Scenario 11 — Saved Time Not Captured

Adjacent cable pulling — SIMOPS with P-2170 test

Cable pulling adjacent to live test zone

Operational
HOLD
Execution
NOT STARTED
Technology
ONLINE
project Id
PRJ-4820
contract Id
CTR-EPCM-02
area Id
ARE-200
facility Id
FAC-CONC
system Id
SYS-2140
subsystem Id
SUB-2140-02
wbs Id
WBS-2.4.11
activity Id
A-1211
work Package Id
WP-1011
swpp Id
SWPP-311
location Id
LOC-200-EL12
equipment Id
EQ-2140-MCC1
discipline Id
DIS-ELE
shift Id
SHF-DAY-A
functional Owner Id
ROL-ENGM
construction Owner Id
ROL-SUPT

Determinants of the integrated state

Every determinant is listed independently. None was averaged, weighted or offset.

  • HOLDClient Release ReadinessZone access release for SIMOPS window not granted.Owner: Client Interface ManagerNON-COMPENSABLE
  • HOLDRST-11001SIMOPS zone access release outstandingOwner: Client Interface ManagerNON-COMPENSABLE
  • CONDITIONALRST-11002SIMOPS coordination with WP-1010 pendingOwner: Commissioning Manager

Decision context

Package preparation was 35 minutes faster than baseline, but a concurrent client release restriction blocks execution. Time Saved ≠ Productive Time Captured.

Phase
Construction
Planned start
2026-08-30 07:00:00Z
Discipline
Electrical
Area
Area 200 — Process
Required approval role
Permit Authorizer — Area 200 / Day A
Approver
PER-2001 (ROL-PA)
Approver available
Yes
Delegate
None in scope

External object references

Source systems own their records. This layer owns only the integrated decision context.

Source systemObjectIDSource statusRevisionLast verifiedBusiness ownerData stewardWrite authorityModeReconciliation
Primavera P6ActivityA-1211APPROVEDBaseline BL-2026-082026-08-29 23:10:00ZProject Controls ManagerPlanning LeadPrimavera P6READIN SYNC