BASELINE AUTHORSHIP PROVENANCE AND CONFIGURATION SEAL ONLYFROZEN AND SEALEDPH6A-IADA-REV1-SEAL-01

Design Authorship, Provenance & Configuration Seal

Seal applied over the frozen baseline PH6A-IADA-REV1. Configuration control protects provenance; it does not manufacture legal ownership.

  • · No architecture modification
  • · No functional requirement modification
  • · No change to evidence criteria
  • · No change to blocker states
  • · No creation of OperationalClosureEvidence
  • · No change to Phase 6A status
  • · No legal ownership or corporate IP right established
  • · No rights beyond documented technical contribution and management coordination

A · Design seal executive record

Governance artefact only — no operational evidence created

Seal_IDPH6A-IADA-REV1-SEAL-01
Seal_StatusACTIVE_AND_FROZEN
Baseline_Of_RecordPH6A-IADA-REV1
Baseline_Of_Record_StatusIMMUTABLE_REFERENCE
Baseline_StatusFROZEN_AND_SEALED
ArchitectureChanges0
QuestionnaireChanges0
EvidenceRequestChanges0
BlockerStatusChanges0
TechnicalAttributionVERIFIED
ManagementCoordinationREGISTERED
DesignProvenancePRESERVED
ContributionRegisterACTIVE_APPEND_ONLY
DesignLocks4/4 ACTIVE
LegalOwnershipDeterminationNOT_ASSERTED
SealVerification10/10 PASS
OperationalClosureEvidenceNOT_YET_ACQUIRED
Phase6AHOLD
Phase6BNOT_AUTHORIZED
Phase7NO_GO
BC09ProtectionACTIVE
PilotExposurePROHIBITED

B · Technical attribution record

Displayed exactly as registered; spelling and registration are locked

Ing. Victor Delgado Céspedes — CIP 84092
ES&H · Conceptual Architecture / Functional Design / Technical Development Lead
Conceptual ArchitectureFunctional DesignTechnical Development LeadershipDesign Assurance Development
Not asserted
Legal Owner — NOT ASSERTEDExclusive IP Owner — NOT ASSERTEDCopyright Owner — NOT ASSERTEDPatent Owner — NOT ASSERTED

C · Management coordination record

Coordination is not technical co-authorship

NameEloy Tapia
RoleRegional ES&H Manager
Organization contextBechtel GBU M&M
Contribution roleManagement Coordination / Regional ES&H Governance
Decision referencesNONE_RECORDED

Management coordination is not technical co-authorship, architecture authorship, legal ownership or IP assignment. Specific approvals or technical decisions are not inferred; any future formal approval is recorded as a separate Decision_Reference.

D · Design attribution & configuration control notice

ATTRIBUTION_NOTICE = FROZEN

DESIGN ATTRIBUTION AND CONFIGURATION CONTROL NOTICE

The PH6A-IADA-REV1 baseline consolidates the conceptual architecture, functional design and design-assurance development led technically by Ing. Victor Delgado Céspedes, CIP 84092, within the ES&H function, with management coordination from Eloy Tapia, Regional ES&H Manager, Bechtel GBU M&M.

This attribution record is intended to preserve the technical provenance, configuration integrity, professional contribution and development lineage of the model.

It does not by itself determine legal, economic, contractual or corporate ownership of intellectual property, which remains subject to applicable contractual terms, corporate policies and governing law.

Any subsequent modification to PH6A-IADA-REV1 shall be subject to formal configuration and contribution control.

E · Design provenance lineage

DesignProvenanceLineage is read-only and append-only. Historical dates and approvals are not invented; unreconciled values are recorded as NOT_YET_RECONCILED.

IDArtifactContribution typeDispositionPredecessorSuccessorDate
PRV-01Functional ConceptORIGINAL_CONCEPTACCEPTEDPRV-02NOT YET RECONCILED
PRV-02Design Assurance SpineFUNCTIONAL_DESIGNACCEPTEDPRV-01PRV-03NOT YET RECONCILED
PRV-03Micro-Gate FrameworkFUNCTIONAL_DESIGNACCEPTEDPRV-02PRV-04NOT YET RECONCILED
PRV-04Architecture Dependency MapARCHITECTUREACCEPTEDPRV-03PRV-05NOT YET RECONCILED
PRV-05A–G Controlled Architecture BackboneARCHITECTUREACCEPTED WITH CONTROLLED ACTIONSPRV-04PRV-06NOT YET RECONCILED
PRV-06Phase 0B Domain PrototypeSOFTWARE_IMPLEMENTATIONACCEPTEDPRV-05PRV-07NOT YET RECONCILED
PRV-07Phase 0C Deterministic Decision ArchitectureARCHITECTUREACCEPTEDPRV-06PRV-08NOT YET RECONCILED
PRV-08H–AE Design BasisFUNCTIONAL_DESIGNACCEPTEDPRV-07PRV-09NOT YET RECONCILED
PRV-09High-Fidelity Functional Prototype (Phase 1)SOFTWARE_IMPLEMENTATIONACCEPTEDPRV-08PRV-10NOT YET RECONCILED
PRV-10Prototype Verification (Phase 2 / 2A)TESTINGACCEPTED WITH CONTROLLED ACTIONSPRV-09PRV-11NOT YET RECONCILED
PRV-11Integrated Acceptance (Phase 3)ASSURANCEACCEPTED WITH CONTROLLED ACTIONSPRV-10PRV-12NOT YET RECONCILED
PRV-12Enterprise Option Decision (Phase 4 Rev.2 — Option C)GOVERNANCEACCEPTEDPRV-11PRV-13NOT YET RECONCILED
PRV-13Technical Solution Definition (Phase 5 Rev.2)ARCHITECTUREACCEPTED WITH CONTROLLED CONDITIONSPRV-12PRV-14NOT YET RECONCILED
PRV-14Phase 6 Pilot Definition BaselineGOVERNANCEFROZEN — execution on HOLDPRV-13PRV-15NOT YET RECONCILED
PRV-15Phase 6A Evidence Architecture (/board /erx /wave1 /s1 /oei)ASSURANCEACTIVEPRV-14PRV-16NOT YET RECONCILED
PRV-16PH6A-AHP-REV1.1 Architecture Hardening PatchARCHITECTUREACCEPTEDPRV-15PRV-17NOT YET RECONCILED
PRV-17PH6A-W1-DEAP-REV1 Deep Evidence Assessment ProtocolASSURANCEINTEGRATED AND FROZENPRV-16PRV-18NOT YET RECONCILED
PRV-18PH6A-IADA-REV1 Integrated Architecture & Deep Assurance BaselineARCHITECTUREFROZEN AND SEALEDPRV-17NOT YET RECONCILED

TechnicalLead across lineage: Ing. Victor Delgado Céspedes — CIP 84092 · ManagementCoordination: Eloy Tapia — Regional ES&H Manager — Bechtel GBU M&M

F · Baseline seal record

Populated from the actual frozen baseline only

Seal_IDPH6A-IADA-REV1-SEAL-01
Baseline_IDPH6A-IADA-REV1
Baseline_NameIntegrated Architecture & Deep Assurance Baseline Rev.1
Baseline_VersionREV1
Baseline_StatusFROZEN_AND_SEALED
Freeze_Date2026-08-30
TechnicalDesignLeadIng. Victor Delgado Céspedes
ProfessionalRegistrationCIP 84092
ManagementCoordinationEloy Tapia — Regional ES&H Manager — Bechtel GBU M&M
ArchitectureContractCount12
LogicalComponentCount14
OpenControlledFindings2 (F-AHP-02, F-DEAP-01) — NON_BLOCKING_CONTROLLED_OPEN
ArchitectureDefects0
RegressionResultIBC-01…10 = 10/10 PASS (SIMULATION_EVIDENCE)
ChangeControlStatusSEALED — configuration controlled
IntegrityVerificationSTRUCTURAL_VERIFICATION_PASS
SealStatusACTIVE_AND_FROZEN
Baseline of record
PH6A-IADA-REV1IMMUTABLE_REFERENCE

The application may evolve. PH6A-IADA-REV1 remains the permanent reference point against which future revisions are compared and must never be overwritten by a future revision.

G · Integrity manifest

No file-level cryptographic checksum is fabricated. SHA-256 is reserved for baseline package integrity over an exported immutable artefact and is never a functional evidence requirement.

IDArtifactVersionContent referenceIntegrity
PH6A-IADA-REV1Integrated Architecture & Deep Assurance BaselineREV1src/lib/domain/iada.ts · /iadaPRESENT AND FROZEN
PH6A-AHP-REV1.1Architecture Hardening PatchREV1.1src/lib/domain/ahp.ts · /ahpPRESENT AND FROZEN
PH6A-W1-DEAP-REV1Deep Evidence Assessment ProtocolREV1src/lib/domain/deap.ts · /oeiPRESENT AND FROZEN
PH6A-W1-OEAVQ-REV1Owner Evidence Assessment & Validation QuestionnaireREV1src/lib/domain/oei.ts · /oeiPRESENT AND FROZEN
PH6A-OEB-REV1Operational Evidence Execution BoardREV1src/lib/domain/oeb.ts · /boardPRESENT AND ACTIVE
PH6A-ERX-REV1Evidence Request Execution PackREV1src/lib/domain/erx.ts · /erxPRESENT AND ACTIVE
PH6A-IADA-REV1-SEAL-01Design Authorship, Provenance & Configuration SealSEAL-01src/lib/domain/seal.ts · /sealPRESENT AND FROZEN
ChecksumAlgorithmSHA-256
CRYPTOGRAPHIC_CHECKSUMREQUIRES_EXTERNAL_EXPORT_AND_HASH
ChecksumValueNOT_CALCULATED
ChecksumTimestampNOT_CALCULATED

H · Design locks register

DesignLocks = 4/4 ACTIVE

LOCK 1 — AUTHORSHIP ATTRIBUTIONACTIVE

Technical attribution cannot be silently removed or replaced.

LOCK 2 — PROVENANCE LINEAGEACTIVE

Historical design lineage is append-only.

LOCK 3 — CONFIGURATION CONTROLACTIVE

PH6A-IADA-REV1 cannot be overwritten.

LOCK 4 — CONTRIBUTION TRACEABILITYACTIVE

Subsequent material modifications require contributor and change attribution.

Change classification
ClassEffectRequires new architecture revision
CLARIFICATIONWording only; no contract changeNO
EVIDENCE_CORRECTIONCorrects an evidence record with authority and reasonNO
CONFIGURATION_CHANGEConfigured parameter within frozen contractsNO
SCOPE_CHANGEAlters scope boundaries; requires decision authorityNO
ARCHITECTURE_IMPACTTouches frozen architecture contractsYES
UX_PRESENTATION_CHANGEPresentation-only (Bechtelized / Aconex-inspired) with no change to frozen architecture contractsNO
  • · UX_PRESENTATION_CHANGE does not create a new conceptual-author baseline.
  • · ARCHITECTURE_IMPACT requires a new architecture revision.
  • · No future revision may overwrite the provenance of the parent baseline.

I · Design contribution register

APPEND_ONLY. Contribution is never inferred from access to the model; each contributor is attributed only for the contribution demonstrated in this register.

IDContributorOrganizationTypeAffected artifactParent baselineClassificationIncluded inAttribution
DCR-01
Ing. Victor Delgado Céspedes
Technical Design Lead — ES&H (CIP 84092)
ES&H FunctionORIGINAL CONCEPT
Functional Concept → Design Assurance Spine
Original conceptual model for integrated preventive readiness and work control.
NOT_APPLICABLE_ORIGINAL_LINEAGEPH6A-IADA-REV1REGISTERED
DCR-02
Ing. Victor Delgado Céspedes
Technical Design Lead — ES&H (CIP 84092)
ES&H FunctionFUNCTIONAL DESIGN
H–AE Design Basis · Phase 1 Prototype · Phase 5 Technical Definition
Functional design, deterministic decision architecture and prototype definition.
PH6A-IADA-REV1 lineageNOT_APPLICABLE_ORIGINAL_LINEAGEPH6A-IADA-REV1REGISTERED
DCR-03
Ing. Victor Delgado Céspedes
Technical Design Lead — ES&H (CIP 84092)
ES&H FunctionARCHITECTURE
PH6A-AHP-REV1.1 · PH6A-W1-DEAP-REV1 · PH6A-IADA-REV1
Architecture hardening, deep assurance protocol and integrated baseline consolidation.
PH6A-IADA-REV1ARCHITECTURE_IMPACTPH6A-IADA-REV1REGISTERED
DCR-04
Eloy Tapia
Regional ES&H Manager
Bechtel GBU M&MMANAGEMENT COORDINATION
Programme coordination — Regional ES&H governance context
Management coordination and regional ES&H governance context. No technical authorship, approval or decision inferred.
PH6A-IADA-REV1NOT_APPLICABLEPH6A-IADA-REV1REGISTERED
DCR-05
Ing. Victor Delgado Céspedes
Technical Design Lead — ES&H (CIP 84092)
ES&H FunctionGOVERNANCE
PH6A-IADA-REV1-SEAL-01
Application of the Design Authorship, Provenance & Configuration Seal.
PH6A-IADA-REV1CLARIFICATIONPH6A-IADA-REV1-SEAL-01REGISTERED
Allowed contribution types
ORIGINAL CONCEPTFUNCTIONAL DESIGNARCHITECTUREASSURANCEGOVERNANCEUX DESIGNSOFTWARE IMPLEMENTATIONCONFIGURATIONTESTINGCORPORATE REVIEWMANAGEMENT COORDINATION

J · Revision / descendant model

Descendants of PH6A-IADA-REV1 never replace its original provenance. Original attribution ≠ attribution for all subsequent contributions.

Revision IDParentBaseline IDChangeClassificationNewContributionContributorApprovalAuthorityArchitectureImpactInheritedContractsModifiedContractsRetiredContractsNewContracts
Future artefactParentBaseline_IDExpected classificationState
BechtelizedInteractionArchitecturePH6A-IADA-REV1UX_PRESENTATION_CHANGENOT YET CREATED
CorporateTechnicalDesignPH6A-IADA-REV1ARCHITECTURE_IMPACTNOT YET CREATED
EngicaImplementationPH6A-IADA-REV1SOFTWARE_IMPLEMENTATIONNOT YET CREATED
EnterpriseIntegrationPH6A-IADA-REV1CONFIGURATION_CHANGENOT YET CREATED
ProductionConfigurationPH6A-IADA-REV1CONFIGURATION_CHANGENOT YET CREATED
PROVENANCE_INTEGRITY_VIOLATION

Returned if a descendant version removes TechnicalDesignLead, ParentBaseline or DesignProvenance.

Correction requires: CorrectionReason · Authority · PreviousValue · NewValue · Timestamp

Current state: NO_VIOLATION_DETECTED

K · Corporate development handover boundary

Software implementation authorship is recorded separately and is never merged with original conceptual/functional design attribution.

CorporateDevelopmentHandoverNOT_YET_EXECUTED
SourceDesignBaselinePH6A-IADA-REV1
ReceivingOrganizationNOT_YET_DESIGNATED
ImplementationRecordedAsSOFTWARE_IMPLEMENTATION_CONTRIBUTION

L · Provenance change history

ConfigurationGovernanceEvent is a dedicated append-only governance stream, deliberately separated from GovernedOperationalEvent. It never authorizes work.

BASELINE FROZENBASELINE SEALEDATTRIBUTION REGISTEREDCONTRIBUTION ADDEDREVISION CREATEDCHANGE CLASSIFIEDBASELINE SUPERSEDED FOR USEBASELINE RETAINED AS RECORD
  1. #1 · 2026-08-30BASELINE FROZENPH6A-IADA-REV1

    Integrated architecture & deep assurance baseline frozen.Technical Design Lead

  2. #2 · 2026-08-31ATTRIBUTION REGISTEREDPH6A-IADA-REV1

    Ing. Victor Delgado Céspedes — CIP 84092 registered as Technical Design Lead; Eloy Tapia registered as Management Coordination.Configuration Control

  3. #3 · 2026-08-31CONTRIBUTION ADDEDDCR-01…DCR-05

    Design Contribution Register initialised (append-only).Configuration Control

  4. #4 · 2026-08-31CHANGE CLASSIFIEDUX_PRESENTATION_CHANGE

    New presentation-only change class added; no architecture contract affected.Configuration Control

  5. #5 · 2026-08-31BASELINE SEALEDPH6A-IADA-REV1-SEAL-01

    Design Authorship, Provenance & Configuration Seal applied; BaselineOfRecord = IMMUTABLE_REFERENCE.Technical Design Lead

  6. #6 · 2026-08-31BASELINE RETAINED AS RECORDPH6A-IADA-REV1

    Baseline retained as permanent reference point for all future revisions.Configuration Control

M · Seal verification results

10/10 PASS · CONFIGURATION_VERIFICATION_EVIDENCE (not OperationalClosureEvidence)

IDVerificationExpectedActualResult
SEAL-V01Baseline ID matches PH6A-IADA-REV1MATCHMATCHPASS
SEAL-V02Technical attribution exactly matches Ing. Victor Delgado Céspedes — CIP 84092EXACTEXACTPASS
SEAL-V03Management coordination references Eloy Tapia — Regional ES&H Manager — Bechtel GBU M&MPRESENTPRESENTPASS
SEAL-V04Architecture contracts unchanged12 families / 14 components unchanged12 / 14 unchangedPASS
SEAL-V056 Wave 1 Evidence Requests unchanged6 AWAITING_OWNER6 AWAITING_OWNERPASS
SEAL-V06Blocker predicates unchangedUNSATISFIED / OPENUNSATISFIED / OPENPASS
SEAL-V07Design provenance lineage retained18 lineage nodes retained18 lineage nodes retainedPASS
SEAL-V08Contribution Register is append-onlyAPPEND_ONLYAPPEND_ONLYPASS
SEAL-V09No legal ownership claim generatedNOT_ASSERTEDNOT_ASSERTEDPASS
SEAL-V10Future revision model preserves ParentBaselineParentBaseline_ID mandatoryParentBaseline_ID mandatoryPASS

N · Residual attribution / integrity actions

Carried under the sealed baseline

RefActionOwnerDue conditionStatus
SEAL-RA-01Reconcile authentic historical dates and approval references for lineage nodes PRV-01…PRV-18Technical Design LeadBefore corporate development handoverOPEN CONTROLLED
SEAL-RA-02Export the immutable baseline package externally and record SHA-256 checksumConfiguration ControlOn first external distributionREQUIRES EXTERNAL EXPORT AND HASH
SEAL-RA-03Record any formal management approval as a discrete Decision_Reference against DCR-04Regional ES&H GovernanceIf and when a formal approval is issuedOPEN CONTROLLED
SEAL-RA-04Register descendant artefacts (Bechtelized UX, Engica implementation) with ParentBaseline_ID on creationConfiguration ControlOn descendant creationNOT YET APPLICABLE

Final disposition

PH6A_IADA_REV1_DESIGN_CONFIGURATION_SEAL = APPLIED

PH6A_IADA_REV1_DESIGN_CONFIGURATION_SEALAPPLIED
Seal_IDPH6A-IADA-REV1-SEAL-01
BaselineOfRecordPH6A-IADA-REV1
BaselineStatusFROZEN_AND_SEALED
TechnicalDesignLeadIng. Victor Delgado Céspedes — CIP 84092
TechnicalContributionConceptual Architecture / Functional Design / Technical Development Leadership / Design Assurance Development
ManagementCoordinationEloy Tapia — Regional ES&H Manager — Bechtel GBU M&M
DesignProvenancePRESERVED
DesignLocks4/4 ACTIVE
ContributionRegisterACTIVE_APPEND_ONLY
ArchitectureChanges0
LegalOwnershipDeterminationNOT_ASSERTED
OperationalClosureEvidenceNOT_YET_ACQUIRED
Phase6AHOLD
BC09ProtectionACTIVE
PilotExposurePROHIBITED