Macro C — Corporate Industrialization & Operational Transition
PH6A-FPSO-MPC-REV0 · industrialize correctly without promoting evidence class
§0 Execution authority — independently reconstructed
MacroPromptC_Authorized verified, not assumed
| Check | Observed | Verdict |
|---|---|---|
| MacroPromptC_Authorized asserted by parent macro | true | PASS |
| Parent macro status is ACCEPTED (not inferred) | ACCEPTED | PASS |
| Scenario baseline FROZEN | FROZEN | PASS |
| G-FPSO-07 demonstrator acceptance gate | PASS | PASS |
| Operational boundary carried unchanged from parent | HOLD / PROHIBITED | PASS |
B. Governing configuration lineage
§1 · superseded baselines are historical evidence only
| Key | Baseline | Status |
|---|---|---|
| ArchitectureBaseline | PH6A-IADA-REV1 | FROZEN AND SEALED |
| ArchitectureSeal | PH6A-IADA-REV1-SEAL-01 | ACTIVE AND FROZEN |
| CorporateInteractionArchitecture | PH6A-BXIA-REV0 | ACCEPTED |
| FunctionalBaseline | PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | FROZEN |
| InteractionDesign | PH6A-FPSO-IAD-REV2 | ACCEPTED |
| BechtelizedApplicationBaseline | PH6A-FPSO-BAC-REV0 | ACCEPTED |
| Prototype | PH6A-FPSO-PROTOTYPE-REV0 | BUILD COMPLETE |
| ImplementationConformance | PH6A-FPSO-ICV-REV0 | ACCEPTED |
| FunctionalVerification | PH6A-FPSO-FVT-REV0 | PASS |
| ApplicationEngineeringBaseline | PH6A-FPSO-APPLICATION-ENGINEERING-BASELINE-REV0 | VERIFIED |
| ScenarioBaseline | PH6A-FPSO-SCENARIO-BASELINE-REV0 | FROZEN |
| Demonstrator | PH6A-FPSO-E2E-DEMO-REV0 | EXECUTED |
| DemonstratorAssurance | PH6A-FPSO-DAA-REV0 | ACCEPTED |
| SimulationEvidence | ACCEPTED | SIMULATION CLASS ONLY |
| InheritedExternalDependencyCount | 15 | CARRIED FORWARD |
NO_IMPLEMENTATION_FROM_SUPERSEDED_BASELINE = TRUE · PH6A-FPSO-FUNCTIONAL-BASELINE-REV0 — historical evidence only · PH6A-FPSO-IAD-REV1 — historical evidence only · PH6A-FPSO-FUNCTIONAL-BASELINE-REV1-CANDIDATE — superseded by REV1 FROZEN
§2–4 Operational boundary, evidence law and stage model
Preserved boundary
Fundamental evidence law
- DesignEvidence ≠ OperationalClosureEvidence
- SoftwareVerificationEvidence ≠ OperationalClosureEvidence
- SimulationEvidence ≠ OperationalClosureEvidence
- DocumentExists ≠ OperationalClosure
- OwnerNamed ≠ OwnerValidated
- MockIntegration ≠ LiveIntegration
- PrototypeBehaviour ≠ ProductionBehaviour
- TechnicalReadiness ≠ OrganizationalAuthorization
Stage execution
C. Corporate development handover package
§7 · PH6A-CORPORATE-DEVELOPMENT-HANDOVER-REV0 · 33 mandatory artefacts
| ID | Content | Source baseline | Completeness | Note |
|---|---|---|---|---|
| H-01 | ArchitectureBaseline | PH6A-IADA-REV1 | COMPLETE | 14 logical components, 12 hardened contract families. |
| H-02 | ArchitectureSeal | PH6A-IADA-REV1-SEAL-01 | COMPLETE | 4 logical locks active; provenance PRV-01…PRV-18. |
| H-03 | ArchitectureDecisionRecords | ADR-01…ADR-24 | COMPLETE WITH OPEN DEPENDENCY | ADR-03, ADR-13/CA-01, ADR-15…24 remain controlled-open. |
| H-04 | FunctionalRequirementsOfRecord | PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | COMPLETE | FC-FPSO-01…08, 38-element schema each. |
| H-05 | InteractionDesign | PH6A-FPSO-IAD-REV2 | COMPLETE | 16 screens S01–S16; 18-step field journey. |
| H-06 | BechtelizedApplicationSpecification | PH6A-FPSO-BAC-REV0 | COMPLETE | 17 conformance dimensions; F-IAD-03 controlled non-blocking. |
| H-07 | PrototypeReference | PH6A-FPSO-PROTOTYPE-REV0 | COMPLETE | Reference implementation of the deterministic PureCore only. |
| H-08 | SemanticDictionary | PH6A-IADA-REV1 | COMPLETE | Governed term set; corporate implementation may not re-define terms. |
| H-09 | CapabilityModel | PH6A-FPSO-AIA-REV0 | COMPLETE | 26 assessed capabilities; 24 implemented in PureCore. |
| H-10 | FactModel | PH6A-AHP-REV1.1 | COMPLETE | 6 fact classes AUTHORITATIVE…AUTHORIZED_DECISION; 9 invariants. |
| H-11 | StateModels | PH6A-FPSO-FCD-REV0 | COMPLETE | 60 states, 33 transitions, 55 reason codes. |
| H-12 | DecisionRightsModel | PH6A-IADA-REV1 | COMPLETE WITH OPEN DEPENDENCY | Model complete; actual corporate assignments are OWNER_VALIDATION_REQUIRED. |
| H-13 | AuthorityBoundary | PH6A-IADA-REV1 | COMPLETE | Permission ≠ Authority; system consumes authority, never manufactures it. |
| H-14 | SourceAuthorityRegister | MPC §F | COMPLETE WITH OPEN DEPENDENCY | Object-specific; all entries owner-evidence dependent. |
| H-15 | InterfaceContractRegister | MPC §E | COMPLETE WITH OPEN DEPENDENCY | 10 candidate systems, all mock-only today. |
| H-16 | TemporalValidityModel | XR-TEMP-01 / REM-REV0 | COMPLETE | EvaluationTimestamp is a governed input. |
| H-17 | TIME_EVENT_CHANGE_DEMAND TriggerModel | PH6A-IADA-REV1 | COMPLETE | Four trigger classes drive all revalidation. |
| H-18 | ConcurrencyModel | PH6A-SADR-REM-REV0 | COMPLETE | Row-level optimistic concurrency guards. |
| H-19 | IdempotencyModel | PH6A-FPSO-FCD-REV0 | COMPLETE | Event keys per device/object/baseVersion. |
| H-20 | DigitalSignatureAssuranceModel | FC-FPSO-08 / REM-REV0 | COMPLETE WITH OPEN DEPENDENCY | SignatureEvidence immutable vs SignatureApplicability evaluated; legal sufficiency unproven. |
| H-21 | OfflineAndRecoveryModel | PH6A-IADA-REV1 | COMPLETE WITH OPEN DEPENDENCY | EXT-15 offline signature reconciliation authority remains open. |
| H-22 | FailureContainmentModel | PH6A-FPSO-FVT-REV0 | COMPLETE | Fail-closed on unverifiable mandatory condition. |
| H-23 | SecurityConstraints | MPC §40 | EVIDENCE REQUIRED | Corporate cybersecurity approval not obtained. |
| H-24 | PrivacyConstraints | MPC §24 | COMPLETE | Decision-fact exposure only; no health/HR detail. |
| H-25 | AuditAndProvenanceModel | SEAL-01 / IADA | COMPLETE | Reconstructable decision lineage. |
| H-26 | GovernedOperationalEventModel | PH6A-IADA-REV1 | COMPLETE | Event-sourced, immutable, no last-write-wins. |
| H-27 | AIContainmentBoundary | PH6A-AHP-REV1.1 | COMPLETE | AI-to-Rule firewall; SEMANTIC_PROPOSAL never consumed by IRDE. |
| H-28 | VerificationBaseline | PH6A-FPSO-ICV-REV0 + FVT-REV0 | COMPLETE | 24/24 ICV, 30 FVT executed. |
| H-29 | SimulationEvidence | PH6A-FPSO-DAA-REV0 | COMPLETE | Classified SIMULATION_EVIDENCE; non-promotable. |
| H-30 | ExternalDependencyRegister | MPC §H | COMPLETE WITH OPEN DEPENDENCY | 18 dependencies after reconciliation. |
| H-31 | OpenFindingRegister | MPC §AJ | COMPLETE | 6 material findings, 0 critical uncontrolled. |
| H-32 | CorporateImplementationAcceptanceCriteria | MPC §J | COMPLETE | CIAC-01…CIAC-14. |
| H-33 | ConfigurationLineage | MPC §B | COMPLETE | 15 lineage rows, superseded baselines flagged historical. |
D. Capability industrialization classification
§8 · 26 capabilities · 0 classified PRODUCTION_READY
| ID | Capability | Contract | Classification | Rationale |
|---|---|---|---|---|
| CAP-01 | Location acquisition & confirmation | FC-FPSO-01 | REFERENCE IMPLEMENTATIONPRODUCTION IMPLEMENTATION REQUIRED | GPS is an input signal only; human confirmation remains the authority act. GPS ≠ Authority. |
| CAP-02 | Location replacement / re-confirmation | FC-FPSO-01 | REFERENCE IMPLEMENTATIONOWNER VALIDATION REQUIRED | Replacement invalidates dependent context; Location authority owner unvalidated. |
| CAP-03 | Contextual document retrieval | FC-FPSO-02 | EXTERNAL INTEGRATION REQUIREDPROTOTYPE ONLY | Aconex API availability unproven; retrieval currently mock. |
| CAP-04 | Revision election (no automatic election) | FC-FPSO-02 | REFERENCE IMPLEMENTATIONOWNER VALIDATION REQUIRED | Document-status authority must be validated with the document owner. |
| CAP-05 | Pre-start preventive package composition | FC-FPSO-03 | REFERENCE IMPLEMENTATIONCONFIGURATION REQUIRED | Applicability rules are configuration per project/area. |
| CAP-06 | SYSTEM_PROPOSED vs HUMAN_CONFIRMED separation | FC-FPSO-03 | REFERENCE IMPLEMENTATION | Semantics frozen; corporate build must preserve exactly. |
| CAP-07 | Crew confirmation & role-slot inheritance | FC-FPSO-04 | REFERENCE IMPLEMENTATIONEXTERNAL INTEGRATION REQUIRED | Competency/fitness decision facts require live sources. |
| CAP-08 | Competency validity gating | FC-FPSO-04 | EXTERNAL INTEGRATION REQUIREDOWNER VALIDATION REQUIRED | Authoritative competency source unvalidated (ADR-04 open). |
| CAP-09 | Fitness decision fact consumption | FC-FPSO-04 | CORPORATE POLICY DECISION REQUIRED | Privacy minimization requires a corporate decision on the exposed fact. |
| CAP-10 | IPERC Continuo (continuous risk assessment) | FC-FPSO-05 | REFERENCE IMPLEMENTATIONCONFIGURATION REQUIRED | Hazard/control taxonomy is enterprise configuration. |
| CAP-11 | Field delta assessment & REASSESS trigger | FC-FPSO-06 | REFERENCE IMPLEMENTATION | Deterministic trigger model verified by FVT. |
| CAP-12 | Tool / equipment readiness & expiry | FC-FPSO-07 | EXTERNAL INTEGRATION REQUIREDOWNER VALIDATION REQUIRED | Tool source-of-record unidentified; expiry facts unverifiable today. |
| CAP-13 | Digital signature capture (evidence) | FC-FPSO-08 | PROTOTYPE ONLYPRODUCTION IMPLEMENTATION REQUIRED | Prototype captures evidence; PKI/credential mechanism absent. |
| CAP-14 | Signature applicability evaluation | FC-FPSO-08 | REFERENCE IMPLEMENTATION | Applicability recomputed against current object version. |
| CAP-15 | Offline signature reconciliation | FC-FPSO-08 | OWNER VALIDATION REQUIREDCORPORATE POLICY DECISION REQUIRED | EXT-15 open: no competent authority defined for offline reconciliation. |
| CAP-16 | Temporal validity enforcement (XR-TEMP-01) | Cross-contract | REFERENCE IMPLEMENTATION | No material decision may rely on a temporally expired fact. |
| CAP-17 | Critical control availability & failure | Cross-contract | EXTERNAL INTEGRATION REQUIREDOWNER VALIDATION REQUIRED | Enterprise critical-control authority cannot be established by prototype configuration. |
| CAP-18 | Permit / isolation state consumption | Cross-contract | EXTERNAL INTEGRATION REQUIRED | Q4/Engica read-only integration unproven. |
| CAP-19 | SIMOPS compositional evaluation | Cross-contract | REFERENCE IMPLEMENTATIONCONFIGURATION REQUIRED | CUM-1…CUM-7 rules frozen; matrices are configuration. |
| CAP-20 | Authority resolution & delegation | Cross-contract | OWNER VALIDATION REQUIREDEXTERNAL INTEGRATION REQUIRED | Decision rights must come from IAM + corporate authority register. |
| CAP-21 | Offline minimum safe information set | Cross-contract | REFERENCE IMPLEMENTATIONPRODUCTION IMPLEMENTATION REQUIRED | Cache freshness governance requires production storage design. |
| CAP-22 | Event-sourced sync & conflict reconciliation | Cross-contract | REFERENCE IMPLEMENTATIONPRODUCTION IMPLEMENTATION REQUIRED | No last-write-wins; production needs durable event store. |
| CAP-23 | Audit / provenance reconstruction | Cross-contract | REFERENCE IMPLEMENTATIONPRODUCTION IMPLEMENTATION REQUIRED | Retention and log protection are enterprise obligations. |
| CAP-24 | AI advisory containment | Cross-contract | REFERENCE IMPLEMENTATIONCORPORATE POLICY DECISION REQUIRED | Data residency / model governance is a corporate decision (ADR-09). |
| CAP-25 | Prospective value measurement capture | Cross-contract | CONFIGURATION REQUIREDOWNER VALIDATION REQUIRED | BC09 protection active; BEFORE baseline not started. |
| CAP-26 | Production observability & alerting | Cross-contract | PRODUCTION IMPLEMENTATION REQUIRED | Not in prototype scope; no NFR targets defined. |
E. Corporate interface contract register
§9 · no API or interface capability fabricated
| ID | Business object | Candidate system / role | Read / Write | Freshness · Dependency | Failure / Offline / Reconciliation | Validation | Competent owner | Evidence of closure |
|---|---|---|---|---|---|---|---|---|
| IF-01 | Controlled document / procedure / PETS | Aconex CANDIDATE_SYSTEM_OF_RECORD | REQUIRED / NONE | Per-shift or on CHANGE event BLOCKING | Snapshot UNVERIFIABLE → fail closed on mandatory document Pinned authorized snapshot with governed validity window Revision delta → materiality assessment, no auto-election | EVIDENCE REQUIRED | Corporate Document Control Manager | API capability statement + document authority confirmation |
| IF-02 | Identity / role / session | Corporate IAM CANDIDATE_IDENTITY_SOURCE | REQUIRED / NONE | Real-time; session-bounded BLOCKING | No authenticated identity → no material decision Cached identity with bounded validity; no new authority Stale role → revalidate on reconnect | EVIDENCE REQUIRED | Corporate IAM Owner | Authentication mechanism + role/permission model evidence |
| IF-03 | Permit / work authorization | Q4 / Engica CANDIDATE_SYSTEM_OF_RECORD | REQUIRED / NONE | Event-driven BLOCKING | Permit state unverifiable → HOLD Read-only cached state, no permit creation Server state authoritative on reconnect | EVIDENCE REQUIRED | Work Control Process Owner | Integration feasibility + ownership confirmation (ADR-01/02) |
| IF-04 | Isolation / sanction to test | Q4 / Engica CANDIDATE_SYSTEM_OF_RECORD | REQUIRED / NONE | Event-driven BLOCKING | Fail closed No offline isolation change Server authoritative | EVIDENCE REQUIRED | Electrical / Energy Isolation Authority | Isolation object contract + authority confirmation |
| IF-05 | Critical control / fatal-risk taxonomy | Forwood CANDIDATE_SYSTEM_OF_RECORD | REQUIRED / NONE | Daily + on change BLOCKING | Unverifiable critical control → HOLD (no contingency verification) Cached verification status with expiry Verification recency re-evaluated | EVIDENCE REQUIRED | Corporate ES&H Critical Control Owner | BC06 Path A/B decision + source authority confirmation |
| IF-06 | Competency / qualification | People & Training CANDIDATE_SOURCE | REQUIRED (decision fact) / NONE | Daily BLOCKING | Competency unverifiable → person not assignable to gated role Cached validity with hard expiry (XR-TEMP-01) Expiry recomputed at EvaluationTimestamp | EVIDENCE REQUIRED | Training & Competency Manager | Authoritative source designation + fact-level interface |
| IF-07 | Fitness decision | Occupational Health decision service CANDIDATE_SOURCE | DECISION FACT ONLY / NONE | Shift-bounded BLOCKING | NOT_CONFIRMED → not assignable Shift-scoped cached decision fact Re-fetch each shift | EVIDENCE REQUIRED | Occupational Health Lead + Data Privacy Officer | Minimized fact contract approval |
| IF-08 | Tool / equipment certification | UNIDENTIFIED CANDIDATE_SOURCE_UNKNOWN | REQUIRED / NONE | On use + expiry watch BLOCKING | Expired/unverifiable certification → tool not usable Cached certificate expiry Expiry recomputed | EVIDENCE REQUIRED | Equipment / Plant Manager | System identification + interface capability statement |
| IF-09 | Location / area / SIMOPS context | Readiness Layer (owned) + project master data SYSTEM_OF_RECORD_FOR_DECISION_CONTEXT | OWNED / OWNED | Continuous BLOCKING | Location unconfirmed → no pre-start progression Full offline confirmation with sync Event-sourced | UNDER VALIDATION | Location Data Steward (vacant) | Named, accepted stewardship assignment |
| IF-10 | Schedule / WBS / look-ahead | Primavera P6 CANDIDATE_SYSTEM_OF_RECORD | REQUIRED / NONE | Daily DEGRADABLE | Look-ahead degraded; field work unaffected Cached look-ahead Overwrite from source | EVIDENCE REQUIRED | Project Controls Manager | Extract contract + refresh cadence agreement |
- ConnectedSystem ≠ AuthoritativeSystem
- CandidateSource ≠ SystemOfRecord
- RetrievedFact ≠ AuthoritativeFact
- SourceAuthority is OBJECT_SPECIFIC and OWNER_EVIDENCE_DEPENDENT
F. Source authority register
§10 / §20 · object-specific and owner-evidence dependent
| Object | Candidate system | Authority claimed | Evidence | Status |
|---|---|---|---|---|
| Document | Aconex | CANDIDATE | None admitted | EVIDENCE REQUIRED |
| WorkPackage / JobCard | Q4 / Engica | CANDIDATE | None admitted | EVIDENCE REQUIRED |
| Location | Readiness Layer | CANDIDATE | Design only; steward vacant | UNDER VALIDATION |
| Identity | Corporate IAM | CANDIDATE | None admitted | EVIDENCE REQUIRED |
| Competency | People & Training | CANDIDATE | None admitted (ADR-04 open) | EVIDENCE REQUIRED |
| Training | People & Training | CANDIDATE | None admitted | EVIDENCE REQUIRED |
| FitnessDecision | Occupational Health service | CANDIDATE | None admitted | EVIDENCE REQUIRED |
| Tool | UNIDENTIFIED | NONE | No candidate system | EVIDENCE REQUIRED |
| Equipment | UNIDENTIFIED | NONE | No candidate system | EVIDENCE REQUIRED |
| Restriction | Undetermined (ADR-03 open) | NONE | ADR-03 unresolved | EVIDENCE REQUIRED |
| CriticalControl | Forwood | CANDIDATE | None admitted; BC06 path undecided | EVIDENCE REQUIRED |
| Permit | Q4 / Engica | CANDIDATE | None admitted | EVIDENCE REQUIRED |
| Isolation | Q4 / Engica | CANDIDATE | None admitted | EVIDENCE REQUIRED |
| Signature | Corporate PKI (undetermined) | NONE | No credential mechanism evidenced | EVIDENCE REQUIRED |
| Schedule | Primavera P6 | CANDIDATE | None admitted | EVIDENCE REQUIRED |
G. Decision rights / authority register
§19 · OwnerNamed ≠ OwnerValidated
| Role | Material decision | Scope | Named party | Validation | Evidence required |
|---|---|---|---|---|---|
| Accountable | Authorize pre-start release of work at a location | Project × Area × Shift | Construction Superintendent (role only) | OWNER NAMED NOT VALIDATED | Signed decision-rights confirmation with effective period |
| Owner | Own the integrated readiness decision context | Project | Not assigned | UNASSIGNED | Corporate product/service ownership assignment |
| Steward | Maintain Location & SIMOPS master data | Area | Vacant (scenario G-01) | UNASSIGNED | Named steward + accepted terms of reference (ADR-14) |
| Approver | Approve permit / work authorization | Area × Activity × Risk | External (Q4 authority) | OWNER NAMED NOT VALIDATED | Confirmation that approval authority remains external and is not mirrored |
| Executor | Confirm location and crew at the work front | Location × Shift | Crew Lead (role only) | OWNER NAMED NOT VALIDATED | Role-to-decision-right mapping accepted by line management |
| Custodian | Custody of signature and audit evidence | Enterprise | Not assigned | UNASSIGNED | Records custody assignment + retention class |
| Escalation | Resolve HOLD/STOP escalation out of hours | Project × Shift | Not assigned | UNASSIGNED | Escalation matrix with effective periods |
| Delegate | Act for an unavailable approver | Scoped delegation | Not assigned | UNASSIGNED | Delegation policy + revocation mechanism evidence |
- DecisionRight is never inferred from role
- DecisionRight is never inferred from system permission
- DecisionRight is never inferred from competency
- DecisionRight is never inferred from signature
- DecisionRight is never inferred from prior approval
H. External dependency register
§27 · inherited 15 → independently reconstructed 18
| ID | Affected capability | Required decision | Competent owner | Current evidence | Safe interim behaviour | Closure predicate | Status |
|---|---|---|---|---|---|---|---|
| EXT-01 | Document retrieval (CAP-03) | Aconex API availability and extract scope | Corporate Document Control Manager | None | Mandatory document unverifiable → HOLD | Documented API capability + agreed extract contract | OPEN |
| EXT-02 | Document authority (CAP-04) | Who holds document-status authority | Document Control Manager | None | No automatic revision election | Named authority confirms status semantics | OPEN |
| EXT-03 | Identity & session (CAP-20) | Corporate IAM authentication mechanism | IAM Owner | None | No material decision without authenticated identity | IAM integration pattern accepted | OPEN |
| EXT-04 | Decision rights (CAP-20) | Source of decision rights and delegation | Project Director + IAM Owner | None | AuthorityResolutionState = UNRESOLVED → fail closed | Authoritative decision-rights register exists | OPEN |
| EXT-05 | Permit / isolation (CAP-18) | Q4/Engica read integration feasibility | Work Control Process Owner | None | Permit state unverifiable → HOLD | Integration feasibility confirmed in writing | OPEN |
| EXT-06 | Critical control (CAP-17) | Forwood integration or formal rescope (BC06 Path A/B) | Corporate ES&H | None | Critical control SIMULATED → not usable for release | Path A evidence or recorded Path B rescope | OPEN |
| EXT-07 | Competency (CAP-08) | Authoritative competency source (ADR-04) | Training & Competency Manager | None | Unverifiable competency → role not assignable | Source designated and interface agreed | OPEN |
| EXT-08 | Fitness decision (CAP-09) | Minimized fitness fact contract | Occupational Health + Privacy Officer | None | NOT_CONFIRMED default | Privacy-approved fact contract | OPEN |
| EXT-09 | Tool readiness (CAP-12) | Identify tool/equipment system of record | Equipment Manager | None | Unverifiable certification → tool unusable | System identified with interface capability | OPEN |
| EXT-10 | Signature credential (CAP-13) | Credential / PKI mechanism | Corporate Security | None | Signature evidence captured but no legal claim made | Credential mechanism approved | OPEN |
| EXT-11 | Signature legal sufficiency (CAP-13) | Legal sufficiency of digital signature | Legal Counsel | None | No DigitalNotary / LegallyBinding claim | Legal opinion issued | OPEN |
| EXT-12 | Location stewardship (CAP-02) | Named Location data steward (ADR-14) | Project Director | Role defined, party vacant | Location change requires manual verification | Named steward accepts terms of reference | UNDER VALIDATION |
| EXT-13 | Restriction authority (CAP-19) | Authoritative restriction system (ADR-03) | Project Controls + ES&H | None | Restrictions treated as non-compensable blockers | ADR-03 decided with owner evidence | OPEN |
| EXT-14 | Prospective measurement (CAP-25) | BEFORE measurement baseline start authorization | Project Director | None | BC09Protection ACTIVE; no pilot exposure | Prospective collection formally underway | OPEN |
| EXT-15 | Offline signature reconciliation (CAP-15) | Authority to reconcile signatures captured offline against a changed object version | Corporate Legal + Work Control Process Owner | None — not material to the primary demonstration | Offline signature whose object version changed → SignatureApplicability LOST, decision re-required | Named authority defines offline reconciliation rules and evidence | OPEN |
| EXT-16 | All production capabilities (CAP-26) | Corporate development organization accepting industrialization | Corporate IT / Digital Delivery | None | Handover package remains READY_TO_ENGAGE only | Named delivery organization accepts the handover package | OPEN |
| EXT-17 | Security constraints (H-23) | Cybersecurity approval of the target solution pattern | Corporate Cybersecurity | None | No production environment; prototype isolated with synthetic data | Security review completed with disposition | OPEN |
| EXT-18 | Non-functional requirements (§39) | SLA / SLO / RTO / RPO / retention targets | Service Owner (unassigned) | None | Classified REQUIREMENT_REQUIRED_FROM_COMPETENT_OWNER; nothing invented | NFR set issued by competent owner | OPEN |
New IDs assigned only for dependencies created by corporate industrialization scope; no historical ID reused or renumbered.
I. EXT-15 explicit disposition
§11 · mandatory carry-forward
Present in
- CorporateHandover (H-20, H-21)
- OperationalRevalidation (§Q)
- SignatureGovernance
- OfflineModel
- ProductionReadiness (deferred, entry unmet)
Explicitly excluded from any scope-based filtering; it may not disappear because it was not demonstrated.
J. Corporate implementation acceptance criteria
§12–13 · technology may differ, semantics may not
SameGovernedFacts ∧ SameRuleVersions ∧ SameConfiguration ∧ SameEvaluationTimestamp ∧ SameDecisionRights ⇒ MateriallyEquivalentDecision
| ID | Criterion | Verification method | Non-compensable |
|---|---|---|---|
| CIAC-01 | Material semantics of FC-FPSO-01…08 preserved regardless of technology | Contract clause conformance review | YES |
| CIAC-02 | Equivalence predicate holds against the reference PureCore for a governed test corpus | Differential execution vs reference implementation | YES |
| CIAC-03 | EvaluationTimestamp is a governed input, never an implicit system clock read inside rules | Code and design review + temporal test set | YES |
| CIAC-04 | XR-TEMP-01 enforced: no material decision relies on a temporally expired fact | Temporal adversarial test suite | YES |
| CIAC-05 | EffectiveFrom / ValidUntil / RevalidationTrigger / DecisionImpact retained on every temporal fact | Data model review | YES |
| CIAC-06 | No-compensation logic preserved: no weighted or averaged readiness score | Decision engine review | YES |
| CIAC-07 | Permission ≠ Authority enforced; decision rights consumed, never inferred | Authority test suite | YES |
| CIAC-08 | SignatureEvidence immutable and separated from evaluated SignatureApplicability | Signature lifecycle test | YES |
| CIAC-09 | SYSTEM_PROPOSED never consumed as HUMAN_CONFIRMED by any rule | AI/rule firewall test | YES |
| CIAC-10 | Fail-closed behaviour on unverifiable mandatory conditions | Failure containment test | YES |
| CIAC-11 | Event-sourced sync with reconciliation; no last-write-wins | Concurrency and offline test | YES |
| CIAC-12 | Idempotent event intake under retry and duplicate delivery | Idempotency test | NO |
| CIAC-13 | Full decision reconstruction from persisted provenance | Audit reconstruction exercise | YES |
| CIAC-14 | Rule versions explicitly recorded on every persisted decision | Decision record schema review | YES |
K. Requirement-to-handover traceability
§14 · TraceabilityBreaks = 0
| Architecture requirement | Contract | Clause | Interaction | Prototype | Verification | Simulation | Acceptance criterion |
|---|---|---|---|---|---|---|---|
| AR-LOC-01 Location context inheritance | FC-FPSO-01 | CL-01.4 confirmation act | S03 Location Confirmation | confirmLocation() | ICV-R04 / FVT-03 | T2–T3 | CIAC-01 |
| AR-DOC-02 No automatic revision election | FC-FPSO-02 | CL-02.7 election | S05 Document Set | electRevision() | ICV-R07 / FVT-08 | T6 | CIAC-01 |
| AR-PKG-03 Proposal vs confirmation separation | FC-FPSO-03 | CL-03.5 | S07 Preventive Package | confirmPackageItem() | ICV-R09 / FVT-11 | T8 | CIAC-09 |
| AR-CRW-04 Role-slot inheritance | FC-FPSO-04 | CL-04.6 | S09 Crew Confirmation | assignRoleSlot() | ICV-R12 / FVT-14 | T10 | CIAC-07 |
| AR-RSK-05 IPERC continuo | FC-FPSO-05 | CL-05.3 | S11 IPERC | evaluateIperc() | ICV-R15 / FVT-18 | T12 | CIAC-06 |
| AR-DLT-06 Field delta reassessment | FC-FPSO-06 | CL-06.2 | S13 Delta Assessment | assessFieldDelta() | ICV-R18 / FVT-21 | T16–T18 | CIAC-10 |
| AR-TOL-07 Tool temporal validity | FC-FPSO-07 | CL-07.4 | S14 Tool Readiness | evaluateToolValidity() | ICV-R21 / FVT-25 | T19 | CIAC-04 |
| AR-SIG-08 Signature evidence vs applicability | FC-FPSO-08 | CL-08.5 / CL-08.9 | S16 Signature | captureSignature() / evaluateSignatureApplicability() | ICV-R24 / FVT-29 | T20–T21 | CIAC-08 |
| AR-TMP-09 Temporal coherence (XR-TEMP-01) | Cross-contract | XR-TEMP-01 | All screens | evaluationTimestamp guard | TADV-01…08 | T17 | CIAC-03 / CIAC-04 |
| AR-AUT-10 Permission ≠ Authority | Cross-contract | AUTH-INV-3 | All decision actions | resolveDecisionRight() | ICV-R02 | T11 | CIAC-07 |
| AR-SIM-11 SIMOPS compositional rules | Cross-contract | CUM-1…CUM-7 | S04 SIMOPS Context | evaluateSimops() | ICV-R06 / FVT-06 | T15 | CIAC-06 |
| AR-OFF-12 Offline & recovery | Cross-contract | OFF-INV-2 | S15 Offline Queue | queueEvent() / reconcile() | ICV-R23 | T14 | CIAC-11 |
L. G-FPSO-08 — corporate development handover readiness
§15
| Predicate | Value | Basis |
|---|---|---|
| BaselineLineageComplete | TRUE | 15 lineage rows reconstructed; superseded baselines flagged historical. |
| FunctionalRequirementsOfRecordComplete | TRUE | FC-FPSO-01…08 at FUNCTIONAL-BASELINE-REV1, 38-element schema each. |
| InterfaceBoundariesExplicit | TRUE | 10 candidate systems with read/write/freshness/failure/offline behaviour. |
| AuthorityBoundaryExplicit | TRUE | Authority register + 5 inference prohibitions. |
| SourceAuthorityUncertaintyExplicit | TRUE | No object claims validated source authority. |
| OpenDependenciesPreserved | TRUE | EXT-15 explicitly carried forward; 18 dependencies preserved. |
| PrototypeVsProductionBoundaryExplicit | TRUE | No capability classified PRODUCTION_READY. |
| AcceptanceCriteriaDefined | TRUE | CIAC-01…CIAC-14 with verification methods. |
| NoUnsupportedAuthorityClaim | TRUE | All authority rows are NAMED_NOT_VALIDATED or UNASSIGNED. |
| NoUnsupportedIntegrationClaim | TRUE | All external systems remain candidates; no API fabricated. |
| NoEvidenceClassPromotion | TRUE | Design/verification/simulation evidence remains at its own class. |
| TraceabilityBreaks = 0 | TRUE | 12 chains complete architecture → acceptance criterion. |
M. Operational evidence admission register
§17–18 · existing evidence infrastructure preserved, not replaced
| Component | Status | Note |
|---|---|---|
| /oei — Owner Evidence Intake | PRESERVED | Questionnaire baseline PH6A-W1-OEAVQ-REV1 frozen; 7-check assessment intact. |
| /board — Operational Evidence Execution Board | PRESERVED | 28 evidence requests ER-01…ER-28. |
| /erx — Evidence Request Exchange | PRESERVED | Wave 1 requests linked. |
| /bcw — Blocking Condition Closure Workstream | PRESERVED | BC-01…BC-09 in three frozen Mesa packages. |
| External dependency register | EXTENDED | Extended by MPC to 18 entries; no historical entry altered. |
| Owner response register | PRESERVED | No owner responses admitted to date. |
| Evidence reconciliation | PRESERVED | Contradiction register empty because no evidence has been admitted. |
| Evidence ID | Claim supported | Source | Owner | Owner authority | Class | Quality | Predicate | Disposition |
|---|---|---|---|---|---|---|---|---|
| ER-01 | Aconex interface capability | Not received | Document Control Manager | NOT VALIDATED | OPERATIONAL_CLOSURE_EVIDENCE | NONE | BC-01 | EVIDENCE REQUIRED |
| ER-06 | IAM authentication and role model | Not received | IAM Owner | NOT VALIDATED | OPERATIONAL_CLOSURE_EVIDENCE | NONE | BC-02 | EVIDENCE REQUIRED |
| ER-07 | Decision-rights source | Not received | Project Director | NOT VALIDATED | OPERATIONAL_CLOSURE_EVIDENCE | NONE | BC-02 | EVIDENCE REQUIRED |
| ER-11 | Lifecycle / state governance ownership | Not received | Work Control Process Owner | NOT VALIDATED | OPERATIONAL_CLOSURE_EVIDENCE | NONE | BC-03 | EVIDENCE REQUIRED |
| ER-16 | Stewardship assignment (Location) | Role defined only | Project Director | NOT VALIDATED | DESIGN_EVIDENCE | INSUFFICIENT | BC-04 (not satisfied) | INCONCLUSIVE |
| ER-17 | Classification and retention policy | Not received | Data Governance Lead | NOT VALIDATED | OPERATIONAL_CLOSURE_EVIDENCE | NONE | BC-05 | EVIDENCE REQUIRED |
Admitted 0 · Confirmed 0 · Inconclusive 1 · Evidence required 5. No item reached OperationalClosureEvidence quality. Missing evidence is EVIDENCE_REQUIRED, not FAIL.
N–T. Operational validation domains
§19–26 · authority, source, IAM, signature, data governance, privacy, critical control, document
| ID | Domain | Items required | Evidence held | Status | Blocking | Note |
|---|---|---|---|---|---|---|
| V-AUTH | Authority validation (§19) | Accountable · Owner · Steward · Approver · Executor · Custodian · Escalation · Delegate | Roles defined in design; no validated party for any material decision | UNVALIDATED | BLOCKING | OwnerNamed ≠ OwnerValidated. 6 of 8 roles unassigned. |
| V-SRC | Source authority validation (§20) | Document · WorkPackage / JobCard · Location · Identity · Competency · Training · FitnessDecision · Tool · Equipment · Restriction · CriticalControl · Permit · Isolation · Signature · Schedule | 0 of 15 objects have validated source authority | UNVALIDATED | BLOCKING | SystemConnected ≠ SystemAuthoritative preserved. |
| V-IAM | IAM operational validation (§21) | AuthenticationMechanism · IdentitySource · RoleAssignment · PermissionModel · DecisionRightSource · Delegation · Revocation · SessionValidity · StaleRoleBehaviour · OfflineAuthorityBehaviour | Mock IAM only | UNVALIDATED | BLOCKING | Mock IAM behaviour cannot close these requirements. |
| V-SIG | Digital signature validation (§22) | IdentityBinding · CredentialMechanism · TimestampMechanism · ObjectVersionBinding · IntegrityReference · Revocation · Retention · OfflineReconciliation (EXT-15) · EvidenceRequirements | Design model only; no legal, security or PKI evidence | UNVALIDATED | BLOCKING | No DigitalNotary / LegallyBinding / NonRepudiation claim made. |
| V-DG | Data governance validation (§23) | DataOwner · DataSteward · Classification · Retention · Privacy · WriteAuthority · CorrectionAuthority · DataQualityResponsibility · HistoricalRecordCustody | None admitted | UNVALIDATED | BLOCKING | BC-05 remains open. |
| V-PRI | Privacy / personnel data (§24) | FitnessDecisionFact · CompetencyDecisionFact · TrainingDecisionFact | Design confirms decision-fact-only consumption; owner approval absent | PARTIAL | NON BLOCKING | Data minimization designed in; approval still required (EXT-08). |
| V-CC | Critical control governance (§25) | CriticalControlSource · ControlOwner · VerificationAuthority · Validity · ChangeBehaviour · FieldConflictBehaviour · EvidenceRequirement | Critical control remains SIMULATED; BC-06 Path A/B undecided | UNVALIDATED | BLOCKING | Prototype configuration cannot establish enterprise critical-control authority. |
| V-DOC | Document governance (§26) | Document source · Revision governance · Supersession · Effective-date behaviour · Applicability authority · Document-status authority · Retention/custody | NoAutomaticRevisionElection preserved in design; no owner confirmation | UNVALIDATED | BLOCKING | EXT-01 / EXT-02 open. |
| V-FLD | Field preconditions (§30) | Device provisioning · Connectivity profile · Offline cache governance · Field support coverage | None admitted | UNVALIDATED | BLOCKING | BC-08 remains open. |
V. BC revalidation
§28 · status derived from current evidence, historical status is context only
| BC | Title | Historical status | Evidence-derived status | Evidence basis |
|---|---|---|---|---|
| BC-01 | Interfaces | REMAINS_OPEN | OPEN BLOCKING | No interface capability evidence admitted (EXT-01/03/05/09). |
| BC-02 | IAM | REMAINS_OPEN | OPEN BLOCKING | Mock IAM only; V-IAM UNVALIDATED. |
| BC-03 | Lifecycle / state governance | REMAINS_OPEN | OPEN BLOCKING | State models designed and verified; governance ownership unevidenced. |
| BC-04 | Stewardship / change governance | REMAINS_OPEN | OPEN BLOCKING | Location steward vacant (EXT-12 UNDER_VALIDATION). |
| BC-05 | Classification / retention | REMAINS_OPEN | OPEN BLOCKING | V-DG UNVALIDATED. |
| BC-06 | Critical control | REMAINS_OPEN | OPEN BLOCKING | Path A/B decision not taken; control SIMULATED. |
| BC-07 | Development / support ownership | REMAINS_OPEN | OPEN BLOCKING | No corporate delivery organization accepted handover (EXT-16). |
| BC-08 | Field preconditions | REMAINS_OPEN | OPEN BLOCKING | V-FLD UNVALIDATED. |
| BC-09 | Prospective measurement | REMAINS_OPEN (time-irreversible) | OPEN BLOCKING | No prospective BEFORE baseline started; protection ACTIVE. |
W. BC-09 measurement readiness
§29 · time-irreversible; protection ACTIVE
| Construct | Definition | Source |
|---|---|---|
| ProcessTime | Elapsed time of the governed operational process | Observed operational measurement only |
| SystemTime | Time spent interacting with the system | Instrumented client telemetry (not yet enabled) |
| WaitingTime | Time blocked awaiting an external decision or fact | Restriction / HOLD timestamps |
| ManualHandlingTime | Time spent on manual paper or verbal coordination | Prospective field observation |
| ReworkTime | Time consumed re-doing an invalidated step | Reassessment event lineage |
| TimeSaved | Difference between validated BEFORE and AFTER process time | Requires prospective BEFORE baseline |
| TimeReleased | Capacity released to other productive work | Requires supervisor attribution |
| ProductiveTimeCaptured | Released time actually converted to productive work | Requires independent confirmation |
| FinancialValue | Monetary translation of confirmed productive time | Requires finance authority |
Prohibited: RetrospectiveBaselineManufacturing · DoubleAttribution · SimulationToROIExtrapolation. Any pilot exposure before the BEFORE baseline starts permanently destroys the measurement opportunity.
X. G-PH6A — operational revalidation decision
§30–31 · HARD STOP after C2
| Closure predicate | Satisfied | Observed |
|---|---|---|
| CriticalOperationalBlockers = 0 | FALSE | 3 critical operational blockers open |
| HighUncontrolledOperationalBlockers = 0 | FALSE | 9 blocking BCs, controlled but unclosed |
| RequiredAuthorityValidated | FALSE | V-AUTH UNVALIDATED |
| RequiredSourceAuthorityValidated | FALSE | V-SRC UNVALIDATED (0/15 objects) |
| RequiredIAMBoundaryValidated | FALSE | V-IAM UNVALIDATED |
| RequiredDataGovernanceValidated | FALSE | V-DG UNVALIDATED |
| RequiredSignatureGovernanceValidated | FALSE | V-SIG UNVALIDATED (incl. EXT-15) |
| RequiredCriticalControlGovernanceValidated | FALSE | V-CC UNVALIDATED |
| RequiredFieldPreconditionsValidated | FALSE | V-FLD UNVALIDATED |
| BC09ProspectiveMeasurementReady | FALSE | NOT_READY; protection ACTIVE |
HARD STOP after C2. Downstream stages C3–C5 are not executed and no synthetic pilot, production or handover results are generated.
Y–AD. Downstream stages not executed
§32–45 · no synthetic pilot, production or handover results generated
| § | Item | Status | Reason |
|---|---|---|---|
| Y | Controlled Pilot definition (PH6A-FPSO-PILOT-BASELINE-REV0) | NOT CREATED | Entry condition G-PH6A = PASS not met. Creating a pilot baseline now would imply authorization that does not exist. |
| Z | Pilot evidence / acceptance | NOT AVAILABLE | No pilot executed; PilotExposure = PROHIBITED. |
| AA | Production readiness assessment | NOT AUTHORIZED | Requires accepted real pilot evidence. |
| AB | G-PH7 decision | NOT EVALUABLE | Phase7 remains NO_GO; no simulated production GO permitted. |
| AC | Production release baseline | NOT CREATED | Requires actual deployment authorization. |
| AD | Operational handover | NOT AUTHORIZED | Requires competent operational acceptance that does not exist. |
AE. Evidence maturity register
§46 · no silent promotion between levels
| Level | Evidence class | Achieved | Artefacts |
|---|---|---|---|
| 1 | DESIGN_EVIDENCE | ACHIEVED | IADA-REV1, SEAL-01, BXIA-REV0, FUNCTIONAL-BASELINE-REV1, IAD-REV2 |
| 2 | IMPLEMENTATION_EVIDENCE | ACHIEVED | PROTOTYPE-REV0 |
| 3 | SOFTWARE_VERIFICATION_EVIDENCE | ACHIEVED | ICV-REV0, FVT-REV0 |
| 4 | SIMULATION_EVIDENCE | ACHIEVED | SCENARIO-BASELINE-REV0, E2E-DEMO-REV0, DAA-REV0 |
| 5 | OPERATIONAL_CLOSURE_EVIDENCE | NOT ACHIEVED | NOT_YET_ACQUIRED — 0 items admitted |
| 6 | PILOT_EVIDENCE | NOT ACHIEVED | NOT_AVAILABLE |
| 7 | PRODUCTION_EVIDENCE | NOT ACHIEVED | NOT_AVAILABLE |
AF. Value capture register
§47
| Construct | Value | Claim status |
|---|---|---|
| SimulatedMeasurement | Present — scenario timings T0…T21 | VALUE HYPOTHESIS ONLY |
| ObservedOperationalMeasurement | None | NOT AVAILABLE |
| TimeSaved | Not claimed | REQUIRES PROSPECTIVE BASELINE |
| TimeReleased | Not claimed | REQUIRES PROSPECTIVE BASELINE |
| ProductiveTimeCaptured | Not claimed | REQUIRES INDEPENDENT CONFIRMATION |
| FinancialValue | Not claimed | REQUIRES FINANCE AUTHORITY |
NoDoubleCounting · NoSimulationAsActualBaseline · NoRetrospectiveBeforeFabrication
AG. Corporate decision register
§49 · bridge between engineering closure and organizational closure
| ID | Decision required | Affected capability | Competent authority | Evidence required | Current evidence | Status | Safe interim behaviour | Gate affected |
|---|---|---|---|---|---|---|---|---|
| CD-01 | Accept the corporate development handover package and name a delivery organization | All (CAP-01…26) | Corporate IT / Digital Delivery | Handover acceptance record | None | OPEN | Package remains READY_TO_ENGAGE | BC-07 / G-PH6A |
| CD-02 | Designate the system of record for each of the 15 governed objects | CAP-03/07/12/17/18 | Process owners per object | Object-by-object owner confirmation | None | OPEN | All objects treated as candidate sources; fail closed | G-PH6A |
| CD-03 | Approve IAM integration pattern and decision-rights source | CAP-20 | IAM Owner + Project Director | IAM architecture + authority register | None | OPEN | No material decision without authenticated identity and resolved right | BC-02 |
| CD-04 | Critical control Path A (real integration) or Path B (formal rescope) | CAP-17 | Corporate ES&H | Decision record with DecisionAuthority, Reason, PilotEvidenceLost, ResidualRisk, Phase7Impact | None | OPEN | Critical control SIMULATED and not usable for release | BC-06 |
| CD-05 | Digital signature legal sufficiency and credential mechanism | CAP-13/15 | Legal + Corporate Security | Legal opinion + security approval | None | OPEN | Signature captured as evidence only; no legal claim | G-PH6A / G-PH7 |
| CD-06 | Offline signature reconciliation authority (EXT-15) | CAP-15 | Legal + Work Control Process Owner | Signed offline reconciliation rule | None | OPEN | Applicability lost on version divergence; decision re-required | G-PH6A |
| CD-07 | Data classification, retention and custody policy for readiness evidence | CAP-23 | Data Governance Lead | Approved policy | None | OPEN | Prototype retains synthetic data only | BC-05 |
| CD-08 | Name the Location data steward and accept terms of reference | CAP-02 | Project Director | Acceptance record | Role defined, party vacant | OPEN | Manual verification of location changes | BC-04 |
| CD-09 | Authorize the start of prospective BEFORE measurement | CAP-25 | Project Director | Measurement start record | None | OPEN | BC09Protection ACTIVE; no pilot exposure | BC-09 |
| CD-10 | Issue non-functional requirements (SLA/SLO/RTO/RPO/retention) | CAP-26 | Service Owner (unassigned) | Approved NFR specification | None | OPEN | REQUIREMENT_REQUIRED_FROM_COMPETENT_OWNER; nothing invented | G-PH7 |
| CD-11 | Cybersecurity review and disposition of the target pattern | All production capabilities | Corporate Cybersecurity | Security approval record | None | OPEN | No production environment provisioned | G-PH7 |
| CD-12 | Resolve ADR-03 authoritative restriction system | CAP-19 | Project Controls + ES&H | ADR decision record | None | OPEN | Restrictions remain non-compensable blockers | G-PH6A |
AH. Operational closure dashboard
§50 · no compensated aggregate scoring
Next authorized action
Engage the corporate development organization with PH6A-CORPORATE-DEVELOPMENT-HANDOVER-REV0 and continue acquiring OperationalClosureEvidence against the 9 blocking BCs and 18 external dependencies. No pilot exposure.
NO_COMPENSATED_AGGREGATE_SCORING — a single blocking condition is displayed as blocking regardless of overall progress.
AI. Master gate register
§48 · historical decisions preserved, never overwritten
| Gate | Title | Decision | Macro | Row |
|---|---|---|---|---|
| G-FPSO-01 | Architecture Impact Assessment | PASS | PH6A-FPSO-AIA-REV0 | HISTORICAL |
| G-FPSO-02 | Functional Contract Definition | PASS | PH6A-FPSO-FCD-REV0 | HISTORICAL |
| G-FPSO-03 | Contract Assurance & Baseline Freeze | PASS | PH6A-FPSO-FCA-REV0 | HISTORICAL |
| G-FPSO-04 | Design-to-Contract Conformance | PASS | PH6A-FPSO-IAD-REV2 | HISTORICAL |
| G-FPSO-04B | Bechtelized Application Conformance | PASS | PH6A-FPSO-BAC-REV0 | HISTORICAL |
| G-FPSO-05 | Implementation Conformance | PASS | PH6A-FPSO-ICV-REV0 | HISTORICAL |
| G-FPSO-06 | Scenario Baseline Freeze | PASS | PH6A-FPSO-MPB-REV0 | HISTORICAL |
| G-FPSO-07 | Demonstrator Acceptance | PASS | PH6A-FPSO-DAA-REV0 | HISTORICAL |
| G-FPSO-08 | Corporate Development Handover Readiness | PASS | PH6A-FPSO-MPC-REV0 | APPENDED |
| G-PH6A | Phase 6A Operational Revalidation | HOLD | PH6A-FPSO-MPC-REV0 | APPENDED |
| G-PILOT | Controlled Pilot Gate | NOT EVALUABLE | PH6A-FPSO-MPC-REV0 | APPENDED |
| G-PH7 | Production Readiness | NOT EVALUABLE | PH6A-FPSO-MPC-REV0 | APPENDED |
| G-HANDOVER | Operational Handover Gate | NOT EVALUABLE | PH6A-FPSO-MPC-REV0 | APPENDED |
AJ. Open findings & residual risk
§51 · 6 findings · 0 critical uncontrolled
Macro C discipline regression
20/20 PASS
| ID | Statement | Result | Basis |
|---|---|---|---|
| MPC-R01 | MacroPromptC authorization independently reconstructed, not assumed | PASS | 5/5 authorization checks recomputed from MPB exports. |
| MPC-R02 | No implementation derived from a superseded baseline | PASS | 3 superseded baselines flagged historical only. |
| MPC-R03 | Operational boundary preserved unchanged by C1 | PASS | Boundary states unmodified outside gates. |
| MPC-R04 | No capability classified PRODUCTION_READY | PASS | 26 capabilities classified across governed classes only. |
| MPC-R05 | No external API or integration capability fabricated | PASS | All 10 interfaces recorded as candidate with EVIDENCE_REQUIRED / UNDER_VALIDATION. |
| MPC-R06 | EXT-15 carried forward and visible in all mandated registers | PASS | Present in handover, revalidation, signature and offline models. |
| MPC-R07 | External dependency IDs never renumbered | PASS | EXT-01…15 preserved; EXT-16…18 newly assigned. |
| MPC-R08 | Dependency count independently reconstructed, not forced to 15 | PASS | 15 carried forward + 3 new corporate-scope dependencies. |
| MPC-R09 | Traceability chain complete with zero breaks | PASS | 12 chains architecture → acceptance criterion. |
| MPC-R10 | No evidence item promoted between maturity classes | PASS | Levels 5–7 unachieved. |
| MPC-R11 | Missing evidence recorded as EVIDENCE_REQUIRED, never FAIL or PASS | PASS | 5 EVIDENCE_REQUIRED, 1 INCONCLUSIVE, 0 admitted. |
| MPC-R12 | BC status derived from current evidence, not inherited status | PASS | Each BC re-derived from admitted evidence (none). |
| MPC-R13 | BC09 protection preserved; no retrospective baseline manufactured | PASS | 9 measurement constructs defined; no value claimed. |
| MPC-R14 | No synthetic pilot, production or handover results generated after HOLD | PASS | C3–C5 not executed; entry conditions unmet. |
| MPC-R15 | Dashboard uses no compensated aggregate scoring | PASS | Blocking conditions surfaced individually; no composite score. |
| MPC-R16 | Historical gate decisions preserved and never overwritten | PASS | 8 historical rows retained; 5 new rows appended. |
| MPC-R17 | Equivalence predicate stated for corporate reimplementation | PASS | 5-term antecedent required. |
| MPC-R18 | Temporal coherence carried into acceptance criteria | PASS | CIAC-03/04/05 enforce XR-TEMP-01. |
| MPC-R19 | No unsupported legal / notary / non-repudiation claim | PASS | V-SIG explicitly withholds all three claims. |
| MPC-R20 | Macro status is a specific controlled status, not generic ACCEPTED | PASS | Status = CORPORATE_HANDOVER_READY_OPERATIONAL_EVIDENCE_PENDING. |
§56 Hard stop conditions
| Condition | Applies |
|---|---|
| CorporateHandoverIncomplete | FALSE |
| OperationalClosureEvidenceInsufficient | TRUE |
| CriticalOperationalBlocker > 0 | TRUE |
| HighUncontrolledOperationalBlocker > 0 | FALSE |
| RequiredAuthorityUnvalidated | TRUE |
| RequiredSourceAuthorityUnvalidated | TRUE |
| RequiredIAMUnvalidated | TRUE |
| RequiredSignatureGovernanceUnvalidated | TRUE |
| RequiredDataGovernanceUnvalidated | TRUE |
| RequiredCriticalControlGovernanceUnvalidated | TRUE |
| BC09MeasurementBaselineNotReady | TRUE |
Downstream progression stopped. No bypass via prototype, mock or simulation evidence, management preference or AI inference.