Non-Destructive Architecture Preservation Overlay
PH6A-FPSO-CORRECTION-PROMPT-02-REV2 · MM WTP YANACOCHA / BECHTEL GLOBAL · EXECUTION CLASS = CONTROLLED_NON_DESTRUCTIVE_ASSURANCE_OVERLAY · REBASELINE MODE = PRESERVE_AND_EXTEND. This overlay adds assurance; it deletes, overwrites and supersedes nothing.
NO VALID ENGINEERING ASSET ALREADY DEVELOPED SHALL BE LOST.
0 · Non-Destructive Mandate
Any attempt to delete or overwrite an accepted artifact → ExecutionDisposition = HOLD_PRESERVATION_VIOLATION.
1 · Global Engineering Preservation Freeze
3 · Non-Destructive Change Semantics
OUT_OF_CURRENT_SCOPE != INVALID · OUT_OF_CURRENT_SCOPE != DELETED · OUT_OF_CURRENT_SCOPE != FAILED · OUT_OF_CURRENT_SCOPE != NOT_DESIGNED · OUT_OF_CURRENT_SCOPE != NOT_REQUIRED_FOR_FUTURE · A capability may be DESIGNED_FOR_FUTURE_INDUSTRIALIZATION while NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE
4 · Two-Layer Program Architecture
Layer A executes now. Layer B is preserved for future industrialization — not failed, not deleted.
- · Conceptual Architecture
- · Functional Architecture
- · Assurance Architecture
- · Controlled Owner-Informed Validation
- · Controlled Simulation
- · Temporal Compliance Verification
- · Architecture Scalability Testing
- · Executive Demonstration
- · Executive Assurance Panel
- · Technical Closeout
- · Production IAM
- · Production Active Directory integration
- · Production Decision Rights
- · Production Authority Engine
- · Production Evidence Engine
- · Production Decision Engine
- · Production PKI
- · Production Source Authority
- · Production Signature Assurance
- · Production Offline / Edge capability
- · Production reconciliation
- · Production configuration governance
- · Production rule governance
- · Production Aconex integration
- · Production Q4 integration
- · Production Forwood integration
- · Production Engica integration
- · Production operational data
- · Production electronic signatures
- · Production cybersecurity hardening
- · Production service management
- · Production observability
- · Production monitoring
- · Production recovery
- · Production configuration baseline
- · Production seal
- · Continuous operational assurance
- · Production evidence acquisition
- · Production value realization
- · Enterprise reporting
6 · Temporal Compliance Baseline (imported without modification)
Imported from PH6A-FPSO-CORRECTION-PROMPT-01-REV0. These are now protected invariants.
8 · Core Architectural Invariants — Preserved and Enforced
- · INHERIT_CONTEXT_NEVER_INHERIT_AUTHORIZATION
- · NO_SILENT_READY
- · NO_LAST_WRITE_WINS
- · NO_FUTURE_DATED_DOCUMENTS
- · NO_BACKDATING
- · SignatureEvidence != SignatureApplicability
- · SignatureApplicability != DecisionRight
- · AuthenticatedIdentity != DecisionRight
- · Permission != DecisionRight
- · CandidateSource != AuthoritativeSource
- · Retrieved != Applicable
- · Applicable != Authorized
- · AIAdvisoryOutput != AuthorizedDecision
- · AI_ON_MaterialState = AI_OFF_MaterialState
- · FunctionalReadiness != PreventiveESHReadiness
- · No compensated readiness scoring
- · UnknownMaterialAuthority -> HOLD
- · UnknownMaterialSource -> HOLD / REASSESS
- · TechnologyFailure != ControlBypass
10 · G-FPSO-ARCH-01 — ARCHITECTURE & SCALABILITY ASSURANCE
Demonstrate that the current architecture extends to another area, discipline, work package, location, Core Process, Critical Control set, activity context or project environment primarily through governed configuration and controlled extension, without breaking protected invariants.
11 · Architecture Assurance Dimensions
| Dimension | Classification | Verdict | Basis |
|---|---|---|---|
| FunctionalBoundaryIntegrity | CONFIGURATION_ONLY | PASS | Second-area instantiation crosses no functional boundary; Core untouched. |
| ArchitectureContractIntegrity | CONFIGURATION_ONLY | PASS | AHP REV1.1 contracts unchanged by scope variation. |
| FunctionalContractIntegrity | CONFIGURATION_ONLY | PASS | FC-FPSO-01…08 accept new area/discipline as input data, not new states. |
| CoreProcessConfigurability | CONFIGURATION_ONLY | PASS | Core Process mapping is catalogue-driven. |
| CriticalControlConfigurability | CONTROLLED_EXTENSION | PASS_WITH_CONTROLLED_ACTIONS | New Critical Control set requires governed control-definition load and owner attestation (BC-06 path). |
| RequirementCatalogueScalability | CONFIGURATION_ONLY | PASS | Requirements of Record are configuration rows with applicability predicates. |
| RecordCatalogueScalability | CONFIGURATION_ONLY | PASS | Class B record types configured per activity/shift context. |
| LocationModelScalability | CONFIGURATION_ONLY | PASS | Location Operational Context Container is hierarchy-agnostic. |
| DecisionRightsScalability | CONTROLLED_EXTENSION | PASS_WITH_CONTROLLED_ACTIONS | New area owners require governed DecisionRight assignment; unresolved authority fails closed to HOLD (OER-01). |
| AuthorityModelScalability | CONFIGURATION_ONLY | PASS | Authority Engine resolves by scope tuple, not by hard-coded area. |
| SourceAuthorityScalability | CONTROLLED_EXTENSION | PASS_WITH_CONTROLLED_ACTIONS | Each new object class needs a declared authoritative source; UNKNOWN → HOLD/REASSESS. |
| EvidenceModelScalability | CONFIGURATION_ONLY | PASS | DEAP admission checks are class-based, not scope-based. |
| TemporalComplianceScalability | CONFIGURATION_ONLY | PASS | T01–T12 evaluated per document/record instance; invariants scope-independent. |
| DailyShiftRecordScalability | CONFIGURATION_ONLY | PASS | Actual date / shift / crew / location / activity match is generic. |
| ChangeControlScalability | CONFIGURATION_ONLY | PASS | ES&H Change Impact Classification applies to any scope. |
| ContinuousAssuranceScalability | CONTROLLED_EXTENSION | PASS_WITH_CONTROLLED_ACTIONS | CE01…CE18 subscriptions must be registered for the new source set. |
| SIMOPSScalability | CONFIGURATION_ONLY | PASS | CUM-1…CUM-7 thresholds are governed configuration per location. |
| RiskModelScalability | CONFIGURATION_ONLY | PASS | Consecuencia / Probabilidad matrix is scope-independent. |
| OfflineModelScalability | CONTROLLED_EXTENSION | PASS_WITH_CONTROLLED_ACTIONS | Offline authorization reconciliation remains EXT-15 dependent; NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE. |
| SignatureModelScalability | CONTROLLED_EXTENSION | PASS_WITH_CONTROLLED_ACTIONS | SignatureEvidence generic; SignatureApplicability requires new-scope DecisionRight data. |
| IntegrationBoundaryScalability | CONTROLLED_EXTENSION | PASS_WITH_CONTROLLED_ACTIONS | Adapter contracts versioned; new source instances are configuration + contract registration. |
| CybersecurityBoundaryIntegrity | CONFIGURATION_ONLY | PASS | Trust boundaries unchanged by scope addition; production hardening remains Layer B. |
| ConfigurationIsolation | CONFIGURATION_ONLY | PASS | Second area configured without mutating base-area configuration. |
| DataSegregation | CONFIGURATION_ONLY | PASS | Scope tuple segregates records, evidence and decisions. |
| PerformanceAssumptions | CONTROLLED_EXTENSION | PASS_WITH_CONTROLLED_ACTIONS | Aggregate SIMOPS evaluation grows pairwise; documented assumption for industrialization sizing. |
| Auditability | CONFIGURATION_ONLY | PASS | Append-only ledger unaffected by scope count. |
| TraceabilityIntegrity | CONFIGURATION_ONLY | PASS | Requirement→…→ValueMechanism chain instantiated for the second scope. |
| AI_OFF_MaterialStateEquivalence | CONFIGURATION_ONLY | PASS | Material state identical with AI advisory disabled in both scopes. |
| NoFutureDatedDocumentInvariant | CONFIGURATION_ONLY | PASS | Enforced in the second scope; future-dated PETAR rejected. |
| NoSilentReadyInvariant | CONFIGURATION_ONLY | PASS | Unresolved second-scope authority produced HOLD, never READY. |
| NoLastWriteWinsInvariant | CONFIGURATION_ONLY | PASS | BaseVersion conflict detected in second scope. |
12 · Controlled Scalability Test
BASE_DEMO_SCOPE = AWTP_WEST · SCALABILITY_TEST_SCOPE = CONTROLLED_SYNTHETIC_SECOND_AREA. Purpose: determine whether the architecture instantiates a new scope without redesigning the Core.
| Dimension | Base scope | Second scope | Classification | Disposition |
|---|---|---|---|---|
| Area | AWTP West — Water Treatment | TSF Lift 7 — Tailings Storage (synthetic) | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Location hierarchy | Area > Facility > System > Subsystem | Area > Embankment Sector > Cell > Bench | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Discipline | Mechanical / Electrical / Instrumentation | Civil / Earthworks / Geotechnical | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Activity | Pump alignment & loop check | Bulk fill placement & compaction control | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Crew | Crew MEC-A (8) | Crew CIV-D (14) | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Shift | Day A | Night B | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Work Package / IWP | IWP-AWTP-0142 | IWP-TSF-0771 | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Critical Controls | Energy isolation · Lifting · Confined space | Mobile equipment interaction · Ground/slope stability · Traffic management | CONTROLLED_EXTENSION | SCALABLE_WITH_CONTROLLED_EXTENSION |
| Requirements of Record | Electrical & mechanical requirement set | Geotechnical & haulage requirement set | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Governing Procedures | PETS-MEC-014 Rev.4 | PETS-CIV-032 Rev.2 (synthetic) | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Daily / Shift Records | IPERC Continuo · ATS · Tool checklist | IPERC Continuo · ATS · Equipment pre-use · OAT · Traffic plan check | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Source Authorities | Q4 · Aconex · P6 · Forwood | Q4 · Aconex · P6 · Forwood · Geotech monitoring source (UNDECLARED) | CONTROLLED_EXTENSION | SCALABLE_WITH_CONTROLLED_EXTENSION |
| Owner Roles | Area Superintendent AWTP | Earthworks Superintendent TSF | CONTROLLED_EXTENSION | SCALABLE_WITH_CONTROLLED_EXTENSION |
| Decision Rights | ROL-SUPT scope AWTP | ROL-SUPT scope TSF (unassigned at test time) | CONTROLLED_EXTENSION | SCALABLE_WITH_CONTROLLED_EXTENSION |
| SIMOPS context | 3 concurrent job cards | 5 concurrent job cards incl. mobile plant | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Risk context | Consecuencia 4 / Probabilidad 3 | Consecuencia 5 / Probabilidad 3 | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Tools | Torque tooling, calibrated instruments | Compaction testing equipment, survey instruments | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Equipment | Overhead crane, MEWP | Haul trucks, dozers, compactors | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Permit applicability | Energy isolation permit, confined space | Ground disturbance permit, traffic management permit | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
| Document applicability | Discipline-based applicability predicate | Same predicate, different catalogue rows | CONFIGURATION_ONLY | SCALABLE_BY_CONFIGURATION |
14 · Bechtelized ES&H Change Impact Classification
Clase 1 No Material · Clase 2 Cambio de configuración ES&H controlado · Clase 3 Cambio material de control ES&H · Clase 4 Cambio de línea base gobernante ES&H. Se usa la MATRIZ DE CONSECUENCIAS Y PROBABILIDADES (NivelConsecuencia / NivelProbabilidad / ClasificaciónDelRiesgoES&H). Sin puntuación compensada.
| ID | Change | Proposed | Final class | Riesgo ES&H | Assurance response | Overrides / reassessment |
|---|---|---|---|---|---|---|
| ECC-01 | Add second area location hierarchy rows (TSF Lift 7) | CLASS_1_NON_MATERIAL_CHANGE | CLASS_1_NON_MATERIAL_CHANGE | BAJO | DOCUMENT_CONFIGURATION_CONTROL_ONLY | — |
| ECC-02 | Register Class B record types for earthworks shift records | CLASS_2_CONTROLLED_ESH_CONFIGURATION_CHANGE | CLASS_2_CONTROLLED_ESH_CONFIGURATION_CHANGE | MEDIO | SCOPED_ESH_REVALIDATION | — |
| ECC-03 | Load new Critical Control set (mobile equipment interaction, ground stability) | CLASS_2_CONTROLLED_ESH_CONFIGURATION_CHANGE | CLASS_3_MATERIAL_ESH_CONTROL_CHANGE | CRITICO | TARGETED_ESH_CONTROL_REVALIDATION + GATE_RECHECK_AS_APPLICABLE | CriticalControlImpact = TRUE → MinimumChangeClass = MATERIAL_ESH_CONTROL_CHANGE |
| ECC-04 | Assign DecisionRights for TSF Earthworks Superintendent scope | CLASS_1_NON_MATERIAL_CHANGE | CLASS_2_CONTROLLED_ESH_CONFIGURATION_CHANGE | ALTO | SCOPED_ESH_REVALIDATION | DecisionRight / WorkAuthorization / RequirementOfRecord impact → ChangeClass cannot equal NON_MATERIAL_CHANGE · MaterialityReassessmentRequired = TRUE |
| ECC-05 | Adopt revised governing PETS baseline for earthworks discipline | CLASS_4_ESH_GOVERNING_BASELINE_CHANGE | CLASS_4_ESH_GOVERNING_BASELINE_CHANGE | ALTO | BASELINE_REASSESSMENT | — |
18 · Architecture Change Control
Evaluated for every proposed modification. Reopen only where a true material structural contradiction exists.
- · AffectedArchitectureContract
- · AffectedFunctionalContract
- · AffectedInvariant
- · AffectedRequirement
- · AffectedCriticalControl
- · AffectedDecisionRight
- · AffectedSourceAuthority
- · AffectedEvidenceObject
- · AffectedGate
- · AffectedSeal
19 · Demo Evidence Model & Environment Semantics
21 · Controlled Demo Scenarios
F-15 injects a synthetic architectural contradiction to verify the reopen path fires. No true contradiction exists in the preserved baseline; ArchitectureReopenRequired = FALSE for the real baseline.
| ID | Scenario | Expected | Actual | Result |
|---|---|---|---|---|
| NORMAL | Current governing procedure + valid records + DecisionRights + Critical Controls verified + double readiness | AUTHORIZED_AND_EXECUTED | AUTHORIZED_AND_EXECUTED | PASS |
| F-01 | Superseded governing procedure | HOLD | HOLD | PASS |
| F-02 | Future-dated IPERC / PETAR | REJECTED | REJECTED | PASS |
| F-03 | Current-date PETAR with later valid operational window | VALID_WITH_CONTROLLED_OPERATIONAL_WINDOW | VALID_WITH_CONTROLLED_OPERATIONAL_WINDOW | PASS |
| F-04 | Backdated record | REJECTED | REJECTED | PASS |
| F-05 | Critical Control invalid | HOLD_STOP | HOLD_STOP | PASS |
| F-06 | DecisionRight revoked | HOLD | HOLD | PASS |
| F-07 | Aggregate SIMOPS conflict (CUM rule) | HOLD_STOP | HOLD_STOP | PASS |
| F-08 | Tool calibration / inspection expired | REASSESS_HOLD | REASSESS_HOLD | PASS |
| F-09 | Signature cryptographically valid but authority invalid | NO_AUTHORIZATION | NO_AUTHORIZATION | PASS |
| F-10 | Offline stale authority | HOLD | HOLD | PASS |
| F-11 | Concurrent version conflict (BaseVersion mismatch) | CONFLICT_REASSESS | CONFLICT_REASSESS | PASS |
| F-12 | Unknown source authority | HOLD_REASSESS | HOLD_REASSESS | PASS |
| F-13 | Second area configured successfully | SCALABILITY_PASS | SCALABILITY_PASS | PASS |
| F-14 | Change requires functional extension | FUNCTIONAL_REASSESSMENT_REQUIRED | FUNCTIONAL_REASSESSMENT_REQUIRED | PASS |
| F-15 | True architecture contradiction (synthetic negative probe — none found) | ARCHITECTURE_REOPEN_REQUIRED | ARCHITECTURE_REOPEN_REQUIRED | PASS |
22 · Future Production Gates & Seal Preservation
FUTURE_PHASE_NOT_EXECUTED is not FAILED, DELETED, NOT_APPLICABLE or INVALID.
24 · Executive Assurance Panel — Dual Layer
Section A = current controlled demo assurance. Section B = future industrialization readiness. Future-state labels are never displayed as failures.
PH6A-IADA-REV1 preserved and referenced; no overwrite.
PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 after SADR remediation and independent retest.
CORRECTION-PROMPT-01 accepted; T01–T12 imported unchanged as protected invariants.
DEMONSTRATION_CONFIGURATION_BASELINE references design, functional, temporal, authority, source, control, SIMOPS, evidence, change and assurance models.
31 dimensions evaluated; 0 architecture change required; 8 controlled extensions.
Second synthetic area instantiated: 16 configuration-only, 4 controlled extension, 0 functional change, 0 architecture change.
Model scalable; operational assignment for new scope remains owner-dependent (OER-01).
Undeclared second-scope source correctly produced HOLD/REASSESS.
Demonstrated under simulation; real control verification remains BC-06 / OER-02.
Aggregate CUM evaluation exercised in both scopes; pairwise PASS never implies location PASS.
16/16 scenarios behaved as specified under CONTROLLED_DEMONSTRATION semantics.
Demo evidence class only; no promotion to operational or production evidence.
All 14 §33 closeout conditions satisfied for the current design/demo phase only.
Option C federated architecture retained in full.
AD / IAM integration designed; corporate validation is a future decision.
DecisionRight registry design preserved; owner attestation pending.
Object authority matrix preserved from Phase 5.
Q4 / Aconex / P6 / Forwood / Engica adapter contracts defined, not implemented.
Offline authorization reconciliation remains EXT-15.
PKI-backed signature evidence design preserved.
Trust boundary and hardening concepts preserved; G-FPSO-SEC-01 not executed.
OPERATIONAL_CLOSURE_EVIDENCE class preserved and empty by design.
Service model from Macro C preserved.
CE01…CE18 change-event model preserved intact.
PRODUCTION_CONFIGURATION_BASELINE = NOT_ESTABLISHED_IN_CURRENT_PHASE.
SEAL-02 designed, not applied. SEAL-01 immutable historical.
26 · Preserved Engineering Asset Register
PreservationStatus = PRESERVED for every material artifact. Nothing removed from traceability.
| ID | Artifact type | Baseline / parent | Ver. | Current status | Current demo use | Future industrialization use | Change restriction | Trace | Seal | Gate |
|---|---|---|---|---|---|---|---|---|---|---|
| PA-01 | DESIGN BASELINE | PH6A-IADA-REV1↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV1 | FROZEN | REFERENCED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | ADD_OR_CLARIFY_ONLY | /iada | PH6A-IADA-REV1-SEAL-01 | G-FPSO-03 |
| PA-02 | FUNCTIONAL BASELINE | PH6A-FPSO-FUNCTIONAL-BASELINE-REV1↳ PH6A-IADA-REV1 | REV1 | FROZEN | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | CONTROLLED_EXTENSION_ONLY | /retest | PH6A-IADA-REV1-SEAL-01 | G-FPSO-03 |
| PA-03 | ASSURANCE BASELINE | PH6A-II-SADR-REV0 + REM + RETEST↳ PH6A-IADA-REV1 | REV1 | ACCEPTED | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | APPEND_ONLY | /sadr · /rem · /retest | PH6A-IADA-REV1-SEAL-01 | G-FPSO-03 |
| PA-04 | ARCHITECTURE CONTRACTS | PH6A-AHP-REV1.1↳ PH6A-IADA-REV1 | REV1.1 | FROZEN | REFERENCED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | ADR_REQUIRED_TO_CHANGE | /ahp | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-05 | FUNCTIONAL CONTRACTS (FC-FPSO-01…08) | PH6A-FPSO-FCD-REV0↳ PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | REV0 | FROZEN | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | CONTROLLED_EXTENSION_ONLY | /fcd | PH6A-IADA-REV1-SEAL-01 | G-FPSO-03 |
| PA-06 | DESIGN LOCKS | PH6A-IADA-REV1-SEAL-01↳ PH6A-IADA-REV1 | REV1 | ACTIVE_AND_FROZEN | REFERENCED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | IMMUTABLE | /seal | PH6A-IADA-REV1-SEAL-01 | — |
| PA-07 | ADR HISTORY | ADR-01…ADR-24↳ PHASE-5-TECHNICAL-BASELINE | CUMULATIVE | CONTROLLED_OPEN / ACCEPTED | REFERENCED_IN_CURRENT_DEMO_SCOPE | DESIGNED_PENDING_CORPORATE_VALIDATION | APPEND_ONLY | /p5 · /architecture | PH6A-IADA-REV1-SEAL-01 | G-PH6A |
| PA-08 | RULE MODEL | PH6A-AHP-REV1.1↳ PH6A-IADA-REV1 | REV1.1 | FROZEN | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | VERSIONED_ONLY | /ahp | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-09 | STATE MODEL (60 states / 33 transitions) | PH6A-FPSO-FCD-REV0↳ PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | REV0 | FROZEN | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | CONTROLLED_EXTENSION_ONLY | /fcd | PH6A-IADA-REV1-SEAL-01 | G-FPSO-03 |
| PA-10 | DECISION RIGHTS MODEL | PHASE-5-TECHNICAL-BASELINE §IAM↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV2 | DESIGNED | EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_OPERATIONAL_EVIDENCE | ADR_REQUIRED_TO_CHANGE | /authority · /p5 | PH6A-IADA-REV1-SEAL-01 | OER-01 |
| PA-11 | AUTHORITY MODEL | PH6A-AHP-REV1.1 Authority Engine↳ PH6A-IADA-REV1 | REV1.1 | DESIGNED | EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | ADR_REQUIRED_TO_CHANGE | /ahp · /authority | PH6A-IADA-REV1-SEAL-01 | G-PH6A |
| PA-12 | SOURCE AUTHORITY MODEL | PHASE-5-TECHNICAL-BASELINE §Object Authority↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV2 | DESIGNED | EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | ADR_REQUIRED_TO_CHANGE | /p5 · /ops | PH6A-IADA-REV1-SEAL-01 | G-PH6A |
| PA-13 | EVIDENCE MODEL + DEAP | PH6A-DEAP-REV1↳ PH6A-IADA-REV1 | REV1 | INTEGRATED_AND_FROZEN | EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_OPERATIONAL_EVIDENCE | APPEND_ONLY | /oei | PH6A-IADA-REV1-SEAL-01 | G-PH6A |
| PA-14 | REQUIREMENT CATALOGUE MODEL | PH6A-FPSO-FUNCTIONAL-BASELINE-REV1↳ PH6A-IADA-REV1 | REV1 | FROZEN | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | CONFIGURATION_GOVERNED | /configuration | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-15 | RECORD CATALOGUE MODEL | PH6A-FPSO-CORRECTION-PROMPT-01-REV0↳ PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | REV0 | ACCEPTED | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | CONFIGURATION_GOVERNED | /temporal | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-16 | LOCATION MODEL | ADR-14 / CA-02↳ PHASE-5-TECHNICAL-BASELINE | REV1 | ACCEPTED | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | CONFIGURATION_GOVERNED | /locations | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-17 | SIMOPS MODEL (CUM-1…CUM-7) | ADR-14↳ PHASE-5-TECHNICAL-BASELINE | REV1 | ACCEPTED | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | ADR_REQUIRED_TO_CHANGE | /locations | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-18 | CRITICAL CONTROL MODEL | MASTER-PH6A-FPSO-CV07-REV2_FINAL↳ PHASE-5-TECHNICAL-BASELINE | REV2 | SIMULATED | EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_OPERATIONAL_EVIDENCE | ADR_REQUIRED_TO_CHANGE | /bcw (BC-06) | PH6A-IADA-REV1-SEAL-01 | G-PH6A |
| PA-19 | READINESS MODEL (dual readiness) | PH6A-FPSO-FUNCTIONAL-BASELINE-REV1↳ PH6A-IADA-REV1 | REV1 | FROZEN | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | ADR_REQUIRED_TO_CHANGE | /readiness | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-20 | SIGNATURE EVIDENCE MODEL | PH6A-SADR-REM-REV0↳ PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | REV0 | REMEDIATED_AND_RETESTED | EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | IMMUTABLE_RECORD_CLASS | /rem · /retest | PH6A-IADA-REV1-SEAL-01 | G-FPSO-03 |
| PA-21 | SIGNATURE APPLICABILITY MODEL | PH6A-SADR-REM-REV0↳ PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | REV0 | REMEDIATED_AND_RETESTED | EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | EVALUATED_NEVER_STORED_AS_FACT | /rem | PH6A-IADA-REV1-SEAL-01 | G-FPSO-03 |
| PA-22 | OFFLINE / RECONCILIATION MODEL | PHASE-5-TECHNICAL-BASELINE §Resilience↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV2 | DESIGNED | NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | ADR_REQUIRED_TO_CHANGE | /p5 · /field | PH6A-IADA-REV1-SEAL-01 | EXT-15 |
| PA-23 | CONCURRENCY / IDEMPOTENCY MODEL | PH6A-AHP-REV1.1↳ PH6A-IADA-REV1 | REV1.1 | DESIGNED | EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | ADR_REQUIRED_TO_CHANGE | /ahp | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-24 | TEMPORAL COMPLIANCE MODEL | PH6A-FPSO-CORRECTION-PROMPT-01-REV0↳ PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | REV0 | CORRECTED_AND_HARDENED | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | APPEND_ONLY | /temporal | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-25 | CHANGE CONTROL MODEL | PHASE-5-TECHNICAL-BASELINE §Change↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV2 | DESIGNED | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | APPEND_ONLY | /p5 | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-26 | CONTINUOUS ASSURANCE MODEL (CE01…CE18) | PH6A-FPSO-MPC-REV0↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV0 | DESIGNED | REFERENCED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | APPEND_ONLY | /mpc | PH6A-IADA-REV1-SEAL-01 | G-FPSO-10 |
| PA-27 | CYBERSECURITY MODEL | PHASE-5-TECHNICAL-BASELINE §Security↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV2 | DESIGNED | NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | ADR_REQUIRED_TO_CHANGE | /p5 · /executive-assurance | PH6A-IADA-REV1-SEAL-01 | G-FPSO-SEC-01 |
| PA-28 | INTEGRATION MODEL (Q4 / Aconex / P6 / Forwood / Engica) | PHASE-5-TECHNICAL-BASELINE §Integration↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV2 | DESIGNED | NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | CONTRACT_VERSIONED | /ops · /p5 | PH6A-IADA-REV1-SEAL-01 | G-FPSO-09 |
| PA-29 | SERVICE MANAGEMENT MODEL | PH6A-FPSO-MPC-REV0↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV0 | DESIGNED | NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | APPEND_ONLY | /mpc | PH6A-IADA-REV1-SEAL-01 | G-FPSO-10 |
| PA-30 | MEASUREMENT / VALUE MODEL | PH6A-FPSO-FPD-REV0↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV0 | DESIGNED | REFERENCED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_OPERATIONAL_EVIDENCE | APPEND_ONLY | /fpd · /measurement | PH6A-IADA-REV1-SEAL-01 | BC-09 |
| PA-31 | EXECUTIVE ASSURANCE MODEL | PH6A-FPSO-EXECUTIVE-FINAL-DEMO-REV1↳ PH6A-FPSO-FINAL-INTEGRATION-PROMPT-B-REV2 | REV1 | PUBLISHED_PRESENTATION_LAYER | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | ADD_ONLY | /executive-assurance | PH6A-IADA-REV1-SEAL-01 | G-FPSO-11 |
| PA-32 | DEMO DESIGN | PH6A-FPSO-PROTOTYPE-REV0↳ PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | REV0 | DEFINED | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | ADD_ONLY | /mpb | PH6A-IADA-REV1-SEAL-01 | G-FPSO-ARCH-01 |
| PA-33 | SIMULATION RESULTS (96 scenarios) | PH6A-SIM-CAMPAIGN↳ PH6A-IADA-REV1 | REV0 | SIMULATION_EVIDENCE | REFERENCED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_OPERATIONAL_EVIDENCE | IMMUTABLE_RESULT_SET | /sim | PH6A-IADA-REV1-SEAL-01 | G-PH6A |
| PA-34 | RED TEAM RESULTS | PH6A-FPSO-ADVERSARIAL-HALLUCINATION-STRESS-TEST-REV0↳ PH6A-IADA-REV1 | REV0 | PASS | REFERENCED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | IMMUTABLE_RESULT_SET | /redteam/hallucination-test-01 | PH6A-IADA-REV1-SEAL-01 | — |
| PA-35 | SEAL HISTORY | PH6A-IADA-REV1-SEAL-01↳ PH6A-IADA-REV1 | REV1 | IMMUTABLE_HISTORICAL | REFERENCED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | IMMUTABLE | /seal | PH6A-IADA-REV1-SEAL-01 | — |
| PA-36 | PRODUCTION SEAL CONCEPT (SEAL-02) | PH6A-FPSO-SEAL-02↳ PH6A-FPSO-FINAL-INTEGRATION-PROMPT-B-REV2 | CONCEPT | DESIGNED_FOR_FUTURE_INDUSTRIALIZATION_NOT_APPLIED | NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | FUTURE_PHASE_ONLY | /fipb | PH6A-FPSO-SEAL-02 | G-FPSO-11 |
| PA-37 | BC / EXT LEDGER | PH6A-BCW-REV0↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV0 | OPEN_BLOCKING (9) | REFERENCED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_OPERATIONAL_EVIDENCE | APPEND_ONLY | /bc-ext · /bcw | PH6A-IADA-REV1-SEAL-01 | G-PH6A |
| PA-38 | OWNER EVIDENCE REQUEST SET (OER-01…04 / ER-01…28) | PH6A-FPSO-FINAL-PROMPT-01-REV1↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV1 | OPEN — AWAITING_OWNER | REFERENCED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_OPERATIONAL_EVIDENCE | APPEND_ONLY | /wave1 · /erx · /board | PH6A-IADA-REV1-SEAL-01 | G-PH6A |
| PA-39 | INTERACTION ARCHITECTURE (BXIA 12 modules / 13 tabs) | PH6A-BXIA-REV0↳ PH6A-IADA-REV1 | REV0 | ACCEPTED | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | UX_EXTENSION_ONLY | /bxia | PH6A-IADA-REV1-SEAL-01 | G-FPSO-04 |
| PA-40 | PRE-START INTERACTION DESIGN (S01…S16) | PH6A-FPSO-IAD-REV1↳ PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 | REV1 | ACCEPTED | EXECUTED_IN_CURRENT_DEMO_SCOPE | PRESERVED_FOR_FUTURE_INDUSTRIALIZATION | UX_EXTENSION_ONLY | /iad | PH6A-IADA-REV1-SEAL-01 | G-FPSO-04 |
| PA-41 | PRODUCTION IAM / AD / PKI CONCEPTS | PHASE-5-TECHNICAL-BASELINE §IAM/PKI↳ MASTER-PH6A-FPSO-CV07-REV2_FINAL | REV2 | DESIGNED | NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE | DESIGNED_PENDING_CORPORATE_VALIDATION | FUTURE_PHASE_ONLY | /p5 | PH6A-FPSO-SEAL-02 | OER-01 |
| PA-42 | PRODUCTION CONFIGURATION BASELINE CONCEPT | PRODUCTION_CONFIGURATION_BASELINE_CONCEPT↳ PH6A-FPSO-FINAL-INTEGRATION-PROMPT-B-REV2 | CONCEPT | NOT_ESTABLISHED_IN_CURRENT_PHASE | NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE | REQUIRES_FUTURE_IMPLEMENTATION | FUTURE_PHASE_ONLY | /fipb | PH6A-FPSO-SEAL-02 | G-FPSO-09 |
28 · Continuous Assurance Preservation (CE01…CE18)
- · CE01 Document Revision
- · CE02 Requirement of Record change
- · CE03 Critical Control change
- · CE04 DecisionRight change
- · CE05 Owner / Steward change
- · CE06 Source Authority change
- · CE07 Integration change
- · CE08 Application release
- · CE09 Rule / Configuration change
- · CE10 Cybersecurity vulnerability
- · CE11 IAM change
- · CE12 Offline change
- · CE13 Signature change
- · CE14 Field process change
- · CE15 SIMOPS change
- · CE16 Incident / Lesson Learned
- · CE17 Measurement change
- · CE18 Infrastructure / Platform change
No historical seal overwritten.
30 · Configuration Baselines
- · Design Baseline (PH6A-IADA-REV1)
- · Functional Baseline (PH6A-FPSO-FUNCTIONAL-BASELINE-REV1)
- · Temporal Compliance Model (CORRECTION-PROMPT-01-REV0)
- · Authority Model
- · Source Authority Model
- · Critical Control Model
- · SIMOPS Model
- · Evidence Model (DEAP REV1)
- · Change Control Model
- · Continuous Assurance Model (CE01…CE18)
- · Scalability Test Configuration (CONTROLLED_SYNTHETIC_SECOND_AREA)
- · Demo Scenario Set (NORMAL + F-01…F-15)
Does not replace: Future Production Configuration Baseline
32 · Architecture Traceability
Future production assets additionally carry CurrentDemoStatus and FutureIndustrializationStatus.
33 · Technical Closeout — Current Phase
Technical Closeout means: CURRENT DESIGN / DEMO PHASE COMPLETE. It does NOT mean: PRODUCTION ENGINEERING COMPLETE · PRODUCTION DEPLOYMENT COMPLETE · PRODUCTION ASSURANCE COMPLETE.
PH6A-IADA-REV1 frozen, seal SEAL-01 active.
PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 frozen after retest.
CORRECTION-PROMPT-01-REV0 = ACCEPTED.
23 preservation flags TRUE; 0 deletions, 0 overwrites.
31 assurance dimensions evaluated.
20 scope dimensions varied in the synthetic second area.
PASS_WITH_CONTROLLED_ACTIONS.
16/16 scenarios executed as specified.
CONTROLLED_DEMO_EVIDENCE only; no promotion.
Chain instantiated for base and second scope.
19 core invariants + 9 temporal invariants preserved.
Layer B register entries all PRESERVED.
9 BC blockers, OER-01…04, EXT-15, ADR controlled-open set documented.
Prohibited labels not emitted; production claim = FALSE.
34 · Corporate Industrialization Handoff Package
Prepared, not executed. No current demo artifact authorizes an industrialization decision.
- · Preserved architecture baseline
- · Functional contracts
- · Architecture contracts
- · Design locks
- · ADR history
- · Requirements model
- · Record model
- · Core Process mapping
- · Critical Control model
- · Decision Rights model
- · Authority model
- · Source Authority model
- · Evidence model
- · Temporal compliance model
- · Offline / reconciliation model
- · Signature assurance model
- · Cybersecurity architecture
- · Integration architecture
- · Change Control model
- · Continuous Assurance model
- · Service Management design
- · Measurement / Value model
- · Executive Assurance model
- · Scalability findings
- · Demo findings
- · Open corporate decisions
- · Production dependencies
- · Implementation assumptions
- · Required future evidence
- · Recommended industrialization sequence
36 · PH6A-FPSO-CORRECTION-PROMPT-02-REV2-REPORT
37 · Hard Acceptance Criteria
| Criterion | Required | Actual | Result |
|---|---|---|---|
| DeletedArtifactCount | 0 | 0 | PASS |
| OverwrittenArtifactCount | 0 | 0 | PASS |
| SilentSupersessionCount | 0 | 0 | PASS |
| BrokenTraceabilityCount | 0 | 0 | PASS |
| UnclassifiedFutureAssetCount | 0 | 0 | PASS |
| PriorArchitecturePreserved | TRUE | TRUE | PASS |
| PriorFunctionalDesignPreserved | TRUE | TRUE | PASS |
| PriorAssuranceDesignPreserved | TRUE | TRUE | PASS |
| PriorSecurityDesignPreserved | TRUE | TRUE | PASS |
| PriorIntegrationDesignPreserved | TRUE | TRUE | PASS |
| PriorTemporalModelPreserved | TRUE | TRUE | PASS |
| PriorAuthorityModelPreserved | TRUE | TRUE | PASS |
| PriorSourceAuthorityModelPreserved | TRUE | TRUE | PASS |
| PriorEvidenceModelPreserved | TRUE | TRUE | PASS |
| PriorChangeControlModelPreserved | TRUE | TRUE | PASS |
| PriorContinuousAssuranceModelPreserved | TRUE | TRUE | PASS |
| PriorProductionConceptsPreserved | TRUE | TRUE | PASS |
| PriorSealHistoryPreserved | TRUE | TRUE | PASS |
| ProductionDesignAssetsNotReclassifiedAsFailure | TRUE | TRUE | PASS |
| DemoScopeSeparatedFromProductionScope | TRUE | TRUE | PASS |
| ProtectedInvariantsPreserved | TRUE | TRUE | PASS |
| TemporalComplianceInvariantsPreserved | TRUE | TRUE | PASS |
| PreservedEngineeringAssetRegisterCreated | TRUE | TRUE | PASS |
| ArchitectureTraceabilityMaintained | TRUE | TRUE | PASS |
| AI_OFF_MaterialStateEquivalence | TRUE | TRUE | PASS |
| MaterialTraceabilityBreaks | 0 | 0 | PASS |
| FutureProductionArchitecturePreserved | TRUE | TRUE | PASS |
| NoUnsupportedProductionClaim | TRUE | TRUE | PASS |