Phase 3 · multidisciplinary acceptance · read-only

Integrated Acceptance Gate

Consumes the accepted Phase 1 Prototype, Phase 2 Verification and Phase 2A Closure evidence. No redesign performed. Reviewer challenges are recorded as findings and routed to the competent design authority; no accepted baseline is reopened. No platform, product or application is selected at this gate.

H — Final Integrated Disposition

ACCEPT WITH CONTROLLED ACTIONS

The capability is operationally credible, governable, supportable in principle, compatible with the enterprise landscape as a bounded decision layer, and usable in field execution for the intended decision. It is suitable to proceed to an enterprise solution decision. Progression is conditioned on the six High controlled actions, none of which reopens an accepted baseline.

  • · P3-EA-01 — staff ADR-14 stewardship roles to funded enterprise positions
  • · P3-EA-02 — close ADR-03 and CA-03 object-level authority at the option decision
  • · P3-ESH-01 / P3-IT-02 — close ADR-13 / CA-01 identity and IAM binding before any real authorization is recorded
  • · P3-IT-01 — demonstrate offline capture with fail-closed stale-context handling and deterministic reconciliation
  • · P3-TRN-01 — fund the organizational change workstream

Next hold pointIntegrated Acceptance Gate → Enterprise Business / Architecture Option Decision

NOT TAKEN. No platform, product or application (Q4, Smart Completions, new build or otherwise) is selected or implied at this gate.

CRITICAL findings
0
HIGH findings
6
MEDIUM findings
9
LOW findings
2
Confirmations
1

B — Domain-by-domain acceptance register

Acceptance question

Would a Superintendent trust this model to understand why work can or cannot start?

YES, with controlled actions. Workface readiness, Job Card preparation, lookahead, multi-discipline coordination, SIMOPS, blocker attribution and location continuity are all demonstrated with causal explanation rather than status colour. The Superintendent sees which condition blocks which Job Card, who owns it and by when — not an aggregated score.

Evidence reviewed
  • · /p1/shift — 24/48/72 h lookahead over JC-7701/7702/7703
  • · /p1/location — LOC-3100-CONC-CV07-TT01 concurrent work set + blocker attribution (F-02 closure)
  • · /p1/jobcard/JC-7701 — DecisionExplanation and determinant list
  • · Phase 2 VJ-01…VJ-04; Phase 2A 2A-02 closure
P3-CON-01OPERATIONALMEDIUM

Administrative friction reduction is asserted through the prototype's prepopulation model but has not been measured against the current manual preparation cycle (no baseline time-on-task).

Required action
Establish a preparation-cycle baseline (time to prepare and authorize a Job Card today vs with the capability) before enterprise business case sign-off.
Competent owner
Construction Manager with Project Controls
Architecture impact
None — measurement only.
Operational impact
Adoption argument remains qualitative until measured; does not affect decision correctness.
Residual risk
MEDIUM / CONTROLLED
P3-CON-02OPERATIONALMEDIUM

Reassessment scope after change is demonstrated on a bounded change; the unbounded-change path routes to broader reassessment but the field re-preparation workload of that path is untested at crew scale.

Required action
Run a field trial of the unbounded-change reassessment path across a full shift population before deployment.
Competent owner
Construction Manager with ES&H
Architecture impact
None — selective vs broad reassessment semantics remain as accepted.
Operational impact
Potential shift-start congestion if broad reassessment triggers frequently.
Residual risk
MEDIUM / CONTROLLED

Cross-functional challenge scenarios walked with reviewers

IDScenarioEvidenceObserved behaviourVerdictFindings
CS-01Clean READY Job CardJC-7703 preparation path with all preventive items HUMAN_CONFIRMEDREADY is reached only after every applicable item is confirmed with attributable evidence; readiness is never asserted from source-system status alone.CREDIBLE
CS-02Critical-control HOLDJC-7702 critical control with UNVERIFIABLE verification stateHOLD with the specific control named, owner attributed and required action stated; no compensation from other satisfied dimensions.CREDIBLE
CS-03Cumulative SIMOPS STOPWS-2026-09-03-TT01 (CUM-4) and coverage set WS-…-COVERAGE (CUM-2/5/7)Pairwise PASS with location STOP; competent SIMOPS authority attempt denied with NonCompensableStop and sideEffect NONE.CREDIBLE
CS-04Competency expiry inside the planned windowCrew competency expiring mid-window on the electrical Job CardCurrentReadiness and ForecastReadiness diverge; the forecast degradation is explained by the expiring credential and its owner, not by a generic risk score.CREDIBLEP3-PC-01
CS-05Location continuity between disciplinesLOC-3100-CONC-CV07-TT01 conditions inherited to discipline work contextsContext inherits with applicability revalidation and provenance; authorization never inherits — the hard non-inheritable list holds.CREDIBLE
CS-06Q4 unknown / unmapped stateUnmapped Q4 safety-document state in the interaction setFails closed to UNVERIFIABLE / STOP via CUM-7 rather than being inferred to a nearest known state.CREDIBLE WITH FINDINGP3-EA-02
CS-07Unavailable stewardship authorityLOC-3100-CONC-CV08 with WRITE_AUTHORITY and ISOLATION_AUTHORITY vacantAuthorityResolutionState UNRESOLVED, capabilities DISABLED_SAFE, no alternate actor assumes authority, unrelated Job Cards unaffected.CREDIBLE WITH FINDINGP3-EA-01
CS-08Selective reassessment after changeBounded change to a single preventive determinantOnly affected confirmations are invalidated; unaffected confirmations retain their evidence and version pin.CREDIBLE
CS-09Unbounded change requiring broader reassessmentLocation context version increment affecting multiple disciplinesBroad reassessment is triggered and prior confirmations are demoted to SYSTEM_PROPOSED rather than silently carried forward.CREDIBLE WITH FINDINGP3-CON-02
CS-10Concurrent mechanical / electrical / instrumentation work in one LocationJC-7701 (MECH) / JC-7702 (ELEC) / JC-7703 (INST) in TT01One governed operational context with three discipline work contexts; blockers attributed per Job Card; control ownership stays with the Job Card.CREDIBLEP3-FLD-01

C — Cross-functional conflict register

Positions are not averaged. No voting or weighted score may override a mandatory control or authority boundary.

CF-01Whether a competent SIMOPS authority may disposition a cumulative STOP to protect the shift plan
Position A
Construction: a qualified SIMOPS Coordinator on site should be able to disposition a cumulative STOP with compensating measures, otherwise the shift plan collapses.
Position B
ES&H: cumulative STOP is non-compensable by accepted rule; dispositioning it converts a mandatory control into a negotiated one.
Underlying decision right
Mandatory control integrity (no-compensation rule)
Competent authority
ES&H Authority — mandatory control boundary
Evidence required
None. The rule is an accepted invariant, not an open question.

DispositionPOSITION B UPHELD. No averaging. Cumulative STOP remains non-compensable. Construction's operational concern is redirected to earlier planning: the STOP must be designed out in the lookahead, not dispositioned at the workface. Recorded as P3-CON-02 planning action, not as a rule change.

CF-02Who masters Location canonical identity in the enterprise landscape
Position A
Enterprise Architecture: minimize canonical assets; consider mastering location in an existing enterprise system to avoid a new register.
Position B
Construction and ES&H: no existing system represents the operational context container required for SIMOPS and inheritance with the necessary governance.
Underlying decision right
Canonical representation and lifecycle ownership
Competent authority
Enterprise Architecture with the Location Governance Authority
Evidence required
Object-level capability comparison of candidate enterprise registers against ADR-14 Option C requirements.

DispositionDEFERRED TO THE NEXT GATE. ADR-14 Option C stands as accepted for the capability; the platform/mastering decision belongs to the Enterprise Business / Architecture Option Decision, not to this acceptance review. Recorded as P3-EA-01.

CF-03Whether offline field execution may record an authorization while disconnected
Position A
Field operations: coverage at the workface is unreliable; confirmations must be recordable offline or the model is unusable.
Position B
IT/IM and ES&H: an authorization recorded against a context that cannot be verified as current breaches fail-closed and evidence integrity.
Underlying decision right
Authority and evidence integrity under degraded connectivity
Competent authority
ES&H Authority with IT/IM (design authority for offline semantics)
Evidence required
Demonstrated offline journey with stale-context detection and deterministic reconnect reconciliation.

DispositionNOT RESOLVED AT THIS GATE — routed as P3-IT-01 (High). Interim rule preserved: offline may capture, offline may never authorize against unverifiable context. No voting override permitted.

CF-04Whether governance vocabulary should be replaced in field views
Position A
Field operations: DISABLED_SAFE / SEMANTIC_PROPOSAL are unusable terms at the workface.
Position B
Enterprise Architecture and ES&H: recorded state names are evidence; renaming them fragments traceability.
Underlying decision right
Recorded state semantics vs presentation
Competent authority
Design authority (presentation layer) — state semantics unchanged
Evidence required
Field comprehension test of the proposed lexicon.

DispositionBOTH POSITIONS SATISFIED WITHOUT COMPROMISE OF THE INVARIANT: recorded state names remain canonical; a presentation lexicon is authorized as a controlled action (P3-FLD-01). This is not averaging — the invariant is untouched.

CF-05Whether readiness forecast constitutes a competing schedule
Position A
Project Controls: any forward-looking readiness statement risks being cited as a schedule position.
Position B
Construction: without forecast readiness the lookahead cannot be prepared preventively.
Underlying decision right
Schedule authority
Competent authority
Project Controls — schedule remains sole schedule authority
Evidence required
Forecast labelling bound to the consumed schedule version.

DispositionPOSITION A UPHELD ON AUTHORITY, POSITION B PRESERVED ON FUNCTION: forecast readiness continues, explicitly labelled as a readiness projection against a named schedule version, never as a date. Recorded as P3-PC-01.

Acceptance criteria assessment

CriterionStatusBasis
No unresolved Critical finding existsMETZero Critical findings raised across the eight review domains.
No unresolved High finding undermines a structural invariantMETSix High findings (P3-ESH-01, P3-EA-01, P3-EA-02, P3-IT-01, P3-IT-02, P3-TRN-01). Each is a deployment or enterprise-decision precondition; none contradicts a frozen invariant, and each maps to an already-visible controlled-open ADR or a funded-action requirement.
No review domain identifies an uncontrolled parallel system of recordMETP3-EA-03 confirms no write-back, no date origination, no permit issuance, no progress claim. The single canonical asset (Location) is deliberately governed under ADR-14 Option C.
Authority remains defensibleMETBehavioural gating demonstrated with zero unauthorized side effects; enterprise identity binding routed to ADR-13 / CA-01 as a precondition of real authorization.
No-compensation remains intactMETCF-01 upheld without averaging; NonCompensableStop denials recorded for competent authority attempts.
Location / SIMOPS behaviour remains operationally credibleMETCS-03, CS-05, CS-07, CS-10 judged credible; cumulative rules CUM-2/4/5/6/7 exercised; pairwise PASS never implies location PASS.
Field usability is adequate for the intended decisionMETDecision clarity, blocker identification and proposal-vs-confirmation distinction adequate; two Medium usability actions (P3-FLD-01, P3-FLD-02) carried.
Enterprise implementation appears technically feasibleMETRead-oriented federation, pinned decisions and append-only evidence are industrializable; offline and IAM carried as High preconditions, not as feasibility blockers.
Controlled Open ADRs remain explicitly visibleMETADR-03, ADR-13/CA-01, ADR-15, ADR-16, ADR-17…ADR-24, CA-03, CA-04 remain open and surfaced; none silently resolved during acceptance.

Technology does not create readiness — it makes readiness visible, verifiable and traceable. Integration does not transfer accountability. Application access is not operational authority. Presentation familiarity does not create source authority. Synthetic demonstration data only.