Scenario 01 — Fully Ready

MCC-1 cable termination — EL +12 m

Electrical installation at height using MEWP

Operational
READY
Execution
NOT STARTED
Technology
ONLINE
project Id
PRJ-4820
contract Id
CTR-EPCM-02
area Id
ARE-200
facility Id
FAC-CONC
system Id
SYS-2140
subsystem Id
SUB-2140-02
wbs Id
WBS-2.4.1
activity Id
A-1201
work Package Id
WP-1001
swpp Id
SWPP-301
location Id
LOC-200-EL12
equipment Id
EQ-2140-MCC1
discipline Id
DIS-ELE
shift Id
SHF-DAY-A
functional Owner Id
ROL-ENGM
construction Owner Id
ROL-SUPT
No open determinants. All mandatory conditions verified against their authoritative sources.

Decision context

Every mandatory condition is satisfied and verified against its authoritative source. No compensation was applied.

Phase
Construction
Planned start
2026-08-30 07:00:00Z
Discipline
Electrical
Area
Area 200 — Process
Required approval role
Permit Authorizer — Area 200 / Day A
Approver
PER-2001 (ROL-PA)
Approver available
Yes
Delegate
None in scope

External object references

Source systems own their records. This layer owns only the integrated decision context.

Source systemObjectIDSource statusRevisionLast verifiedBusiness ownerData stewardWrite authorityModeReconciliation
Primavera P6ActivityA-1201APPROVEDBaseline BL-2026-082026-08-29 23:10:00ZProject Controls ManagerPlanning LeadPrimavera P6READIN SYNC
AconexControlled DocumentACX-PRC-0142APPROVEDRev C2026-08-29 23:10:00ZEngineering ManagerDocument ControlAconexREADIN SYNC
Q4 / Entity DeskPermitQ4-PTW-20101APPROVEDv22026-08-29 23:10:00ZPermit AuthorizerWork ControlQ4 / Entity DeskREAD/EVENTIN SYNC
ForwoodCritical ControlCC-001APPROVEDv72026-08-29 23:10:00ZES&H ManagerCritical Control OwnerForwoodREAD/EVENTIN SYNC