Scenario 06 — Aconex Unavailable
Cable tray modification — Area 300 rack B
Structural / electrical support modification
Operational
HOLDExecution
NOT STARTEDTechnology
SOURCE UNAVAILABLEproject Id
PRJ-4820
contract Id
CTR-EPCM-02
area Id
ARE-200
facility Id
FAC-CONC
system Id
SYS-2140
subsystem Id
SUB-2140-02
wbs Id
WBS-2.4.6
activity Id
A-1206
work Package Id
WP-1006
swpp Id
SWPP-306
location Id
LOC-200-EL12
equipment Id
EQ-2140-MCC1
discipline Id
DIS-ELE
shift Id
SHF-DAY-A
functional Owner Id
ROL-ENGM
construction Owner Id
ROL-SUPT
Determinants of the integrated state
Every determinant is listed independently. None was averaged, weighted or offset.
- HOLDG5 Documentary & EvidenceUnable to verify required condition — Aconex unavailable since 2026-08-29T19:50Z; freshness of ACX-STD-0025 cannot be established.Owner: Document ControlNON-COMPENSABLE
- HOLDRST-6001Required document freshness cannot be verifiedOwner: Integration OwnerNON-COMPENSABLE
- HOLDACX-STD-0025HOLD — Unable to Verify Required Condition: freshness of ACX-STD-0025 cannot be established.Owner: Document ControlNON-COMPENSABLE
Decision context
The document authority source is unavailable. The governed snapshot covers two of three mandatory documents; freshness for the third cannot be established, so the package is HOLD — Unable to Verify Required Condition.
Phase
Construction
Planned start
2026-08-30 07:00:00Z
Discipline
Electrical
Area
Area 300 — Utilities
Required approval role
Permit Authorizer — Area 200 / Day A
Approver
PER-2001 (ROL-PA)
Approver available
Yes
Delegate
None in scope
External object references
Source systems own their records. This layer owns only the integrated decision context.
| Source system | Object | ID | Source status | Revision | Last verified | Business owner | Data steward | Write authority | Mode | Reconciliation |
|---|---|---|---|---|---|---|---|---|---|---|
| Primavera P6 | Activity | A-1206 | APPROVED | Baseline BL-2026-08 | 2026-08-29 23:10:00Z | Project Controls Manager | Planning Lead | Primavera P6 | READ | IN SYNC |
| Aconex | Controlled Document | ACX-STD-0025 | UNKNOWN | Rev A (snapshot) | 2026-08-22 11:00:00Z | Engineering Manager | Document Control | Aconex | READ | UNVERIFIABLE |