No composite KPI. Each condition is reported on its own terms. Critical failures are never absorbed into an aggregate index.
READY2
CONDITIONAL2
HOLD7
- WP-1002 — Pipe rack spool installation — Line 2140-PL-12
- WP-1003 — Transformer bay earthing installation
- WP-1005 — Instrument loop check — Subsystem 2140-02
- WP-1006 — Cable tray modification — Area 300 rack B
- WP-1008 — Valve actuator alignment — Subsystem 2160-01
- WP-1011 — Adjacent cable pulling — SIMOPS with P-2170 test
- WP-1012 — Excavation for duct bank — Area 100 corridor
Constraints by originating function
Detection never reassigns the originating function.
- Client Interface / Commercial2
- Electrical Maintenance1
- ES&H / Equipment1
- Engineering1
- IT / Integration1
- Work Control1
- Commissioning1
- Workforce / Training1
Recurrent constraint causes
Recurrent causes are surfaced for elimination, not just closure.
- Client release / zone access outstanding — 2 occurrences (WP-1002, WP-1011)
- Critical control unavailable or failed — 2 occurrences (WP-1003, WP-1004)
- Source verification impossible — 2 occurrences (WP-1006, WP-1008)
- Competency lapse on mandatory activity role — 1 occurrence (WP-1012)
Open constraints register
Ageing measured to 2026-08-30 03:00Z.
| ID | Work package | Title | Originating function | Functional owner | Action owner | Required by | Age (h) | Criticality | Status |
|---|---|---|---|---|---|---|---|---|---|
| RST-2001 | WP-1002 | Client release pending for tie-in window | Client Interface / Commercial | Client Interface Manager | Client Interface Manager | 2026-08-30 05:00:00Z | 12 | CRITICAL | OPEN |
| RST-3001 | WP-1003 | Critical control CC-021 unavailable | Electrical Maintenance | Electrical Maintenance Lead | ES&H Supervisor | 2026-08-30 05:00:00Z | 12 | CRITICAL | OPEN |
| RST-4001 | WP-1004 | Loss of continuous atmospheric monitoring during entry | ES&H / Equipment | ES&H Manager | ES&H Supervisor | Immediate | 0 | CRITICAL | IN PROGRESS |
| RST-5001 | WP-1005 | Controlled document revision pending materiality assessment | Engineering | Engineering Manager | Document Control | 2026-08-30 08:00:00Z | 12 | HIGH | IN PROGRESS |
| RST-6001 | WP-1006 | Required document freshness cannot be verified | IT / Integration | Integration Owner | Document Control | 2026-08-30 05:00:00Z | 12 | CRITICAL | OPEN |
| RST-8001 | WP-1008 | Reconciliation required on JHA record | Work Control | Work Control Lead | ES&H Supervisor | 2026-08-30 05:00:00Z | 12 | HIGH | OPEN |
| RST-11001 | WP-1011 | SIMOPS zone access release outstanding | Client Interface / Commercial | Client Interface Manager | Client Interface Manager | 2026-08-30 05:00:00Z | 12 | CRITICAL | OPEN |
| RST-11002 | WP-1011 | SIMOPS coordination with WP-1010 pending | Commissioning | Commissioning Manager | Area Superintendent | 2026-08-30 05:00:00Z | 12 | HIGH | OPEN |
| RST-12001 | WP-1012 | Expired competency for mandatory activity role | Workforce / Training | Training Coordinator | General Foreman | 2026-08-30 05:00:00Z | 12 | CRITICAL | OPEN |
Expiries and integrity watchlist
- Permit Q4-PTW-20101 expires 2026-08-30 18:00Z — WP-1001
- Sanction to Test Q4-STT-60110 expires 2026-08-30 18:00Z — WP-1010
- Document ACX-PRC-0733 superseded by Rev D during execution — WP-1005
- Qualification QUAL-EXC-02 expired 2026-08-15 — WP-1012
- Critical control CC-021 verification overdue since 2026-08-29 06:00Z — WP-1003
- Critical control CC-031 FAILED during execution — WP-1004
- Unresolved source conflict CNF-8001 — WP-1008
Alert register
Acknowledge ≠ Resolve. Resolve ≠ Close.
N3ALT-0001Required critical control CC-021 reported unavailableACKNOWLEDGED
Work package
WP-1003
Functional owner
Electrical Maintenance Lead
Action owner
ES&H Supervisor
Required by
2026-08-30 05:00:00Z
N4ALT-0002Critical control failure during execution — CC-031ACTIONED
Work package
WP-1004
Functional owner
ES&H Manager
Action owner
ES&H Supervisor
Required by
Immediate
N2ALT-0003Controlled document revision published for active packageACKNOWLEDGED
Work package
WP-1005
Functional owner
Engineering Manager
Action owner
Document Control
Required by
2026-08-30 08:00:00Z
N3ALT-0004Source unavailable — document freshness unverifiableDETECTED
Work package
WP-1006
Functional owner
Integration Owner
Action owner
Document Control
Required by
2026-08-30 05:00:00Z
N3ALT-0005Sync conflict requires reconciliationDETECTED
Work package
WP-1008
Functional owner
Work Control Lead
Action owner
ES&H Supervisor
Required by
2026-08-30 06:00:00Z
N3ALT-0006Expired competency on mandatory activity roleACKNOWLEDGED
Work package
WP-1012
Functional owner
Training Coordinator
Action owner
General Foreman
Required by
2026-08-30 05:00:00Z
N2ALT-0007Mandatory approver unavailable — routed to delegateACKNOWLEDGED
Work package
WP-1009
Functional owner
ES&H Manager
Action owner
Delegate DLG-0031
Required by
2026-08-30 04:00:00Z
N2ALT-0008Client release outstanding within look-ahead windowDETECTED
Work package
WP-1002
Functional owner
Client Interface Manager
Action owner
Client Interface Manager
Required by
2026-08-30 05:00:00Z
Evidence completeness
Evidence completeness reports record completion and control effectiveness separately.
Evidence items
8
Demonstrating control effectiveness
5
Record completion only
3
Pending integrity verification
1