Non-Destructive Architecture Preservation Overlay

PH6A-FPSO-CORRECTION-PROMPT-02-REV2 · MM WTP YANACOCHA / BECHTEL GLOBAL · EXECUTION CLASS = CONTROLLED_NON_DESTRUCTIVE_ASSURANCE_OVERLAY · REBASELINE MODE = PRESERVE_AND_EXTEND. This overlay adds assurance; it deletes, overwrites and supersedes nothing.

NO VALID ENGINEERING ASSET ALREADY DEVELOPED SHALL BE LOST.

Preserved assets
42
Deleted
0
Overwritten
0
Silent supersessions
0
Traceability breaks
0
G-FPSO-ARCH-01 PASS_WITH_CONTROLLED_ACTIONSACCEPTANCE PASSARCHITECTURE_REOPEN_REQUIRED FALSECORPORATE_INDUSTRIALIZATION FUTURE_DECISION

0 · Non-Destructive Mandate

Any attempt to delete or overwrite an accepted artifact → ExecutionDisposition = HOLD_PRESERVATION_VIOLATION.

This prompt SHALL NOT
deleteeraseresetsimplifycollapseinvalidaterewriteoverwriterenumbersilently supersededowngradediscardremove from traceability
This prompt SHALL
preserveclarifyclassifyscopeoverlayextendassess scalabilityprotect future industrializationimprove executive semanticsprepare controlled technical closeout

1 · Global Engineering Preservation Freeze

PRIOR_ARCHITECTURE_PRESERVEDTRUE
PRIOR_FUNCTIONAL_DESIGN_PRESERVEDTRUE
PRIOR_ASSURANCE_DESIGN_PRESERVEDTRUE
PRIOR_SECURITY_DESIGN_PRESERVEDTRUE
PRIOR_INTEGRATION_DESIGN_PRESERVEDTRUE
PRIOR_TEMPORAL_MODEL_PRESERVEDTRUE
PRIOR_AUTHORITY_MODEL_PRESERVEDTRUE
PRIOR_DECISION_RIGHTS_MODEL_PRESERVEDTRUE
PRIOR_SOURCE_AUTHORITY_MODEL_PRESERVEDTRUE
PRIOR_EVIDENCE_MODEL_PRESERVEDTRUE
PRIOR_CRITICAL_CONTROL_MODEL_PRESERVEDTRUE
PRIOR_SIMOPS_MODEL_PRESERVEDTRUE
PRIOR_OFFLINE_MODEL_PRESERVEDTRUE
PRIOR_SIGNATURE_MODEL_PRESERVEDTRUE
PRIOR_CHANGE_CONTROL_MODEL_PRESERVEDTRUE
PRIOR_CONTINUOUS_ASSURANCE_MODEL_PRESERVEDTRUE
PRIOR_VALUE_MODEL_PRESERVEDTRUE
PRIOR_EXECUTIVE_ASSURANCE_MODEL_PRESERVEDTRUE
PRIOR_PRODUCTION_CONCEPTS_PRESERVEDTRUE
PRIOR_SEAL_HISTORY_PRESERVEDTRUE
PRIOR_ADR_HISTORY_PRESERVEDTRUE
PRIOR_GATE_HISTORY_PRESERVEDTRUE
PRIOR_BC_EXT_HISTORY_PRESERVEDTRUE

3 · Non-Destructive Change Semantics

OUT_OF_CURRENT_SCOPE != INVALID · OUT_OF_CURRENT_SCOPE != DELETED · OUT_OF_CURRENT_SCOPE != FAILED · OUT_OF_CURRENT_SCOPE != NOT_DESIGNED · OUT_OF_CURRENT_SCOPE != NOT_REQUIRED_FOR_FUTURE · A capability may be DESIGNED_FOR_FUTURE_INDUSTRIALIZATION while NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE

Allowed actions
ADDCLARIFYEXTENDRECLASSIFY_SCOPEADD_ASSURANCE_LAYERADD_SCALABILITY_TESTADD_FUTURE_INDUSTRIALIZATION_MAPPINGDEPRECATE_FOR_CURRENT_DEMO_ONLYPRESERVE_FOR_FUTURE_INDUSTRIALIZATION
Prohibited actions
DELETEPURGEREMOVEREPLACE_ALLRESETREINITIALIZEOVERWRITESILENT_SUPERSESSION

4 · Two-Layer Program Architecture

Layer A executes now. Layer B is preserved for future industrialization — not failed, not deleted.

Layer A — Current Controlled Demonstration
  • · Conceptual Architecture
  • · Functional Architecture
  • · Assurance Architecture
  • · Controlled Owner-Informed Validation
  • · Controlled Simulation
  • · Temporal Compliance Verification
  • · Architecture Scalability Testing
  • · Executive Demonstration
  • · Executive Assurance Panel
  • · Technical Closeout
Layer B — Future Production IndustrializationPRESERVED_FOR_FUTURE_INDUSTRIALIZATION
  • · Production IAM
  • · Production Active Directory integration
  • · Production Decision Rights
  • · Production Authority Engine
  • · Production Evidence Engine
  • · Production Decision Engine
  • · Production PKI
  • · Production Source Authority
  • · Production Signature Assurance
  • · Production Offline / Edge capability
  • · Production reconciliation
  • · Production configuration governance
  • · Production rule governance
  • · Production Aconex integration
  • · Production Q4 integration
  • · Production Forwood integration
  • · Production Engica integration
  • · Production operational data
  • · Production electronic signatures
  • · Production cybersecurity hardening
  • · Production service management
  • · Production observability
  • · Production monitoring
  • · Production recovery
  • · Production configuration baseline
  • · Production seal
  • · Continuous operational assurance
  • · Production evidence acquisition
  • · Production value realization
  • · Enterprise reporting

6 · Temporal Compliance Baseline (imported without modification)

Imported from PH6A-FPSO-CORRECTION-PROMPT-01-REV0. These are now protected invariants.

NO_FUTURE_DATED_DOCUMENTSTRUE
NO_BACKDATINGTRUE
GOVERNING_DOCUMENTS_REQUIRE_CURRENT_APPLICABLE_REVISIONTRUE
DAILY_SHIFT_RECORDS_USE_ACTUAL_DATE_AND_SHIFTTRUE
FUTURE_OPERATIONAL_VALIDITY_DOES_NOT_CREATE_FUTURE_DOCUMENTTRUE
PETAR_VALIDITY_DEFERS_TO_APPLICABLE_REQUIREMENTTRUE
CORRECTIONS_ARE_APPEND_ONLYTRUE
UNKNOWN_TEMPORAL_STATE_PRODUCES_HOLDTRUE
AI_CANNOT_ALTER_TEMPORAL_COMPLIANCETRUE

8 · Core Architectural Invariants — Preserved and Enforced

  • · INHERIT_CONTEXT_NEVER_INHERIT_AUTHORIZATION
  • · NO_SILENT_READY
  • · NO_LAST_WRITE_WINS
  • · NO_FUTURE_DATED_DOCUMENTS
  • · NO_BACKDATING
  • · SignatureEvidence != SignatureApplicability
  • · SignatureApplicability != DecisionRight
  • · AuthenticatedIdentity != DecisionRight
  • · Permission != DecisionRight
  • · CandidateSource != AuthoritativeSource
  • · Retrieved != Applicable
  • · Applicable != Authorized
  • · AIAdvisoryOutput != AuthorizedDecision
  • · AI_ON_MaterialState = AI_OFF_MaterialState
  • · FunctionalReadiness != PreventiveESHReadiness
  • · No compensated readiness scoring
  • · UnknownMaterialAuthority -> HOLD
  • · UnknownMaterialSource -> HOLD / REASSESS
  • · TechnologyFailure != ControlBypass

10 · G-FPSO-ARCH-01 — ARCHITECTURE & SCALABILITY ASSURANCE

Demonstrate that the current architecture extends to another area, discipline, work package, location, Core Process, Critical Control set, activity context or project environment primarily through governed configuration and controlled extension, without breaking protected invariants.

ArchitectureAssuranceResult PASS_WITH_CONTROLLED_ACTIONSScalabilityAssuranceResult PASS_WITH_CONTROLLED_ACTIONS

11 · Architecture Assurance Dimensions

DimensionClassificationVerdictBasis
FunctionalBoundaryIntegrityCONFIGURATION_ONLYPASSSecond-area instantiation crosses no functional boundary; Core untouched.
ArchitectureContractIntegrityCONFIGURATION_ONLYPASSAHP REV1.1 contracts unchanged by scope variation.
FunctionalContractIntegrityCONFIGURATION_ONLYPASSFC-FPSO-01…08 accept new area/discipline as input data, not new states.
CoreProcessConfigurabilityCONFIGURATION_ONLYPASSCore Process mapping is catalogue-driven.
CriticalControlConfigurabilityCONTROLLED_EXTENSIONPASS_WITH_CONTROLLED_ACTIONSNew Critical Control set requires governed control-definition load and owner attestation (BC-06 path).
RequirementCatalogueScalabilityCONFIGURATION_ONLYPASSRequirements of Record are configuration rows with applicability predicates.
RecordCatalogueScalabilityCONFIGURATION_ONLYPASSClass B record types configured per activity/shift context.
LocationModelScalabilityCONFIGURATION_ONLYPASSLocation Operational Context Container is hierarchy-agnostic.
DecisionRightsScalabilityCONTROLLED_EXTENSIONPASS_WITH_CONTROLLED_ACTIONSNew area owners require governed DecisionRight assignment; unresolved authority fails closed to HOLD (OER-01).
AuthorityModelScalabilityCONFIGURATION_ONLYPASSAuthority Engine resolves by scope tuple, not by hard-coded area.
SourceAuthorityScalabilityCONTROLLED_EXTENSIONPASS_WITH_CONTROLLED_ACTIONSEach new object class needs a declared authoritative source; UNKNOWN → HOLD/REASSESS.
EvidenceModelScalabilityCONFIGURATION_ONLYPASSDEAP admission checks are class-based, not scope-based.
TemporalComplianceScalabilityCONFIGURATION_ONLYPASST01–T12 evaluated per document/record instance; invariants scope-independent.
DailyShiftRecordScalabilityCONFIGURATION_ONLYPASSActual date / shift / crew / location / activity match is generic.
ChangeControlScalabilityCONFIGURATION_ONLYPASSES&H Change Impact Classification applies to any scope.
ContinuousAssuranceScalabilityCONTROLLED_EXTENSIONPASS_WITH_CONTROLLED_ACTIONSCE01…CE18 subscriptions must be registered for the new source set.
SIMOPSScalabilityCONFIGURATION_ONLYPASSCUM-1…CUM-7 thresholds are governed configuration per location.
RiskModelScalabilityCONFIGURATION_ONLYPASSConsecuencia / Probabilidad matrix is scope-independent.
OfflineModelScalabilityCONTROLLED_EXTENSIONPASS_WITH_CONTROLLED_ACTIONSOffline authorization reconciliation remains EXT-15 dependent; NOT_EXECUTED_IN_CURRENT_DEMO_SCOPE.
SignatureModelScalabilityCONTROLLED_EXTENSIONPASS_WITH_CONTROLLED_ACTIONSSignatureEvidence generic; SignatureApplicability requires new-scope DecisionRight data.
IntegrationBoundaryScalabilityCONTROLLED_EXTENSIONPASS_WITH_CONTROLLED_ACTIONSAdapter contracts versioned; new source instances are configuration + contract registration.
CybersecurityBoundaryIntegrityCONFIGURATION_ONLYPASSTrust boundaries unchanged by scope addition; production hardening remains Layer B.
ConfigurationIsolationCONFIGURATION_ONLYPASSSecond area configured without mutating base-area configuration.
DataSegregationCONFIGURATION_ONLYPASSScope tuple segregates records, evidence and decisions.
PerformanceAssumptionsCONTROLLED_EXTENSIONPASS_WITH_CONTROLLED_ACTIONSAggregate SIMOPS evaluation grows pairwise; documented assumption for industrialization sizing.
AuditabilityCONFIGURATION_ONLYPASSAppend-only ledger unaffected by scope count.
TraceabilityIntegrityCONFIGURATION_ONLYPASSRequirement→…→ValueMechanism chain instantiated for the second scope.
AI_OFF_MaterialStateEquivalenceCONFIGURATION_ONLYPASSMaterial state identical with AI advisory disabled in both scopes.
NoFutureDatedDocumentInvariantCONFIGURATION_ONLYPASSEnforced in the second scope; future-dated PETAR rejected.
NoSilentReadyInvariantCONFIGURATION_ONLYPASSUnresolved second-scope authority produced HOLD, never READY.
NoLastWriteWinsInvariantCONFIGURATION_ONLYPASSBaseVersion conflict detected in second scope.

12 · Controlled Scalability Test

BASE_DEMO_SCOPE = AWTP_WEST · SCALABILITY_TEST_SCOPE = CONTROLLED_SYNTHETIC_SECOND_AREA. Purpose: determine whether the architecture instantiates a new scope without redesigning the Core.

Configuration only
16
Controlled extension
4
Functional change
0
Architecture change
0
DimensionBase scopeSecond scopeClassificationDisposition
AreaAWTP West — Water TreatmentTSF Lift 7 — Tailings Storage (synthetic)CONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
Location hierarchyArea > Facility > System > SubsystemArea > Embankment Sector > Cell > BenchCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
DisciplineMechanical / Electrical / InstrumentationCivil / Earthworks / GeotechnicalCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
ActivityPump alignment & loop checkBulk fill placement & compaction controlCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
CrewCrew MEC-A (8)Crew CIV-D (14)CONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
ShiftDay ANight BCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
Work Package / IWPIWP-AWTP-0142IWP-TSF-0771CONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
Critical ControlsEnergy isolation · Lifting · Confined spaceMobile equipment interaction · Ground/slope stability · Traffic managementCONTROLLED_EXTENSIONSCALABLE_WITH_CONTROLLED_EXTENSION
Requirements of RecordElectrical & mechanical requirement setGeotechnical & haulage requirement setCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
Governing ProceduresPETS-MEC-014 Rev.4PETS-CIV-032 Rev.2 (synthetic)CONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
Daily / Shift RecordsIPERC Continuo · ATS · Tool checklistIPERC Continuo · ATS · Equipment pre-use · OAT · Traffic plan checkCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
Source AuthoritiesQ4 · Aconex · P6 · ForwoodQ4 · Aconex · P6 · Forwood · Geotech monitoring source (UNDECLARED)CONTROLLED_EXTENSIONSCALABLE_WITH_CONTROLLED_EXTENSION
Owner RolesArea Superintendent AWTPEarthworks Superintendent TSFCONTROLLED_EXTENSIONSCALABLE_WITH_CONTROLLED_EXTENSION
Decision RightsROL-SUPT scope AWTPROL-SUPT scope TSF (unassigned at test time)CONTROLLED_EXTENSIONSCALABLE_WITH_CONTROLLED_EXTENSION
SIMOPS context3 concurrent job cards5 concurrent job cards incl. mobile plantCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
Risk contextConsecuencia 4 / Probabilidad 3Consecuencia 5 / Probabilidad 3CONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
ToolsTorque tooling, calibrated instrumentsCompaction testing equipment, survey instrumentsCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
EquipmentOverhead crane, MEWPHaul trucks, dozers, compactorsCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
Permit applicabilityEnergy isolation permit, confined spaceGround disturbance permit, traffic management permitCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION
Document applicabilityDiscipline-based applicability predicateSame predicate, different catalogue rowsCONFIGURATION_ONLYSCALABLE_BY_CONFIGURATION

14 · Bechtelized ES&H Change Impact Classification

Clase 1 No Material · Clase 2 Cambio de configuración ES&H controlado · Clase 3 Cambio material de control ES&H · Clase 4 Cambio de línea base gobernante ES&H. Se usa la MATRIZ DE CONSECUENCIAS Y PROBABILIDADES (NivelConsecuencia / NivelProbabilidad / ClasificaciónDelRiesgoES&H). Sin puntuación compensada.

IDChangeProposedFinal classRiesgo ES&HAssurance responseOverrides / reassessment
ECC-01Add second area location hierarchy rows (TSF Lift 7)CLASS_1_NON_MATERIAL_CHANGECLASS_1_NON_MATERIAL_CHANGEBAJODOCUMENT_CONFIGURATION_CONTROL_ONLY
ECC-02Register Class B record types for earthworks shift recordsCLASS_2_CONTROLLED_ESH_CONFIGURATION_CHANGECLASS_2_CONTROLLED_ESH_CONFIGURATION_CHANGEMEDIOSCOPED_ESH_REVALIDATION
ECC-03Load new Critical Control set (mobile equipment interaction, ground stability)CLASS_2_CONTROLLED_ESH_CONFIGURATION_CHANGECLASS_3_MATERIAL_ESH_CONTROL_CHANGECRITICOTARGETED_ESH_CONTROL_REVALIDATION + GATE_RECHECK_AS_APPLICABLECriticalControlImpact = TRUE → MinimumChangeClass = MATERIAL_ESH_CONTROL_CHANGE
ECC-04Assign DecisionRights for TSF Earthworks Superintendent scopeCLASS_1_NON_MATERIAL_CHANGECLASS_2_CONTROLLED_ESH_CONFIGURATION_CHANGEALTOSCOPED_ESH_REVALIDATIONDecisionRight / WorkAuthorization / RequirementOfRecord impact → ChangeClass cannot equal NON_MATERIAL_CHANGE · MaterialityReassessmentRequired = TRUE
ECC-05Adopt revised governing PETS baseline for earthworks disciplineCLASS_4_ESH_GOVERNING_BASELINE_CHANGECLASS_4_ESH_GOVERNING_BASELINE_CHANGEALTOBASELINE_REASSESSMENT
Assurance response mapping
CLASS_1_NON_MATERIAL_CHANGE → DOCUMENT_CONFIGURATION_CONTROL_ONLY · CLASS_2_CONTROLLED_ESH_CONFIGURATION_CHANGE → SCOPED_ESH_REVALIDATION · CLASS_3_MATERIAL_ESH_CONTROL_CHANGE → TARGETED_ESH_CONTROL_REVALIDATION + GATE_RECHECK_AS_APPLICABLE · CLASS_4_ESH_GOVERNING_BASELINE_CHANGE → BASELINE_REASSESSMENT

18 · Architecture Change Control

Evaluated for every proposed modification. Reopen only where a true material structural contradiction exists.

  • · AffectedArchitectureContract
  • · AffectedFunctionalContract
  • · AffectedInvariant
  • · AffectedRequirement
  • · AffectedCriticalControl
  • · AffectedDecisionRight
  • · AffectedSourceAuthority
  • · AffectedEvidenceObject
  • · AffectedGate
  • · AffectedSeal
ArchitectureReopenRequiredFALSE

19 · Demo Evidence Model & Environment Semantics

DESIGN_EVIDENCEAVAILABLE_IN_CURRENT_PHASE
SIMULATION_EVIDENCEAVAILABLE_IN_CURRENT_PHASE
OWNER_VALIDATION_EVIDENCEOWNER_INFORMED_ASSUMPTIONS_ONLY
CONTROLLED_DEMO_EVIDENCEAVAILABLE_IN_CURRENT_PHASE
DEMO_ASSURANCE_EVIDENCEAVAILABLE_IN_CURRENT_PHASE
OPERATIONAL_CLOSURE_EVIDENCENOT_REQUIRED_FOR_CURRENT_DEMO_CLOSEOUT
PRODUCTION_EVIDENCENOT_REQUIRED_FOR_CURRENT_DEMO_CLOSEOUT
PRODUCTION_ASSURANCE_EVIDENCENOT_REQUIRED_FOR_CURRENT_DEMO_CLOSEOUT
EnvironmentCONTROLLED_DEMONSTRATION
OperationalRealityClaimFALSE
ProductionClaimFALSE
EvidenceClassCONTROLLED_DEMO_EVIDENCE
OwnerValidationReferenceEXPLICIT
DemoEvidencePromotedToProductionEvidenceFALSE

21 · Controlled Demo Scenarios

F-15 injects a synthetic architectural contradiction to verify the reopen path fires. No true contradiction exists in the preserved baseline; ArchitectureReopenRequired = FALSE for the real baseline.

Executed
16
Pass
16
Fail
0
IDScenarioExpectedActualResult
NORMALCurrent governing procedure + valid records + DecisionRights + Critical Controls verified + double readinessAUTHORIZED_AND_EXECUTEDAUTHORIZED_AND_EXECUTEDPASS
F-01Superseded governing procedureHOLDHOLDPASS
F-02Future-dated IPERC / PETARREJECTEDREJECTEDPASS
F-03Current-date PETAR with later valid operational windowVALID_WITH_CONTROLLED_OPERATIONAL_WINDOWVALID_WITH_CONTROLLED_OPERATIONAL_WINDOWPASS
F-04Backdated recordREJECTEDREJECTEDPASS
F-05Critical Control invalidHOLD_STOPHOLD_STOPPASS
F-06DecisionRight revokedHOLDHOLDPASS
F-07Aggregate SIMOPS conflict (CUM rule)HOLD_STOPHOLD_STOPPASS
F-08Tool calibration / inspection expiredREASSESS_HOLDREASSESS_HOLDPASS
F-09Signature cryptographically valid but authority invalidNO_AUTHORIZATIONNO_AUTHORIZATIONPASS
F-10Offline stale authorityHOLDHOLDPASS
F-11Concurrent version conflict (BaseVersion mismatch)CONFLICT_REASSESSCONFLICT_REASSESSPASS
F-12Unknown source authorityHOLD_REASSESSHOLD_REASSESSPASS
F-13Second area configured successfullySCALABILITY_PASSSCALABILITY_PASSPASS
F-14Change requires functional extensionFUNCTIONAL_REASSESSMENT_REQUIREDFUNCTIONAL_REASSESSMENT_REQUIREDPASS
F-15True architecture contradiction (synthetic negative probe — none found)ARCHITECTURE_REOPEN_REQUIREDARCHITECTURE_REOPEN_REQUIREDPASS

22 · Future Production Gates & Seal Preservation

FUTURE_PHASE_NOT_EXECUTED is not FAILED, DELETED, NOT_APPLICABLE or INVALID.

G-FPSO-09 — Operational configuration establishmentFUTURE_PHASE_NOT_EXECUTED
G-FPSO-SEC-01 — Production cybersecurity assuranceFUTURE_PHASE_NOT_EXECUTED
G-FPSO-10 — Production service managementFUTURE_PHASE_NOT_EXECUTED
G-FPSO-11 — Production publication authorization / integrated configuration sealingFUTURE_PHASE_NOT_EXECUTED
G-PH6A — Pre-execution readiness closure (operational evidence)HOLD — 9 blocking conditions open
PH6A-IADA-REV1-SEAL-01IMMUTABLE_HISTORICAL
PH6A-FPSO-SEAL-02DESIGNED_FOR_FUTURE_INDUSTRIALIZATION_NOT_APPLIED

24 · Executive Assurance Panel — Dual Layer

Section A = current controlled demo assurance. Section B = future industrialization readiness. Future-state labels are never displayed as failures.

Section A — Current Controlled Demo Assurance
DESIGN BASELINEFROZEN

PH6A-IADA-REV1 preserved and referenced; no overwrite.

FUNCTIONAL BASELINEFROZEN

PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 after SADR remediation and independent retest.

TEMPORAL COMPLIANCEPASS

CORRECTION-PROMPT-01 accepted; T01–T12 imported unchanged as protected invariants.

DEMONSTRATION CONFIGURATIONESTABLISHED

DEMONSTRATION_CONFIGURATION_BASELINE references design, functional, temporal, authority, source, control, SIMOPS, evidence, change and assurance models.

ARCHITECTURE ASSURANCEPASS_WITH_CONTROLLED_ACTIONS

31 dimensions evaluated; 0 architecture change required; 8 controlled extensions.

SCALABILITY ASSURANCEPASS_WITH_CONTROLLED_ACTIONS

Second synthetic area instantiated: 16 configuration-only, 4 controlled extension, 0 functional change, 0 architecture change.

DECISION RIGHTS MODELCONDITIONAL

Model scalable; operational assignment for new scope remains owner-dependent (OER-01).

SOURCE AUTHORITY MODELCONDITIONAL

Undeclared second-scope source correctly produced HOLD/REASSESS.

CRITICAL CONTROL MODELCONDITIONAL

Demonstrated under simulation; real control verification remains BC-06 / OER-02.

SIMOPSPASS

Aggregate CUM evaluation exercised in both scopes; pairwise PASS never implies location PASS.

CONTROLLED DEMOPASS

16/16 scenarios behaved as specified under CONTROLLED_DEMONSTRATION semantics.

DEMO ASSURANCEPASS_WITH_CONTROLLED_ACTIONS

Demo evidence class only; no promotion to operational or production evidence.

TECHNICAL CLOSEOUTREADY_FOR_CURRENT_PHASE_CLOSEOUT

All 14 §33 closeout conditions satisfied for the current design/demo phase only.

Section B — Future Industrialization Readiness
PRODUCTION ARCHITECTURE DESIGNPRESERVED_FOR_FUTURE_INDUSTRIALIZATION

Option C federated architecture retained in full.

PRODUCTION IAM DESIGNDESIGNED_PENDING_CORPORATE_VALIDATION

AD / IAM integration designed; corporate validation is a future decision.

PRODUCTION DECISION RIGHTS DESIGNDESIGNED_PENDING_CORPORATE_VALIDATION

DecisionRight registry design preserved; owner attestation pending.

PRODUCTION SOURCE AUTHORITY DESIGNPRESERVED_FOR_FUTURE_INDUSTRIALIZATION

Object authority matrix preserved from Phase 5.

PRODUCTION INTEGRATION DESIGNREQUIRES_FUTURE_IMPLEMENTATION

Q4 / Aconex / P6 / Forwood / Engica adapter contracts defined, not implemented.

PRODUCTION OFFLINE DESIGNREQUIRES_FUTURE_IMPLEMENTATION

Offline authorization reconciliation remains EXT-15.

PRODUCTION SIGNATURE ASSURANCE DESIGNREQUIRES_FUTURE_IMPLEMENTATION

PKI-backed signature evidence design preserved.

PRODUCTION CYBERSECURITY DESIGNPRESERVED_FOR_FUTURE_INDUSTRIALIZATION

Trust boundary and hardening concepts preserved; G-FPSO-SEC-01 not executed.

PRODUCTION EVIDENCE MODELREQUIRES_FUTURE_OPERATIONAL_EVIDENCE

OPERATIONAL_CLOSURE_EVIDENCE class preserved and empty by design.

PRODUCTION SERVICE MANAGEMENT MODELDESIGNED_PENDING_CORPORATE_VALIDATION

Service model from Macro C preserved.

PRODUCTION CONTINUOUS ASSURANCE MODELPRESERVED_FOR_FUTURE_INDUSTRIALIZATION

CE01…CE18 change-event model preserved intact.

PRODUCTION CONFIGURATION BASELINENOT_EXECUTED_IN_CURRENT_PHASE

PRODUCTION_CONFIGURATION_BASELINE = NOT_ESTABLISHED_IN_CURRENT_PHASE.

PRODUCTION SEALNOT_EXECUTED_IN_CURRENT_PHASE

SEAL-02 designed, not applied. SEAL-01 immutable historical.

26 · Preserved Engineering Asset Register

PreservationStatus = PRESERVED for every material artifact. Nothing removed from traceability.

IDArtifact typeBaseline / parentVer.Current statusCurrent demo useFuture industrialization useChange restrictionTraceSealGate
PA-01DESIGN BASELINEPH6A-IADA-REV1MASTER-PH6A-FPSO-CV07-REV2_FINALREV1FROZENREFERENCED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONADD_OR_CLARIFY_ONLY/iadaPH6A-IADA-REV1-SEAL-01G-FPSO-03
PA-02FUNCTIONAL BASELINEPH6A-FPSO-FUNCTIONAL-BASELINE-REV1PH6A-IADA-REV1REV1FROZENEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONCONTROLLED_EXTENSION_ONLY/retestPH6A-IADA-REV1-SEAL-01G-FPSO-03
PA-03ASSURANCE BASELINEPH6A-II-SADR-REV0 + REM + RETESTPH6A-IADA-REV1REV1ACCEPTEDEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONAPPEND_ONLY/sadr · /rem · /retestPH6A-IADA-REV1-SEAL-01G-FPSO-03
PA-04ARCHITECTURE CONTRACTSPH6A-AHP-REV1.1PH6A-IADA-REV1REV1.1FROZENREFERENCED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONADR_REQUIRED_TO_CHANGE/ahpPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-05FUNCTIONAL CONTRACTS (FC-FPSO-01…08)PH6A-FPSO-FCD-REV0PH6A-FPSO-FUNCTIONAL-BASELINE-REV1REV0FROZENEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONCONTROLLED_EXTENSION_ONLY/fcdPH6A-IADA-REV1-SEAL-01G-FPSO-03
PA-06DESIGN LOCKSPH6A-IADA-REV1-SEAL-01PH6A-IADA-REV1REV1ACTIVE_AND_FROZENREFERENCED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONIMMUTABLE/sealPH6A-IADA-REV1-SEAL-01
PA-07ADR HISTORYADR-01…ADR-24PHASE-5-TECHNICAL-BASELINECUMULATIVECONTROLLED_OPEN / ACCEPTEDREFERENCED_IN_CURRENT_DEMO_SCOPEDESIGNED_PENDING_CORPORATE_VALIDATIONAPPEND_ONLY/p5 · /architecturePH6A-IADA-REV1-SEAL-01G-PH6A
PA-08RULE MODELPH6A-AHP-REV1.1PH6A-IADA-REV1REV1.1FROZENEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONVERSIONED_ONLY/ahpPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-09STATE MODEL (60 states / 33 transitions)PH6A-FPSO-FCD-REV0PH6A-FPSO-FUNCTIONAL-BASELINE-REV1REV0FROZENEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONCONTROLLED_EXTENSION_ONLY/fcdPH6A-IADA-REV1-SEAL-01G-FPSO-03
PA-10DECISION RIGHTS MODELPHASE-5-TECHNICAL-BASELINE §IAMMASTER-PH6A-FPSO-CV07-REV2_FINALREV2DESIGNEDEXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_OPERATIONAL_EVIDENCEADR_REQUIRED_TO_CHANGE/authority · /p5PH6A-IADA-REV1-SEAL-01OER-01
PA-11AUTHORITY MODELPH6A-AHP-REV1.1 Authority EnginePH6A-IADA-REV1REV1.1DESIGNEDEXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONADR_REQUIRED_TO_CHANGE/ahp · /authorityPH6A-IADA-REV1-SEAL-01G-PH6A
PA-12SOURCE AUTHORITY MODELPHASE-5-TECHNICAL-BASELINE §Object AuthorityMASTER-PH6A-FPSO-CV07-REV2_FINALREV2DESIGNEDEXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONADR_REQUIRED_TO_CHANGE/p5 · /opsPH6A-IADA-REV1-SEAL-01G-PH6A
PA-13EVIDENCE MODEL + DEAPPH6A-DEAP-REV1PH6A-IADA-REV1REV1INTEGRATED_AND_FROZENEXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_OPERATIONAL_EVIDENCEAPPEND_ONLY/oeiPH6A-IADA-REV1-SEAL-01G-PH6A
PA-14REQUIREMENT CATALOGUE MODELPH6A-FPSO-FUNCTIONAL-BASELINE-REV1PH6A-IADA-REV1REV1FROZENEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONCONFIGURATION_GOVERNED/configurationPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-15RECORD CATALOGUE MODELPH6A-FPSO-CORRECTION-PROMPT-01-REV0PH6A-FPSO-FUNCTIONAL-BASELINE-REV1REV0ACCEPTEDEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONCONFIGURATION_GOVERNED/temporalPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-16LOCATION MODELADR-14 / CA-02PHASE-5-TECHNICAL-BASELINEREV1ACCEPTEDEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONCONFIGURATION_GOVERNED/locationsPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-17SIMOPS MODEL (CUM-1…CUM-7)ADR-14PHASE-5-TECHNICAL-BASELINEREV1ACCEPTEDEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONADR_REQUIRED_TO_CHANGE/locationsPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-18CRITICAL CONTROL MODELMASTER-PH6A-FPSO-CV07-REV2_FINALPHASE-5-TECHNICAL-BASELINEREV2SIMULATEDEXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_OPERATIONAL_EVIDENCEADR_REQUIRED_TO_CHANGE/bcw (BC-06)PH6A-IADA-REV1-SEAL-01G-PH6A
PA-19READINESS MODEL (dual readiness)PH6A-FPSO-FUNCTIONAL-BASELINE-REV1PH6A-IADA-REV1REV1FROZENEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONADR_REQUIRED_TO_CHANGE/readinessPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-20SIGNATURE EVIDENCE MODELPH6A-SADR-REM-REV0PH6A-FPSO-FUNCTIONAL-BASELINE-REV1REV0REMEDIATED_AND_RETESTEDEXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONIMMUTABLE_RECORD_CLASS/rem · /retestPH6A-IADA-REV1-SEAL-01G-FPSO-03
PA-21SIGNATURE APPLICABILITY MODELPH6A-SADR-REM-REV0PH6A-FPSO-FUNCTIONAL-BASELINE-REV1REV0REMEDIATED_AND_RETESTEDEXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONEVALUATED_NEVER_STORED_AS_FACT/remPH6A-IADA-REV1-SEAL-01G-FPSO-03
PA-22OFFLINE / RECONCILIATION MODELPHASE-5-TECHNICAL-BASELINE §ResilienceMASTER-PH6A-FPSO-CV07-REV2_FINALREV2DESIGNEDNOT_EXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONADR_REQUIRED_TO_CHANGE/p5 · /fieldPH6A-IADA-REV1-SEAL-01EXT-15
PA-23CONCURRENCY / IDEMPOTENCY MODELPH6A-AHP-REV1.1PH6A-IADA-REV1REV1.1DESIGNEDEXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONADR_REQUIRED_TO_CHANGE/ahpPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-24TEMPORAL COMPLIANCE MODELPH6A-FPSO-CORRECTION-PROMPT-01-REV0PH6A-FPSO-FUNCTIONAL-BASELINE-REV1REV0CORRECTED_AND_HARDENEDEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONAPPEND_ONLY/temporalPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-25CHANGE CONTROL MODELPHASE-5-TECHNICAL-BASELINE §ChangeMASTER-PH6A-FPSO-CV07-REV2_FINALREV2DESIGNEDEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONAPPEND_ONLY/p5PH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-26CONTINUOUS ASSURANCE MODEL (CE01…CE18)PH6A-FPSO-MPC-REV0MASTER-PH6A-FPSO-CV07-REV2_FINALREV0DESIGNEDREFERENCED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONAPPEND_ONLY/mpcPH6A-IADA-REV1-SEAL-01G-FPSO-10
PA-27CYBERSECURITY MODELPHASE-5-TECHNICAL-BASELINE §SecurityMASTER-PH6A-FPSO-CV07-REV2_FINALREV2DESIGNEDNOT_EXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONADR_REQUIRED_TO_CHANGE/p5 · /executive-assurancePH6A-IADA-REV1-SEAL-01G-FPSO-SEC-01
PA-28INTEGRATION MODEL (Q4 / Aconex / P6 / Forwood / Engica)PHASE-5-TECHNICAL-BASELINE §IntegrationMASTER-PH6A-FPSO-CV07-REV2_FINALREV2DESIGNEDNOT_EXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONCONTRACT_VERSIONED/ops · /p5PH6A-IADA-REV1-SEAL-01G-FPSO-09
PA-29SERVICE MANAGEMENT MODELPH6A-FPSO-MPC-REV0MASTER-PH6A-FPSO-CV07-REV2_FINALREV0DESIGNEDNOT_EXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONAPPEND_ONLY/mpcPH6A-IADA-REV1-SEAL-01G-FPSO-10
PA-30MEASUREMENT / VALUE MODELPH6A-FPSO-FPD-REV0MASTER-PH6A-FPSO-CV07-REV2_FINALREV0DESIGNEDREFERENCED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_OPERATIONAL_EVIDENCEAPPEND_ONLY/fpd · /measurementPH6A-IADA-REV1-SEAL-01BC-09
PA-31EXECUTIVE ASSURANCE MODELPH6A-FPSO-EXECUTIVE-FINAL-DEMO-REV1PH6A-FPSO-FINAL-INTEGRATION-PROMPT-B-REV2REV1PUBLISHED_PRESENTATION_LAYEREXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONADD_ONLY/executive-assurancePH6A-IADA-REV1-SEAL-01G-FPSO-11
PA-32DEMO DESIGNPH6A-FPSO-PROTOTYPE-REV0PH6A-FPSO-FUNCTIONAL-BASELINE-REV1REV0DEFINEDEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONADD_ONLY/mpbPH6A-IADA-REV1-SEAL-01G-FPSO-ARCH-01
PA-33SIMULATION RESULTS (96 scenarios)PH6A-SIM-CAMPAIGNPH6A-IADA-REV1REV0SIMULATION_EVIDENCEREFERENCED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_OPERATIONAL_EVIDENCEIMMUTABLE_RESULT_SET/simPH6A-IADA-REV1-SEAL-01G-PH6A
PA-34RED TEAM RESULTSPH6A-FPSO-ADVERSARIAL-HALLUCINATION-STRESS-TEST-REV0PH6A-IADA-REV1REV0PASSREFERENCED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONIMMUTABLE_RESULT_SET/redteam/hallucination-test-01PH6A-IADA-REV1-SEAL-01
PA-35SEAL HISTORYPH6A-IADA-REV1-SEAL-01PH6A-IADA-REV1REV1IMMUTABLE_HISTORICALREFERENCED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONIMMUTABLE/sealPH6A-IADA-REV1-SEAL-01
PA-36PRODUCTION SEAL CONCEPT (SEAL-02)PH6A-FPSO-SEAL-02PH6A-FPSO-FINAL-INTEGRATION-PROMPT-B-REV2CONCEPTDESIGNED_FOR_FUTURE_INDUSTRIALIZATION_NOT_APPLIEDNOT_EXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONFUTURE_PHASE_ONLY/fipbPH6A-FPSO-SEAL-02G-FPSO-11
PA-37BC / EXT LEDGERPH6A-BCW-REV0MASTER-PH6A-FPSO-CV07-REV2_FINALREV0OPEN_BLOCKING (9)REFERENCED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_OPERATIONAL_EVIDENCEAPPEND_ONLY/bc-ext · /bcwPH6A-IADA-REV1-SEAL-01G-PH6A
PA-38OWNER EVIDENCE REQUEST SET (OER-01…04 / ER-01…28)PH6A-FPSO-FINAL-PROMPT-01-REV1MASTER-PH6A-FPSO-CV07-REV2_FINALREV1OPEN — AWAITING_OWNERREFERENCED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_OPERATIONAL_EVIDENCEAPPEND_ONLY/wave1 · /erx · /boardPH6A-IADA-REV1-SEAL-01G-PH6A
PA-39INTERACTION ARCHITECTURE (BXIA 12 modules / 13 tabs)PH6A-BXIA-REV0PH6A-IADA-REV1REV0ACCEPTEDEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONUX_EXTENSION_ONLY/bxiaPH6A-IADA-REV1-SEAL-01G-FPSO-04
PA-40PRE-START INTERACTION DESIGN (S01…S16)PH6A-FPSO-IAD-REV1PH6A-FPSO-FUNCTIONAL-BASELINE-REV1REV1ACCEPTEDEXECUTED_IN_CURRENT_DEMO_SCOPEPRESERVED_FOR_FUTURE_INDUSTRIALIZATIONUX_EXTENSION_ONLY/iadPH6A-IADA-REV1-SEAL-01G-FPSO-04
PA-41PRODUCTION IAM / AD / PKI CONCEPTSPHASE-5-TECHNICAL-BASELINE §IAM/PKIMASTER-PH6A-FPSO-CV07-REV2_FINALREV2DESIGNEDNOT_EXECUTED_IN_CURRENT_DEMO_SCOPEDESIGNED_PENDING_CORPORATE_VALIDATIONFUTURE_PHASE_ONLY/p5PH6A-FPSO-SEAL-02OER-01
PA-42PRODUCTION CONFIGURATION BASELINE CONCEPTPRODUCTION_CONFIGURATION_BASELINE_CONCEPTPH6A-FPSO-FINAL-INTEGRATION-PROMPT-B-REV2CONCEPTNOT_ESTABLISHED_IN_CURRENT_PHASENOT_EXECUTED_IN_CURRENT_DEMO_SCOPEREQUIRES_FUTURE_IMPLEMENTATIONFUTURE_PHASE_ONLY/fipbPH6A-FPSO-SEAL-02G-FPSO-09

28 · Continuous Assurance Preservation (CE01…CE18)

  • · CE01 Document Revision
  • · CE02 Requirement of Record change
  • · CE03 Critical Control change
  • · CE04 DecisionRight change
  • · CE05 Owner / Steward change
  • · CE06 Source Authority change
  • · CE07 Integration change
  • · CE08 Application release
  • · CE09 Rule / Configuration change
  • · CE10 Cybersecurity vulnerability
  • · CE11 IAM change
  • · CE12 Offline change
  • · CE13 Signature change
  • · CE14 Field process change
  • · CE15 SIMOPS change
  • · CE16 Incident / Lesson Learned
  • · CE17 Measurement change
  • · CE18 Infrastructure / Platform change
Flow
ChangeEvent → ImpactAssessment → ES&H Change Impact Classification → Consequence Assessment (NivelConsecuencia) → Probability Assessment (NivelProbabilidad) → AffectedObjects → ScopedRevalidation → PredicateImpact → GateRecheck if required → ConfigurationUpdate → AssuranceRecord → SealUpdate if material

No historical seal overwritten.

30 · Configuration Baselines

DEMONSTRATION_CONFIGURATION_BASELINEESTABLISHED
  • · Design Baseline (PH6A-IADA-REV1)
  • · Functional Baseline (PH6A-FPSO-FUNCTIONAL-BASELINE-REV1)
  • · Temporal Compliance Model (CORRECTION-PROMPT-01-REV0)
  • · Authority Model
  • · Source Authority Model
  • · Critical Control Model
  • · SIMOPS Model
  • · Evidence Model (DEAP REV1)
  • · Change Control Model
  • · Continuous Assurance Model (CE01…CE18)
  • · Scalability Test Configuration (CONTROLLED_SYNTHETIC_SECOND_AREA)
  • · Demo Scenario Set (NORMAL + F-01…F-15)

Does not replace: Future Production Configuration Baseline

PRODUCTION_CONFIGURATION_BASELINENOT_ESTABLISHED_IN_CURRENT_PHASE
Concept preservedPRODUCTION_CONFIGURATION_BASELINE_CONCEPT
Future stateTO_BE_ESTABLISHED_DURING_CORPORATE_INDUSTRIALIZATION

32 · Architecture Traceability

Chain
Requirement → ControlObjective → Capability → FunctionalContract → Rule → SourceAuthority → DecisionRight → Evidence → Gate → ResidualRisk → ValueMechanism
MaterialTraceabilityBreaks0

Future production assets additionally carry CurrentDemoStatus and FutureIndustrializationStatus.

33 · Technical Closeout — Current Phase

Technical Closeout means: CURRENT DESIGN / DEMO PHASE COMPLETE. It does NOT mean: PRODUCTION ENGINEERING COMPLETE · PRODUCTION DEPLOYMENT COMPLETE · PRODUCTION ASSURANCE COMPLETE.

TC-01 — Design baseline frozenSATISFIED

PH6A-IADA-REV1 frozen, seal SEAL-01 active.

TC-02 — Functional baseline frozenSATISFIED

PH6A-FPSO-FUNCTIONAL-BASELINE-REV1 frozen after retest.

TC-03 — Temporal correction acceptedSATISFIED

CORRECTION-PROMPT-01-REV0 = ACCEPTED.

TC-04 — Architecture preservation confirmedSATISFIED

23 preservation flags TRUE; 0 deletions, 0 overwrites.

TC-05 — Architecture review completeSATISFIED

31 assurance dimensions evaluated.

TC-06 — Scalability test completeSATISFIED

20 scope dimensions varied in the synthetic second area.

TC-07 — G-FPSO-ARCH-01 acceptableSATISFIED

PASS_WITH_CONTROLLED_ACTIONS.

TC-08 — Controlled demo completeSATISFIED

16/16 scenarios executed as specified.

TC-09 — Demo assurance acceptableSATISFIED

CONTROLLED_DEMO_EVIDENCE only; no promotion.

TC-10 — Material traceability breaks = 0SATISFIED

Chain instantiated for base and second scope.

TC-11 — Protected invariants preservedSATISFIED

19 core invariants + 9 temporal invariants preserved.

TC-12 — Future production assets preservedSATISFIED

Layer B register entries all PRESERVED.

TC-13 — Open industrialization dependencies documentedSATISFIED

9 BC blockers, OER-01…04, EXT-15, ADR controlled-open set documented.

TC-14 — No unsupported production claimsSATISFIED

Prohibited labels not emitted; production claim = FALSE.

TechnicalCloseoutReadinessREADY_FOR_CURRENT_PHASE_TECHNICAL_CLOSEOUT

34 · Corporate Industrialization Handoff Package

Prepared, not executed. No current demo artifact authorizes an industrialization decision.

  • · Preserved architecture baseline
  • · Functional contracts
  • · Architecture contracts
  • · Design locks
  • · ADR history
  • · Requirements model
  • · Record model
  • · Core Process mapping
  • · Critical Control model
  • · Decision Rights model
  • · Authority model
  • · Source Authority model
  • · Evidence model
  • · Temporal compliance model
  • · Offline / reconciliation model
  • · Signature assurance model
  • · Cybersecurity architecture
  • · Integration architecture
  • · Change Control model
  • · Continuous Assurance model
  • · Service Management design
  • · Measurement / Value model
  • · Executive Assurance model
  • · Scalability findings
  • · Demo findings
  • · Open corporate decisions
  • · Production dependencies
  • · Implementation assumptions
  • · Required future evidence
  • · Recommended industrialization sequence
CORPORATE_INDUSTRIALIZATIONFUTURE_DECISION
Future decision topics
architecture adoption · technology selection · production IAM · PKI · integration patterns · data ownership · cybersecurity hardening · production service management · production configuration · production evidence · production pilot · enterprise rollout

36 · PH6A-FPSO-CORRECTION-PROMPT-02-REV2-REPORT

PriorArchitecturePreservedTRUE
PriorFunctionalDesignPreservedTRUE
PriorAssuranceDesignPreservedTRUE
PriorSecurityDesignPreservedTRUE
PriorIntegrationDesignPreservedTRUE
PriorTemporalModelPreservedTRUE
PriorAuthorityModelPreservedTRUE
PriorSourceAuthorityModelPreservedTRUE
PriorEvidenceModelPreservedTRUE
PriorChangeControlModelPreservedTRUE
PriorContinuousAssuranceModelPreservedTRUE
PriorProductionConceptsPreservedTRUE
PriorSealHistoryPreservedTRUE
PreservedEngineeringAssetCount42
DeletedArtifactCount0
OverwrittenArtifactCount0
SilentSupersessionCount0
BrokenTraceabilityCount0
UnclassifiedFutureAssetCount0
CurrentProgramBoundaryCONTROLLED_DEMONSTRATION
DemoConfigurationBaselineStatusESTABLISHED
FutureProductionArchitectureStatusPRESERVED_FOR_INDUSTRIALIZATION
ProductionConfigurationBaselineStatusNOT_ESTABLISHED_IN_CURRENT_PHASE
TemporalCorrectionIntegrationStatusIMPORTED_WITHOUT_MODIFICATION
G-FPSO-ARCH-01PASS_WITH_CONTROLLED_ACTIONS
ArchitectureAssuranceResultPASS_WITH_CONTROLLED_ACTIONS
ScalabilityAssuranceResultPASS_WITH_CONTROLLED_ACTIONS
ConfigurationOnlyTestResult16/20 SCALABLE_BY_CONFIGURATION
ControlledExtensionTestResult4/20 SCALABLE_WITH_CONTROLLED_EXTENSION
FunctionalReassessmentDependencies0
ArchitectureReopenDependencies0
TemporalComplianceScalabilitySCALABLE_BY_CONFIGURATION
DailyShiftRecordScalabilitySCALABLE_BY_CONFIGURATION
CriticalControlScalabilitySCALABLE_WITH_CONTROLLED_EXTENSION
DecisionRightsScalabilitySCALABLE_WITH_CONTROLLED_EXTENSION
SourceAuthorityScalabilitySCALABLE_WITH_CONTROLLED_EXTENSION
OfflineScalabilitySCALABLE_WITH_CONTROLLED_EXTENSION
SignatureModelScalabilitySCALABLE_WITH_CONTROLLED_EXTENSION
AI_OFF_MaterialStateEquivalenceTRUE
ExecutiveAssurancePanelDualLayerStatusPUBLISHED_SECTION_A_AND_SECTION_B
TechnicalCloseoutReadinessREADY_FOR_CURRENT_PHASE_TECHNICAL_CLOSEOUT
CorporateIndustrializationHandoffStatusPACKAGE_PREPARED_NOT_EXECUTED
ArchitectureReopenRequiredFALSE
MaterialTraceabilityBreaks0
FinalDispositionPRESERVATION_OVERLAY_ACCEPTED_ARCHITECTURE_PRESERVED_SCALABILITY_ASSURED_NO_GATE_STATE_REGRESSED

37 · Hard Acceptance Criteria

CriterionRequiredActualResult
DeletedArtifactCount00PASS
OverwrittenArtifactCount00PASS
SilentSupersessionCount00PASS
BrokenTraceabilityCount00PASS
UnclassifiedFutureAssetCount00PASS
PriorArchitecturePreservedTRUETRUEPASS
PriorFunctionalDesignPreservedTRUETRUEPASS
PriorAssuranceDesignPreservedTRUETRUEPASS
PriorSecurityDesignPreservedTRUETRUEPASS
PriorIntegrationDesignPreservedTRUETRUEPASS
PriorTemporalModelPreservedTRUETRUEPASS
PriorAuthorityModelPreservedTRUETRUEPASS
PriorSourceAuthorityModelPreservedTRUETRUEPASS
PriorEvidenceModelPreservedTRUETRUEPASS
PriorChangeControlModelPreservedTRUETRUEPASS
PriorContinuousAssuranceModelPreservedTRUETRUEPASS
PriorProductionConceptsPreservedTRUETRUEPASS
PriorSealHistoryPreservedTRUETRUEPASS
ProductionDesignAssetsNotReclassifiedAsFailureTRUETRUEPASS
DemoScopeSeparatedFromProductionScopeTRUETRUEPASS
ProtectedInvariantsPreservedTRUETRUEPASS
TemporalComplianceInvariantsPreservedTRUETRUEPASS
PreservedEngineeringAssetRegisterCreatedTRUETRUEPASS
ArchitectureTraceabilityMaintainedTRUETRUEPASS
AI_OFF_MaterialStateEquivalenceTRUETRUEPASS
MaterialTraceabilityBreaks00PASS
FutureProductionArchitecturePreservedTRUETRUEPASS
NoUnsupportedProductionClaimTRUETRUEPASS
ACCEPTANCE_RESULTPASS

39 · Unchanged Gate State (overlay changes no gate)

G-PH6AHOLD — UNCHANGED BY THIS OVERLAY
PilotExposurePROHIBITED — UNCHANGED BY THIS OVERLAY
OperationalClosureEvidenceAdmitted0
BC09ProtectionACTIVE
This overlay is a preservation layer. It is not a reset, not a rebuild and not a replacement baseline. The demo boundary limits execution only — it does not limit, invalidate or delete the engineering already created. G-PH6A remains HOLD and pilot exposure remains PROHIBITED until attributable operational evidence is admitted.