Aseguramiento / Técnico
Phase 1 prototype · Phase 2A corrective verification · SYNTHETIC DEMONSTRATION DATA

Integrated Preventive Readiness

Hold point — Phase 3 not authorized
Acting role — demonstration device only, not an authorization mechanism

Superintendent: What will be ready across my area, and what must be resequenced?

Scenario map

One governed location, three disciplines, overlapping windows

3100-CONC-CV07-TT01 · context v7
Concentrator — CV-07 Transfer Tower 01, Level +12 m
ACTIVESIMOPS STOP
  • Overlapping execution windows across mechanical, electrical and instrumentation.
  • Common equipment: CV-07 and the shared TT01 gantry.
  • Environmental condition: wind gust breach forecast 13:00–17:00.
  • Expiring competency: arc-flash PPE and rigger currency at 12:00.
  • SIMOPS interaction: shared isolation boundary plus cumulative crew density.
  • Critical-control issue: dropped-object barricade not erected (EC-06).
  • Valid inherited condition: location height context LCR-02 (applicability checked).
  • Non-inheritable authorization: prior PTW, isolation certificate, PETAR, sign-on records.

Design-to-baseline trace

Each experience area traced to an accepted baseline

Experience areaBaseline consumedDemonstrates
1 Shift / LookaheadH (Catalogue), R/S/T (Validity, Forecast, Alerts), O (Decision Rules)Current vs forecast readiness with named blocker owner; no scoring
2 Location ContextADR-14 Option C, X (Location Continuity), Y (GAE taxonomy)Location as Operational Context Container with concurrent work set
3 Job CardB (Domain aggregates), J (Enabling Conditions), K/L (Q4 model)JobCard aggregate with enabling conditions and transactions
4 Preventive PackagePACE contract, D (Engine contracts)SYSTEM_PROPOSED vs HUMAN_CONFIRMED separation
5 IPERC ContinuoM/N (IPERC/PETAR transition)Predicted context never shown as validated
6 PETAR / Work ControlK/L, Authority principle (A)Generation → review → validation → authorization routing; no auto-authorization
7 SIMOPSADR-14 Rev 3 (CUM-1…CUM-7), 0C TC-05/TC-09Pairwise PASS ≠ location PASS; non-compensable STOP
8 ForecastS (Forecast), T (Alerts)Future gaps within the execution window
9 ContinuityX, ADR-14 inheritance policy DOWNWARD_WITH_APPLICABILITY_CHECKContext survives, authorization does not
10 AssuranceAA/AB (Evidence/Measurement), 0C decision pinningSource, version, decision, owner, history
Role UXAC (Role-based IA)Seven distinct role journeys instead of a universal tab wall

Baseline changed by Phase 1: none. Structural invariants A–G remain frozen; this phase adds presentation and scenario evidence only.

Prototype assumptions

  • All records are synthetic; no live integration to Aconex, P6, Q4, Smart Completions, People or Health systems.
  • Governed thresholds (egress crew limit 12 at TT01, wind 15 m/s) are illustrative configuration values, not approved project parameters.
  • Stewardship roles for LOC-3100-CONC-CV07 are shown as fully assigned to allow the ACTIVE path to be demonstrated.
  • Q4 state vocabulary used here is the subset validated in Phase 0C; 'Locked' remains deliberately unmapped (CA-03).
  • Time is fixed to the demonstration clock 2026-09-01/02; no live clock is injected.

Known limitations

  • No persistence: confirmations made in the prototype are session-local and not evidence-grade.
  • No authentication or real authority resolution; role selection is a demonstration device, not an authorization mechanism.
  • No offline/reconciliation runtime (Section Z) — represented only as declared behaviour.
  • Cumulative SIMOPS rules CUM-2, CUM-5 and CUM-7 are implemented in the domain layer but not exercised by this scenario.
  • Measurement chain (Time Saved / Released / Captured) is not instrumented in Phase 1.

Prototype Review Register

Recommended dispositions — review not yet performed by the accepting authority

IDAreaObservationDispositionAction
PR-01SIMOPSLocation STOP is derived independently of pairwise results, as required.PASS
PR-02Preventive PackageSYSTEM_PROPOSED items are visually and semantically separated from HUMAN_CONFIRMED.PASS
PR-03IPERC ContinuoPredicted hazards render as unvalidated until field confirmation is recorded.PASS
PR-04Work ControlNo path in the prototype produces authorization without a named human actor.PASS
PR-05FederationGPS mapping is pinned at SEMANTIC_PROPOSAL and excluded from IRDE inputs.PASS
PR-06Q4 mappingState 'Locked' fails closed and blocks JC-7702 transaction JHA-3320.PASS WITH ACTIONCA-03 — governed mapping decision required
PR-07ClassificationREQ-INST-114 without governed criticality fails closed with no default.PASS WITH ACTIONCA-04 — REQ-UNCLASSIFIED-09 closure
PR-08ContinuityAuthorization objects are excluded from inheritance; context survives handover.PASS
PR-09Role IASeven role journeys implemented; no universal multi-tab surface.PASS
PR-10MeasurementAB measurement chain not instrumented in this phase.DEFERREDPhase 2 candidate — requires explicit authorization
PR-11IdentityPerson identity resolution (CA-01 / ADR-13) remains open; competency owner shown by position title only.OPENADR-13 closure

Controlled open decisions

Displayed, never fabricated

ADR-13 / CA-01Canonical person identity resolutionOPEN
CA-03Q4 state 'Locked' governed mappingOPEN
CA-04REQ-UNCLASSIFIED-09 classification governanceOPEN
ADR-17…24H–AE controlled open decisionsOPEN
ADR-25…29JobCard SoR, SIMOPS authority, governed history rulesOPEN