo, AST/ATS, Lista de asistencia, PETAR
  • Check list de herramientas / de equipos, Pre-start verification, OAT
  • Field verification and shift-specific work records
Preserved distinctions
  • ActualDate / ActualShift / ActualCrew / ActualLocation / ActualActivity
  • CurrentApplicableProcedure and CurrentApplicableRequirement enforced
Expected
Record must correspond to the actual operating context
Observed
Mismatched shift record produced HOLD; matched records validated
M-04Temporal CompliancePASS
Demonstrates
  • T01…T10 deterministic temporal evaluation
Preserved distinctions
  • NO_FUTURE_DATED_DOCUMENTS = TRUE
  • NO_BACKDATING = TRUE
  • FutureOperationalValidity != FutureDocumentDate
Expected
10 / 10 temporal cases match expected outcome
Observed
10 / 10 matched
M-05Authoritative InformationPASS
Demonstrates
  • CandidateSource / AuthoritativeSource / SemanticAuthority / WriteAuthority
  • CurrentVersion / RequirementOfRecord / Applicability / Provenance
Preserved distinctions
  • CandidateSource != AuthoritativeSource
  • Retrieved != Applicable != Authorized
  • No platform is universally authoritative by default
Expected
Unknown source authority → HOLD; no silent promotion
Observed
Unknown source authority produced HOLD on affected objects only
M-06Preventive ES&H PackagePASS
Demonstrates
  • Composed from Work Order, PETS, IPERC context, Critical Controls, Permit requirements
  • Tools / Equipment readiness, Crew requirements, SIMOPS, Location hazards
  • Applicable documents and required records
Preserved distinctions
  • AI-generated content cannot become Requirement of Record
Expected
Package is SYSTEM_PROPOSED until human review
Observed
Package composed as SYSTEM_PROPOSED; no AI content entered the Requirement catalogue
M-07Human ReviewPASS
Demonstrates
  • SystemProposal → HumanReview → HumanChallenge → HumanCorrection
  • VersionRetention and Provenance
Preserved distinctions
  • SystemProposal != HumanConfirmation
  • AIAdvisoryOutput != AuthorizedDecision
Expected
Rejected proposals retained with provenance, never overwritten
Observed
Challenge and correction retained both versions with provenance
M-08Authority & Decision RightsPASS
Demonstrates
  • Identity / Role / DecisionRight / AuthorityScope
  • Area / Activity / Shift / Risk / RegisterType / TemporalValidity
  • Delegation and Revocation
Preserved distinctions
  • AuthenticatedIdentity != DecisionRight
  • Permission != DecisionRight
  • UnknownMaterialAuthority → HOLD
Expected
Unknown material authority blocks authorization
Observed
Unknown authority produced HOLD; revoked right removed authorization capability
M-09Double ReadinessPASS
Demonstrates
  • FUNCTIONAL_ENABLING_READINESS shown independently
  • PREVENTIVE_ES&H_READINESS shown independently
Preserved distinctions
  • No compensated score
  • No averaged readiness
  • Any mandatory criterion failing → IntegratedReadiness != READY
Expected
No arithmetic aggregation appears anywhere in the readiness presentation
Observed
Both dimensions rendered independently; failing criterion blocked READY
M-10Material AuthorizationPASS
Demonstrates
  • Who / Role / DecisionRight / Object / Activity / Location / Timestamp
  • Source / Version / Requirement / Evidence / Decision / ValidityWindow
Preserved distinctions
  • SignatureEvidence != SignatureApplicability != DecisionRight
  • Cryptographic validity alone does not authorize work
Expected
Authorization fully reconstructible from recorded facts
Observed
Authorization reconstructed end-to-end with 0 traceability breaks
M-11Normal Controlled PathPASS
Demonstrates
  • READY with controlled demo authorization
  • Crew awareness, current documents, Critical Controls, DecisionRights
  • Tool readiness, SIMOPS, evidence, audit trail
Preserved distinctions
  • AI may explain; AI shall not authorize
Expected
READY reached only through competent human authorization
Observed
READY reached after competent authorization; AI restricted to explanation
M-12Controlled Failure PathsPASS
Demonstrates
  • 13 injected failure conditions
Preserved distinctions
  • Technology failure shall never bypass control
Expected
Every injected failure contained as HOLD / STOP / REASSESS / REJECTED / NO_AUTHORIZATION
Observed
13 / 13 contained; 0 bypass
M-13Offline & ReconciliationPASS
Demonstrates
  • Offline capture with BaseVersion, IdempotencyKey, immutable queue
  • Reconnect → compare → conflict detection → authority / version refresh → revocation check
  • Signature applicability reassessment → reconciliation
Preserved distinctions
  • NO_LAST_WRITE_WINS
  • NO_SILENT_READY
  • STALE_AUTHORITY_CANNOT_AUTHORIZE
  • STALE_OBJECT_VERSION_CANNOT_AUTHORIZE
Expected
Divergence creates RECONCILIATION_REQUIRED preserving both states
Observed
Conflict preserved both states; stale authority refused authorization
M-14Recovery / ReauthorizationPASS
Demonstrates
  • RESTORE → COMPARE → RECONCILE → CONFLICT_CHECK → AUTHORITY_CHECK → VERSION_CHECK → INTEGRITY_CHECK → VERIFIED → REASSESS → COMPETENT_REAUTHORIZATION → READY
Preserved distinctions
  • READY cannot be automatic
Expected
READY only after competent reauthorization
Observed
Sequence executed in order; READY required explicit competent reauthorization
M-15Architecture ScalabilityPASS_WITH_CONTROLLED_ACTIONS
Demonstrates
  • BASE_SCOPE = AWTP_WEST vs SECOND_SCOPE = CONTROLLED_SYNTHETIC_SECOND_AREA
  • Varied area, location, discipline, activity, crew, shift, work package, controls, requirements, procedures, records, source authorities, decision rights, SIMOPS, tools, equipment, permit applicability
Preserved distinctions
  • Prior G-FPSO-ARCH-01 result used as governing evidence — not re-run from zero
  • Only demo applicability revalidated
Expected
16 CONFIGURATION_ONLY / 4 CONTROLLED_EXTENSION / 0 FUNCTIONAL / 0 ARCHITECTURE
Observed
16 CONFIGURATION_ONLY / 4 CONTROLLED_EXTENSION / 0 FUNCTIONAL / 0 ARCHITECTURE
M-16ES&H Change ControlPASS
Demonstrates
  • 18 change events executed in CONTROLLED_CHANGE_SIMULATION_CONTEXT
Preserved distinctions
  • ParentBaseline = FROZEN
  • ParentBaselineMutation = PROHIBITED
Expected
Every event classified, scoped, revalidated and recorded without parent mutation
Observed
18 / 18 executed; parent baseline unmutated
M-17Continuous AssurancePASS
Demonstrates
  • Reusable 12-step assurance lifecycle applied to every change event
Preserved distinctions
  • Continuous Assurance = VERIFIED_AT_DEMO_MODEL_LEVEL
  • Production Continuous Assurance = PRESERVED_FOR_FUTURE_INDUSTRIALIZATION
Expected
Lifecycle identical for all events; no bespoke handling
Observed
Single lifecycle applied uniformly
M-18AI-OFF Material State EquivalencePASS
Demonstrates
  • Material paths replayed with AI_ON and AI_OFF
Preserved distinctions
  • AI may find, compare, summarize, explain, diagnose
  • AI may not authorize, close Gate, accept risk, create DecisionRight, promote source, modify timestamp, alter Requirement of Record, restore READY
Expected
MaterialState_AI_ON = MaterialState_AI_OFF
Observed
Material states identical across both replays
M-19Value AssurancePASS
Demonstrates
  • BEFORE / AFTER / ObservedDifference / AttributableDifference
  • ControlValueTime / AdministrativeFrictionTime / ExternalDelayTime shown separately
Preserved distinctions
  • ObservedDifference != AttributableBenefit
  • ControlValueTime is never represented as waste
  • No unsupported ROI; no financial claim from simulated time saving
Expected
AttributableDifference remains NOT_ESTABLISHED in a simulated demo
Observed
AttributableDifference = NOT_ESTABLISHED_SIMULATION_ONLY; no ROI claimed

§10 · Temporal compliance — T01…T10

10/10 matched · FutureOperationalValidity != FutureDocumentDate

T01Current PETSMATCH
expected VALID · observed VALID
T02Superseded PETSMATCH
expected HOLD · observed HOLD
T03IPERC generated today for actual shiftMATCH
expected VALID · observed VALID
T04IPERC with future DocumentCreationTimestampMATCH
expected INVALID_FUTURE_DATED_DOCUMENT → REJECTED · observed INVALID_FUTURE_DATED_DOCUMENT → REJECTED
T05PETAR generated today with later operational validity window permitted by requirementMATCH
expected CURRENT_DOCUMENT_WITH_FUTURE_OPERATIONAL_VALIDITY_WINDOW → VALID · observed CURRENT_DOCUMENT_WITH_FUTURE_OPERATIONAL_VALIDITY_WINDOW → VALID
T06PETAR carrying future document dateMATCH
expected REJECTED · observed REJECTED
T07Backdated checklistMATCH
expected INVALID_BACKDATED_RECORD → REJECTED · observed INVALID_BACKDATED_RECORD → REJECTED
T08Governed late entryMATCH
expected VALID_ONLY_IF_REQUIREMENT_ALLOWS · observed VALID (requirement permits governed late entry with reason + authority)
T09Wrong shift recordMATCH
expected HOLD · observed HOLD
T10Record linked to superseded governing procedureMATCH
expected HOLD · observed HOLD

§18 · Controlled failure paths

13/13 contained · bypass events 0. Technology failure shall never bypass control.

FI-01
Critical Control unavailable
STOP
FI-02
Tool inspection / calibration expired
HOLD
FI-03
Procedure revision superseded
HOLD
FI-04
Future-dated field record
REJECTED
FI-05
Backdated field record
REJECTED
FI-06
Aggregate SIMOPS conflict
STOP
FI-07
Signature applicability loss
NO_AUTHORIZATION
FI-08
DecisionRight revoked
NO_AUTHORIZATION
FI-09
Source Authority unknown
HOLD
FI-10
Offline stale authority
NO_AUTHORIZATION
FI-11
Concurrent version conflict
REASSESS
FI-12
Integration unavailable
HOLD
FI-13
Cyber integrity uncertainty
HOLD

§21–§22 · Scalability & controlled extension assurance

G-FPSO-ARCH-01 = PASS_WITH_CONTROLLED_ACTIONS used as governing evidence — not re-run from zero. ControlledExtensionIntegrity = PASS.

CE-EXT-01Contextual document retrieval across a second areaFunctionalContractImpact = NONEArchitectureImpact = NONE
Affected object
GoverningDocumentIndex / Applicability rules
Parent contract
FC-FPSO-02 ContextualDocumentRetrieval
Configuration impact
Additional area-scoped applicability configuration
Protected invariant impact
NONE
Required demo revalidation
Applicability resolution for second area only
Future industrialization impact
Production document index scoping to be confirmed
CE-EXT-02SIMOPS aggregate evaluation with additional concurrent disciplinesFunctionalContractImpact = NONEArchitectureImpact = NONE
Affected object
LocationConcurrentWorkSet
Parent contract
SIMOPS Compositional Model (CUM-1…CUM-7)
Configuration impact
Additional discipline pairs and aggregate rule parameters
Protected invariant impact
NONE
Required demo revalidation
Aggregate recomputation for the second scope
Future industrialization impact
Production SIMOPS coordinator staffing to be confirmed
CE-EXT-03Decision Rights scoping across a second area and shift patternFunctionalContractImpact = NONEArchitectureImpact = NONE
Affected object
DecisionRight scope matrix
Parent contract
Authority / Decision Rights Model
Configuration impact
Additional Area × Activity × Shift scope entries
Protected invariant impact
NONE
Required demo revalidation
Authority resolution for second-area roles
Future industrialization impact
Production IAM mapping required (Layer B)
CE-EXT-04Tool / equipment readiness registers for a second equipment populationFunctionalContractImpact = NONEArchitectureImpact = NONE
Affected object
ToolReadinessRegister
Parent contract
FC-FPSO-07 ToolReadiness
Configuration impact
Additional register instances and inspection interval configuration
Protected invariant impact
NONE
Required demo revalidation
Expiry evaluation on the second register
Future industrialization impact
Production register mastership to be confirmed

§23–§27 · ES&H change control — CE-DEMO-01…18

CONTROLLED_CHANGE_SIMULATION_CONTEXT · ParentBaseline = FROZEN · Mutation PROHIBITED. No compensated scoring; no averaging of critical impacts.

CE-DEMO-01Controlled governing document revisionCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H MEDIO
Nivel de consecuencia
3
Nivel de probabilidad
3
Required assurance response
Scoped requirement and record revalidation
Scoped revalidation
Affected activities only
Affected objects
AffectedRequirements · AffectedActivities · AffectedRecords
Predicate impact
Document currency predicate re-evaluated
Gate impact
NONE (configurable)
Baseline impact
NONE — no architecture reopen if configurable
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-01
CE-DEMO-02Requirement of Record changeCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H MEDIO
Nivel de consecuencia
3
Nivel de probabilidad
3
Required assurance response
Applicability re-evaluation and record re-assessment
Scoped revalidation
Affected requirement family
Affected objects
Applicability · AffectedControls · Records
Predicate impact
Requirement satisfaction predicate re-evaluated
Gate impact
ASSESSED
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-02
CE-DEMO-03Critical Control changeMATERIAL ES&H CONTROL CHANGERIESGO ES&H CRITICO
Nivel de consecuencia
5
Nivel de probabilidad
3
Required assurance response
TARGETED_ES&H_CONTROL_REVALIDATION
Scoped revalidation
Control verification for affected activities
Affected objects
CriticalControl · Activities relying on the control
Predicate impact
Critical control effectiveness predicate reopened
Gate impact
AS_APPLICABLE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-03
Override / escalation reasons
  • CriticalControlImpact = TRUE → MinimumChangeClass = MATERIAL_ES&H_CONTROL_CHANGE
  • High risk alone does not create architecture change
CE-DEMO-04DecisionRight change / revocationCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H ALTO
Nivel de consecuencia
4
Nivel de probabilidad
3
Required assurance response
AffectedScope = HOLD until authority revalidated
Scoped revalidation
Authority resolution for affected scope
Affected objects
AuthorityScope · Pending authorizations
Predicate impact
Authority predicate invalidated
Gate impact
SCOPED_HOLD
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-04
Override / escalation reasons
  • DecisionRight / WorkAuthorization / RequirementOfRecord impact → ChangeClass != NON_MATERIAL_CHANGE
  • High ES&H risk with sub-material class → MaterialityReassessmentRequired = TRUE
  • High risk alone does not create architecture change
CE-DEMO-05Owner / Steward changeCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H MEDIO
Nivel de consecuencia
3
Nivel de probabilidad
2
Required assurance response
Authority and stewardship mapping re-evaluated; no inherited authority
Scoped revalidation
Stewardship assignment check
Affected objects
Stewardship mapping · Authority mapping
Predicate impact
Stewardship availability predicate re-evaluated
Gate impact
NONE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-05
CE-DEMO-06Source Authority changeCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H MEDIO
Nivel de consecuencia
3
Nivel de probabilidad
3
Required assurance response
No silent source promotion; affected objects REASSESS / HOLD
Scoped revalidation
Source authority resolution for affected objects
Affected objects
Federated object references
Predicate impact
Source authority predicate reopened
Gate impact
SCOPED_REASSESS
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-06
CE-DEMO-07Integration changeCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H MEDIO
Nivel de consecuencia
2
Nivel de probabilidad
3
Required assurance response
Scoped integration revalidation; no automatic architecture reopen
Scoped revalidation
Interface contract test
Affected objects
Affected interface contract
Predicate impact
Freshness predicate re-evaluated
Gate impact
NONE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-07
CE-DEMO-08Application / configuration changeNON-MATERIAL CHANGERIESGO ES&H BAJO
Nivel de consecuencia
2
Nivel de probabilidad
2
Required assurance response
Configuration and rule impact analysis; no silent rule promotion
Scoped revalidation
Rule version diff
Affected objects
Configuration set · Rule set
Predicate impact
Rule version recorded
Gate impact
NONE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-08
CE-DEMO-09Cybersecurity vulnerability affecting DecisionRightCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H ALTO
Nivel de consecuencia
4
Nivel de probabilidad
3
Required assurance response
AffectedScope = HOLD; cybersecurity remediation required
Scoped revalidation
Authority integrity revalidation
Affected objects
Identity assertion · DecisionRight validity
Predicate impact
Authority integrity predicate invalidated
Gate impact
SCOPED_HOLD
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-09
Override / escalation reasons
  • High ES&H risk with sub-material class → MaterialityReassessmentRequired = TRUE
  • High risk alone does not create architecture change
CE-DEMO-10Offline reconciliation rule changeCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H MEDIO
Nivel de consecuencia
3
Nivel de probabilidad
2
Required assurance response
Offline assurance revalidation; NO_LAST_WRITE_WINS preserved
Scoped revalidation
Offline conflict scenarios
Affected objects
Reconciliation rules
Predicate impact
Reconciliation predicate re-evaluated
Gate impact
NONE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-10
CE-DEMO-11Signature rule changeCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H MEDIO
Nivel de consecuencia
3
Nivel de probabilidad
2
Required assurance response
SignatureEvidence / SignatureApplicability separation preserved
Scoped revalidation
Signature applicability scenarios
Affected objects
SignatureApplicability rules
Predicate impact
Signature applicability predicate re-evaluated
Gate impact
NONE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-11
CE-DEMO-12Field process changeCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H MEDIO
Nivel de consecuencia
2
Nivel de probabilidad
3
Required assurance response
Documents and records re-evaluated; daily/shift requirements reassessed
Scoped revalidation
Record catalogue applicability
Affected objects
Applicable documents · Required daily/shift records
Predicate impact
Record completeness predicate re-evaluated
Gate impact
NONE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-12
CE-DEMO-13SIMOPS changeMATERIAL ES&H CONTROL CHANGERIESGO ES&H ALTO
Nivel de consecuencia
5
Nivel de probabilidad
2
Required assurance response
Aggregate context recalculated — pairwise PASS does not guarantee aggregate PASS
Scoped revalidation
CUM-1…CUM-7 aggregate rules
Affected objects
LocationConcurrentWorkSet · Aggregate SIMOPS context
Predicate impact
Aggregate SIMOPS predicate reopened
Gate impact
AS_APPLICABLE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-13
Override / escalation reasons
  • CriticalControlImpact = TRUE → MinimumChangeClass = MATERIAL_ES&H_CONTROL_CHANGE
  • High risk alone does not create architecture change
CE-DEMO-14Incident / Lesson LearnedCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H ALTO
Nivel de consecuencia
4
Nivel de probabilidad
2
Required assurance response
Impact assessment and requirement / control review; no automatic architecture change
Scoped revalidation
Requirement and control review
Affected objects
Requirements · Controls
Predicate impact
Requirement predicate reviewed
Gate impact
ASSESSED
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-14
Override / escalation reasons
  • High ES&H risk with sub-material class → MaterialityReassessmentRequired = TRUE
  • High risk alone does not create architecture change
CE-DEMO-15Measurement rule changeNON-MATERIAL CHANGERIESGO ES&H BAJO
Nivel de consecuencia
2
Nivel de probabilidad
2
Required assurance response
Measurement authority identified; ControlValueTime preserved; no retrospective baseline manipulation
Scoped revalidation
Measurement definition review
Affected objects
Measurement definitions
Predicate impact
NONE
Gate impact
NONE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-15
CE-DEMO-16Infrastructure / platform changeCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H MEDIO
Nivel de consecuencia
3
Nivel de probabilidad
3
Required assurance response
Integration boundary reassessment and cybersecurity impact assessment; architecture change only if a protected contract is violated
Scoped revalidation
Integration boundary tests
Affected objects
IntegrationBoundary · Cybersecurity posture
Predicate impact
Integration availability predicate re-evaluated
Gate impact
NONE
Baseline impact
NONE
Seal impact
NO_IMPACT_ON_HISTORICAL_SEALS
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-16
CE-DEMO-17True ES&H governing baseline contradictionES&H GOVERNING BASELINE CHANGERIESGO ES&H CRITICO
Nivel de consecuencia
5
Nivel de probabilidad
3
Required assurance response
BASELINE_REASSESSMENT_REQUIRED
Scoped revalidation
Governing baseline reassessment (simulated)
Affected objects
ES&H governing baseline
Predicate impact
Governing baseline predicates reopened
Gate impact
GATE_RECHECK_REQUIRED
Baseline impact
BASELINE_REASSESSMENT_REQUIRED (simulation context — parent remains frozen)
Seal impact
NEXT_SEAL_REQUIRED (candidate SEAL-03, not created in current demo)
Materiality reassessment
NOT_REQUIRED
Architecture reopen
NOT_REQUIRED
Assurance record
AR-CE-DEMO-17
Override / escalation reasons
  • CriticalControlImpact = TRUE → MinimumChangeClass = MATERIAL_ES&H_CONTROL_CHANGE
  • True ES&H governing baseline contradiction → ES&H_GOVERNING_BASELINE_CHANGE
  • High risk alone does not create architecture change
CE-DEMO-18True architecture contract contradictionCONTROLLED ES&H CONFIGURATION CHANGERIESGO ES&H ALTO
Nivel de consecuencia
4
Nivel de probabilidad
2
Required assurance response
ARCHITECTURE_REOPEN_REQUIRED + ADR_REQUIRED
Scoped revalidation
Architecture contract analysis (simulated)
Affected objects
Protected architecture contract
Predicate impact
Architecture contract predicate reopened
Gate impact
GATE_RECHECK_REQUIRED
Baseline impact
Parent baseline remains immutable during Demo
Seal impact
NEXT_SEAL_REQUIRED (candidate SEAL-03, not created in current demo)
Materiality reassessment
REQUIRED
Architecture reopen
REQUIRED (ADR)
Assurance record
AR-CE-DEMO-18
Override / escalation reasons
  • High ES&H risk with sub-material class → MaterialityReassessmentRequired = TRUE

§33 · Change control & continuous assurance panel

Counts only — no compensated score.

ChangeEventsTested
18
NonMaterialChanges
2
ControlledESHConfigurationChanges
13
MaterialESHControlChanges
2
ESHGovernedBaselineChanges
1
HighRiskChanges
7
ScopedRevalidations
18
TargetedGateRechecks
3
BaselineReassessments
1
ArchitectureReopenEvents
1
ControlledExtensions
4
TemporalComplianceImpacts
5
CriticalControlImpacts
3
DecisionRightImpacts
4
SourceAuthorityImpacts
4
MaterialityReassessments
4
CurrentSealImpact
NO_HISTORICAL_SEAL_OVERWRITTEN
NextSealRequired
true
CandidateFutureSeal
SEAL-03 (not created in current demo)
CompensatedScore
NONE
Pending assurance actions
  • CE-DEMO-04 — AffectedScope = HOLD until authority revalidated
  • CE-DEMO-09 — AffectedScope = HOLD; cybersecurity remediation required
  • CE-DEMO-14 — Impact assessment and requirement / control review; no automatic architecture change
  • CE-DEMO-18 — ARCHITECTURE_REOPEN_REQUIRED + ADR_REQUIRED
NOT USED AS PRIMARY LABEL: MINORNOT USED AS PRIMARY LABEL: CONTROLLEDNOT USED AS PRIMARY LABEL: MATERIALNOT USED AS PRIMARY LABEL: STRUCTURALNOT USED: SeverityNOT USED: Likelihood

§28–§29 · Continuous assurance lifecycle & seal protection

Current: VERIFIED_AT_DEMO_MODEL_LEVEL · Future: PRESERVED_FOR_FUTURE_INDUSTRIALIZATION

1. ChangeEvent2. ImpactAssessment3. ES&H Change Impact Classification4. ConsequenceAssessment5. ProbabilityAssessment6. AffectedObjects7. ScopedRevalidation8. PredicateImpact9. GateRecheckIfRequired10. ConfigurationUpdate11. AssuranceRecord12. SealImpactAssessment
PH6A-IADA-REV1-SEAL-01
IMMUTABLE_HISTORICAL_DESIGN_SEAL
Never overwritten by the change-control demonstration.
PH6A-FPSO-SEAL-02
DESIGNED_FOR_FUTURE_INDUSTRIALIZATION
Not created in the current phase.
SEAL-03
CANDIDATE_FUTURE_SEAL (NextSealRequired = TRUE from simulated material change)
No production seal is created in the current demo.

§30 · AI-OFF material state equivalence

AI_OFF_MaterialStateEquivalence = true

Governing document validationEQUIVALENT
AI_ON HOLD_FOR_AFFECTED_SCOPE · AI_OFF HOLD_FOR_AFFECTED_SCOPE
Daily/shift record validationEQUIVALENT
AI_ON VALID · AI_OFF VALID
Temporal evaluation (T04 future-dated)EQUIVALENT
AI_ON REJECTED · AI_OFF REJECTED
Authority resolution (revoked right)EQUIVALENT
AI_ON NO_AUTHORIZATION · AI_OFF NO_AUTHORIZATION
Double readiness computationEQUIVALENT
AI_ON NOT_READY · AI_OFF NOT_READY
SIMOPS aggregate evaluationEQUIVALENT
AI_ON STOP · AI_OFF STOP
Offline reconciliationEQUIVALENT
AI_ON RECONCILIATION_REQUIRED · AI_OFF RECONCILIATION_REQUIRED
Recovery / reauthorizationEQUIVALENT
AI_ON READY_AFTER_COMPETENT_REAUTHORIZATION · AI_OFF READY_AFTER_COMPETENT_REAUTHORIZATION
AI may
  • find
  • compare
  • summarize
  • explain
  • diagnose
AI may not
  • authorize
  • close Gate
  • accept risk
  • create DecisionRight
  • promote source
  • modify timestamp
  • alter Requirement of Record
  • restore READY

§31 · Value assurance

BEFORE
Prospective baseline NOT_YET_MEASURED (BC-09 protection active)
AFTER
Controlled demo observation only
ObservedDifference
SIMULATED_OBSERVATION_ONLY
AttributableDifference
NOT_ESTABLISHED
ControlValueTime
Recognised as value-adding control time — never waste
AdministrativeFrictionTime
Reported separately
ExternalDelayTime
Reported separately
  • ObservedDifference != AttributableBenefit
  • ControlValueTime SHALL NOT be represented as waste
  • No unsupported ROI
  • No financial claim from simulated time saving alone

§32 · Executive assurance panel — Section A: current controlled demo

Presentation layer only — derived from underlying state.

DESIGN BASELINEFROZENAUD-DEMO3-01
RC-DB-01 preserved parent baseline referenced without modification
FUNCTIONAL BASELINEFROZENAUD-DEMO3-02
RC-FB-01 PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 unchanged
TEMPORAL COMPLIANCEVERIFIED_IN_CONTROLLED_DEMOAUD-DEMO3-03
RC-TC-01 10/10 temporal cases matched
DEMONSTRATION CONFIGURATIONESTABLISHEDAUD-DEMO3-04
RC-DC-01 demo configuration baseline declared before run
ARCHITECTURE ASSURANCEPASS_WITH_CONTROLLED_ACTIONSAUD-DEMO3-05
RC-AA-01 G-FPSO-ARCH-01 governing evidence reused · Gate G-FPSO-ARCH-01
SCALABILITY ASSURANCEPASS_WITH_CONTROLLED_ACTIONSAUD-DEMO3-06
RC-SA-01 16 configuration-only / 4 controlled extensions
DECISION RIGHTS MODELVALIDATED_FOR_DEMO_SCOPEAUD-DEMO3-07
RC-DR-01 authenticated identity never equals decision right
SOURCE AUTHORITY MODELVALIDATED_FOR_DEMO_SCOPEAUD-DEMO3-08
RC-SO-01 no default universal authority
CRITICAL CONTROLSVERIFIED_IN_CONTROLLED_DEMO_SCOPEAUD-DEMO3-09
RC-CC-01 control loss produced STOP · Residual risk: Production critical-control evidence pending (Layer B)
DOUBLE READINESSVERIFIED_NO_COMPENSATIONAUD-DEMO3-10
RC-RD-01 independent functional and ES&H readiness
SIMOPSVERIFIED_AGGREGATEAUD-DEMO3-11
RC-SM-01 pairwise PASS does not imply aggregate PASS
OFFLINE / RECONCILIATIONVERIFIED_NO_LAST_WRITE_WINSAUD-DEMO3-12
RC-OF-01 stale authority cannot authorize
CHANGE CONTROLVERIFIEDAUD-DEMO3-13
RC-CH-01 18 change events classified with override rules · CE-DEMO-01…18
CONTINUOUS ASSURANCEVERIFIED_AT_DEMO_MODEL_LEVELAUD-DEMO3-14
RC-CA-01 uniform 12-step lifecycle
DEMO ASSURANCEPASS_WITH_CONTROLLED_ACTIONSAUD-DEMO3-15
RC-DA-01 expected vs observed material match
TECHNICAL CLOSEOUTCURRENT_DESIGN_DEMO_PHASE_COMPLETEAUD-DEMO3-16
RC-TCO-01 current phase only — not production completion

§32 · Executive assurance panel — Section B: future production industrialization

Not executed now != not designed, failed or deleted.

PRODUCTION ARCHITECTURE DESIGNPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONAUD-DEMO3-B01
RC-PB-01
PRODUCTION IAM DESIGNDESIGNED_PENDING_CORPORATE_VALIDATIONAUD-DEMO3-B02
RC-PB-02 OER-01 open
PRODUCTION DECISION RIGHTSREQUIRES_FUTURE_OPERATIONAL_EVIDENCEAUD-DEMO3-B03
RC-PB-03
PRODUCTION SOURCE AUTHORITYDESIGNED_PENDING_CORPORATE_VALIDATIONAUD-DEMO3-B04
RC-PB-04
PRODUCTION INTEGRATION DESIGNREQUIRES_FUTURE_IMPLEMENTATIONAUD-DEMO3-B05
RC-PB-05
PRODUCTION OFFLINE DESIGNREQUIRES_FUTURE_IMPLEMENTATIONAUD-DEMO3-B06
RC-PB-06 EXT-15 open
PRODUCTION SIGNATURE ASSURANCEDESIGNED_PENDING_CORPORATE_VALIDATIONAUD-DEMO3-B07
RC-PB-07
PRODUCTION CYBERSECURITY DESIGNREQUIRES_FUTURE_IMPLEMENTATIONAUD-DEMO3-B08
RC-PB-08
PRODUCTION EVIDENCE MODELREQUIRES_FUTURE_OPERATIONAL_EVIDENCEAUD-DEMO3-B09
RC-PB-09
PRODUCTION SERVICE MANAGEMENTFUTURE_PHASE_NOT_EXECUTEDAUD-DEMO3-B10
RC-PB-10
PRODUCTION CONTINUOUS ASSURANCEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONAUD-DEMO3-B11
RC-PB-11
PRODUCTION CONFIGURATION BASELINEFUTURE_PHASE_NOT_EXECUTEDAUD-DEMO3-B12
RC-PB-12 NOT_ESTABLISHED_IN_CURRENT_PHASE
PRODUCTION SEALDESIGNED_PENDING_CORPORATE_VALIDATIONAUD-DEMO3-B13
RC-PB-13 SEAL-02 not created
PRODUCTION PILOT / G-PH6A PATHREQUIRES_FUTURE_OPERATIONAL_EVIDENCEAUD-DEMO3-B14
RC-PB-14 G-PH6A HOLD preserved; 9 blocking conditions open · Residual risk: BC-09 time-irreversible baseline
BANNER NOT USED: PRODUCTION_READYBANNER NOT USED: FULLY_COMPLIANTBANNER NOT USED: PRODUCTION_ACCEPTEDBANNER NOT USED: OPERATIONALLY_DEPLOYED

§36 · Final traceability

MaterialTraceabilityBreaks = 0

RequirementControlObjectiveCapabilityFunctionalContractRuleAuthoritativeSourceDecisionRightEvidenceGateResidualRiskValueMechanism
  • CurrentDemoStatus
  • FutureIndustrializationStatus
  • ChangeEventImpact

§37 · Demo assurance

DemoAssuranceResult = PASS_WITH_CONTROLLED_ACTIONS

StateTransitionAccuracyPASS
All declared transitions observed in order
TemporalComplianceAccuracyPASS
T01…T10 matched
GoverningDocumentAccuracyPASS
7 blocking states enforced
DailyShiftRecordAccuracyPASS
Context match enforced on 5 attributes
AuthorityCompliancePASS
Unknown / revoked authority blocked
SourceCorrectnessPASS
No silent source promotion
CriticalControlResponsePASS
Control loss → STOP
ReadinessIntegrityPASS
No compensation or averaging
SIMOPSResponsePASS
Aggregate evaluation independent of pairwise
RuleDeterminismPASS
Identical governed input → identical material output
FailureContainmentPASS
13/13 injections contained
OfflineIntegrityPASS
No last-write-wins, no silent READY
SignatureAssurancePASS
Evidence / applicability / decision right separated
AIIndependencePASS
AI-OFF material state equivalence held
ChangeControlAccuracyPASS
18/18 events classified per override rules
ConsequenceProbabilityAccuracyPASS
Matriz de consecuencias y probabilidades applied without compensation
ContinuousAssuranceAccuracyPASS
Uniform lifecycle for every event
ScalabilityAccuracyPASS_WITH_CONTROLLED_ACTIONS
4 controlled extensions require bounded demo revalidation
ControlledExtensionIntegrityPASS
Functional and architecture impact = NONE for all 4
EvidenceReconstructibilityPASS
Authorization reconstructed end-to-end
TraceabilityIntegrityPASS
MaterialTraceabilityBreaks = 0
AuditCompletenessPASS
Every material row carries an audit reference
ExecutivePanelAccuracyPASS
Panel derived from underlying state only
NarrativeAccuracyPASS
No production claim from a controlled demonstration
PreservationIntegrityPASS
0 deleted / 0 overwritten / 0 silent supersession

§39 · Demo reproducibility

DemoRun_ID
DEMO3-RUN-0001
ExecutionTimestamp
RECORDED_AT_RUN (deterministic evaluation, clock-independent results)
DesignBaselineVersion
MASTER-PH6A-FPSO-CV07-REV2_FINAL
FunctionalBaselineVersion
PH6A-FPSO-FUNCTIONAL-BASELINE-REV1
DemoConfigurationVersion
DEMO3-CONFIG-REV0
TemporalModelVersion
PH6A-FPSO-CORRECTION-PROMPT-01-REV0
ChangeControlModelVersion
DEMO3-CC-REV0
ContinuousAssuranceModelVersion
DEMO3-CA-REV0
ScalabilityModelVersion
PH6A-FPSO-CORRECTION-PROMPT-02-REV2
ScenarioVersion
REV3.0
InputDatasetVersion
DEMO3-DATASET-REV0
Variances
NONE_MATERIAL
AuditReference
AUD-DEMO3-RUN-0001
Rule
Identical governed input = identical material output

§40–§41 · Technical closeout & corporate industrialization handoff

TechnicalCloseoutStatus = CURRENT_DESIGN_DEMO_PHASE_COMPLETE

Design baseline frozenMET
Referenced without modification
Functional baseline frozenMET
PH6A-FPSO-FUNCTIONAL-BASELINE-REV1
Temporal model hardenedMET
10/10 temporal cases
Architecture preservedMET
42 preserved assets
G-FPSO-ARCH-01 acceptableMET
PASS_WITH_CONTROLLED_ACTIONS
Controlled Extensions boundedMET
4/4 with NONE functional and architecture impact
Scalability demonstratedMET
Second controlled synthetic scope
Change Control demonstratedMET
18 change events
Continuous Assurance demonstratedMET
12-step lifecycle
Controlled Demo executedMET
Entry gate 11/11
Demo Assurance acceptableMET
PASS_WITH_CONTROLLED_ACTIONS
MaterialTraceabilityBreaks = 0MET
0
Historical traceability preservedMET
0 broken historical links
Future production architecture preservedMET
Layer B intact
No unsupported production claimsMET
Prohibited banners not used
  • This SHALL NOT mean PRODUCTION_ENGINEERING_COMPLETE
  • This SHALL NOT mean PRODUCTION_DEPLOYMENT_COMPLETE
  • This SHALL NOT mean PRODUCTION_ASSURANCE_COMPLETE
Handoff package (prepared by reference — no production implementation)
Preserved Architecture BaselineFunctional ContractsArchitecture ContractsDesign LocksADR HistoryTemporal Compliance ModelRequirement CatalogueRecord CatalogueCore Process MappingCritical Control ModelDecision Rights ModelAuthority ModelSource Authority ModelEvidence ArchitectureOffline / Reconciliation ArchitectureSignature Assurance ArchitectureCybersecurity ArchitectureIntegration ArchitectureChange Control ModelContinuous Assurance ModelService Management DesignValue ModelScalability ResultsControlled Extension RegisterDemo Assurance ResultsExecutive Assurance Panel stateOpen Corporate DecisionsFuture Production DependenciesRequired Future Operational EvidenceRecommended Industrialization Sequence

§43 · Hard success criteria

PriorArchitecturePreservedMET
required TRUE · observed TRUE
PriorDemoHistoryPreservedMET
required TRUE · observed TRUE
DeletedArtifactCountMET
required 0 · observed 0
OverwrittenArtifactCountMET
required 0 · observed 0
SilentSupersessionCountMET
required 0 · observed 0
BrokenHistoricalTraceabilityCountMET
required 0 · observed 0
TemporalComplianceMET
required PASS · observed PASS
NO_FUTURE_DATED_DOCUMENTSMET
required TRUE · observed TRUE
NO_BACKDATINGMET
required TRUE · observed TRUE
G-FPSO-ARCH-01MET
required PASS / PASS_WITH_CONTROLLED_ACTIONS · observed PASS_WITH_CONTROLLED_ACTIONS
ScalabilityAssuranceMET
required PASS / PASS_WITH_CONTROLLED_ACTIONS · observed PASS_WITH_CONTROLLED_ACTIONS
ControlledExtensionIntegrityMET
required PASS · observed PASS
ChangeControlAccuracyMET
required PASS · observed PASS
ConsequenceProbabilityAccuracyMET
required PASS · observed PASS
ContinuousAssuranceAccuracyMET
required PASS · observed PASS
CriticalFailurePathsContainedMET
required TRUE · observed true
AI_OFF_MaterialStateEquivalenceMET
required TRUE · observed true
ExpectedObservedMaterialMatchMET
required TRUE · observed TRUE
MaterialTraceabilityBreaksMET
required 0 · observed 0
AuditCompletenessMET
required PASS · observed PASS
ExecutivePanelAccuracyMET
required PASS · observed PASS
DemoAssuranceResultMET
required PASS / PASS_WITH_* · observed PASS_WITH_CONTROLLED_ACTIONS

§42 · PH6A-FPSO-EXECUTIVE-FINAL-DEMO-REV3-REPORT

DemoScenario_ID
PH6A-FPSO-DEMO3-SCENARIO-CV07-AWTP-WEST
DemoRun_ID
DEMO3-RUN-0001
PreviousDemoHistoryPreserved
TRUE
DesignBaselineStatus
FROZEN
FunctionalBaselineStatus
FROZEN
TemporalComplianceStatus
PASS
DemonstrationConfigurationBaselineStatus
ESTABLISHED
ProductionConfigurationBaselineStatus
NOT_ESTABLISHED_IN_CURRENT_PHASE
PreservedEngineeringAssetCount
42
DeletedArtifactCount
0
OverwrittenArtifactCount
0
SilentSupersessionCount
0
G-FPSO-ARCH-01
PASS_WITH_CONTROLLED_ACTIONS
ArchitectureAssuranceResult
PASS_WITH_CONTROLLED_ACTIONS
ScalabilityAssuranceResult
PASS_WITH_CONTROLLED_ACTIONS
ConfigurationOnlyCount
16
ControlledExtensionCount
4
FunctionalChangeCount
0
ArchitectureChangeCount
0
GoverningDocumentValidationResult
PASS — blocking states produce HOLD_FOR_AFFECTED_SCOPE
DailyShiftRecordValidationResult
PASS — actual context enforced
FutureDatedDocumentResult
REJECTED
BackdatedDocumentResult
REJECTED
PETARControlledWindowResult
VALID — CURRENT_DOCUMENT_WITH_FUTURE_OPERATIONAL_VALIDITY_WINDOW
CriticalControlFailureResult
STOP
DecisionRightFailureResult
NO_AUTHORIZATION
SourceAuthorityFailureResult
HOLD
SIMOPSAggregateFailureResult
STOP
ToolExpiryResult
HOLD
SignatureApplicabilityResult
NO_AUTHORIZATION
OfflineReconciliationResult
RECONCILIATION_REQUIRED — NO_LAST_WRITE_WINS
ConcurrentVersionResult
REASSESS
CyberIntegrityResult
HOLD
ChangeEventsTested
18
ChangeControlResult
PASS
ConsequenceProbabilityModelResult
PASS — no compensated scoring
ContinuousAssuranceResult
VERIFIED_AT_DEMO_MODEL_LEVEL
NonMaterialChangeCount
2
ControlledESHConfigurationChangeCount
13
MaterialESHControlChangeCount
2
ESHGovernedBaselineChangeCount
1
ScopedRevalidationCount
18
GateRecheckCount
3
BaselineReassessmentCount
1
ArchitectureReopenCount
1
AI_OFF_MaterialStateEquivalence
true
ExpectedObservedMaterialMatch
TRUE
MaterialTraceabilityBreaks
0
ExecutiveAssurancePanelStatus
PUBLISHED_DUAL_LAYER
ExecutiveAssuranceBanner
DEMO_ARCHITECTURE_ASSURED_WITH_CONTROLLED_ACTIONS
PreservationIntegrity
PASS
AuditCompleteness
PASS
DemoAssuranceResult
PASS_WITH_CONTROLLED_ACTIONS
TechnicalCloseoutStatus
CURRENT_DESIGN_DEMO_PHASE_COMPLETE
FutureProductionArchitectureStatus
PRESERVED_FOR_FUTURE_INDUSTRIALIZATION
CorporateIndustrializationHandoffStatus
PREPARED_BY_REFERENCE — NO_PRODUCTION_IMPLEMENTATION_EXECUTED
ExecutiveFinalDemoStatus
READY_FOR_PRESENTATION
FinalDisposition
EXECUTIVE_FINAL_DEMO_REV3_COMPLETE_CURRENT_DESIGN_DEMO_PHASE_ONLY — G-PH6A HOLD PRESERVED FOR FUTURE INDUSTRIALIZATION

§44–§45 · Target executive end-state & governing principles

DESIGN BASELINE
FROZEN
FUNCTIONAL BASELINE
FROZEN
TEMPORAL COMPLIANCE
VERIFIED IN CONTROLLED DEMO
DEMONSTRATION CONFIGURATION
ESTABLISHED
ARCHITECTURE ASSURANCE
PASS_WITH_CONTROLLED_ACTIONS
SCALABILITY ASSURANCE
PASS WITH CONTROLLED ACTIONS
DECISION RIGHTS MODEL
VALIDATED FOR DEMO SCOPE
SOURCE AUTHORITY MODEL
VALIDATED FOR DEMO SCOPE
CRITICAL CONTROLS
VERIFIED IN CONTROLLED DEMO SCOPE
CHANGE CONTROL
VERIFIED
MATRIZ DE CONSECUENCIAS Y PROBABILIDADES
VERIFIED
CONTINUOUS ASSURANCE
VERIFIED AT DEMO MODEL LEVEL
CONTROLLED DEMO
COMPLETE
DEMO ASSURANCE
PASS_WITH_CONTROLLED_ACTIONS
TECHNICAL CLOSEOUT
CURRENT_DESIGN_DEMO_PHASE_COMPLETE
PRODUCTION ARCHITECTURE DESIGN
PRESERVED FOR FUTURE INDUSTRIALIZATION
PRODUCTION CONFIGURATION
NOT ESTABLISHED IN CURRENT PHASE
G-PH6A
HOLD PRESERVED FOR FUTURE INDUSTRIALIZATION
PRODUCTION PILOT
NOT EXECUTED IN CURRENT PHASE
CORPORATE INDUSTRIALIZATION
FUTURE DECISION
EXECUTIVE ASSURANCE STATUS
DEMO_ARCHITECTURE_ASSURED_WITH_CONTROLLED_ACTIONS
  • Demo REV3 is an extension of the preserved engineering baseline — not a reset, rebuild or replacement of demo history.
  • No future-dated documents. No backdating. No silent READY. No last-write-wins. No AI authority.
  • No compensated readiness. No compensated ES&H risk scoring.
  • No demo evidence promotion to production evidence. No production claim from a controlled demonstration.
  • Preserve the architecture. Demonstrate it. Challenge it. Demonstrate safe failure. Protect the path to corporate industrialization.