Scenario 11 — Saved Time Not Captured
Adjacent cable pulling — SIMOPS with P-2170 test
Cable pulling adjacent to live test zone
Operational
HOLDExecution
NOT STARTEDTechnology
ONLINEproject Id
PRJ-4820
contract Id
CTR-EPCM-02
area Id
ARE-200
facility Id
FAC-CONC
system Id
SYS-2140
subsystem Id
SUB-2140-02
wbs Id
WBS-2.4.11
activity Id
A-1211
work Package Id
WP-1011
swpp Id
SWPP-311
location Id
LOC-200-EL12
equipment Id
EQ-2140-MCC1
discipline Id
DIS-ELE
shift Id
SHF-DAY-A
functional Owner Id
ROL-ENGM
construction Owner Id
ROL-SUPT
Determinants of the integrated state
Every determinant is listed independently. None was averaged, weighted or offset.
- HOLDClient Release ReadinessZone access release for SIMOPS window not granted.Owner: Client Interface ManagerNON-COMPENSABLE
- HOLDRST-11001SIMOPS zone access release outstandingOwner: Client Interface ManagerNON-COMPENSABLE
- CONDITIONALRST-11002SIMOPS coordination with WP-1010 pendingOwner: Commissioning Manager
Decision context
Package preparation was 35 minutes faster than baseline, but a concurrent client release restriction blocks execution. Time Saved ≠ Productive Time Captured.
Phase
Construction
Planned start
2026-08-30 07:00:00Z
Discipline
Electrical
Area
Area 200 — Process
Required approval role
Permit Authorizer — Area 200 / Day A
Approver
PER-2001 (ROL-PA)
Approver available
Yes
Delegate
None in scope
External object references
Source systems own their records. This layer owns only the integrated decision context.
| Source system | Object | ID | Source status | Revision | Last verified | Business owner | Data steward | Write authority | Mode | Reconciliation |
|---|---|---|---|---|---|---|---|---|---|---|
| Primavera P6 | Activity | A-1211 | APPROVED | Baseline BL-2026-08 | 2026-08-29 23:10:00Z | Project Controls Manager | Planning Lead | Primavera P6 | READ | IN SYNC |