PizarraContexto de trabajoDocumentos y registrosControles críticosRegistrosPreparaciónCondiciones bloqueantesAutorización
Aseguramiento / Técnico
Phase 1 prototype · Phase 2A corrective verification · SYNTHETIC DEMONSTRATION DATA

Integrated Preventive Readiness

Hold point — Phase 3 not authorized
Acting role — demonstration device only, not an authorization mechanism

Superintendent: What will be ready across my area, and what must be resequenced?

JC-7703 · Instrumentation

CV-07 belt-drift and speed instrumentation loop check

HOLDSIMOPS STOPPLANNED
Window
2026-09-02 10:00 → 2026-09-02 20:00
Crew
4 persons
Required by
2026-09-02 08:00
Primary blocker
Requirement REQ-INST-114 has CLASSIFICATION_UNRESOLVED — fails closed · Owner: Functional Owner — Instrumentation

Enabling conditions

1 mandatory condition(s) not satisfied
EC-21 · MANDATORY
Loop folder INS-CV07-LP12 rev B pinned
DOCUMENT · Source: Smart Completions · Owner: Completions Engineer
SATISFIED
EC-22 · MANDATORY
REQ-INST-114 criticality classified by Functional Owner
CONTROL · Source: Requirement register · Owner: Functional Owner — Instrumentation · Required by 2026-09-02 08:00
UNVERIFIABLE
EC-23 · MANDATORY
Working-at-height context inherited from parent location and revalidated
CONTROL · Source: Canonical Location Register (inherited, applicability checked) · Owner: Readiness Governance Lead
SATISFIED
EC-24 · MANDATORY
Calibrated loop tester assigned
TOOLS · Source: Calibration register · Owner: Functional Owner — Instrumentation · Valid until 2026-12-01 00:00
SATISFIED

Preventive package

applicability composed by PACE — proposal is not validation
  • PP-21SYSTEM PROPOSED
    Height access plan with fall-restraint anchorage register
    Proposed by PACE (rule PKG-HEIGHT-02) · Inherited location height context (LCR-02) with applicability confirmed.
    Acting identity: Area Superintendent — Concentrator (PSN-2210)

IPERC Continuo

predicted context is never displayed as validated
  • IP-21PREDICTEDAWAITING FIELD CONFIRMATION
    Fall from grating edge
    Control: LCR-02
  • IP-22PREDICTEDAWAITING FIELD CONFIRMATION
    Interaction with concurrent lifting activity
    Control: LCR-07

Work control — PETAR / PTW routing

no auto-authorization anywhere in this flow
  • PETAR-4415PETARGENERATEDHOLD
    Q4 state: Draft · Next actor: ES&H (review) · Auto-authorized: false
    GENERATEDIN_REVIEWVALIDATEDAUTHORIZED

Risk decomposition

activity · location · SIMOPS interaction risks are never merged
Activity risk
Fall from grating edge
Interaction with concurrent lifting activity
Location risk
LCR-02Working at height
LCR-05Energy isolation
LCR-07Lifting operations
SIMOPS interaction risk
Requirement REQ-INST-114 has CLASSIFICATION_UNRESOLVED — fails closed

Authorization

application access is not operational authority
Life critical controls
LCR-02 Working at height
Energy states
ELECTRICAL_LIVE
Isolation boundaries
Exclusion zone
4 m
Authorization is withheld while any mandatory condition is unsatisfied or the location SIMOPS verdict is STOP. The prototype exposes no path to release under these states.

Changes and reassessment

selective, bounded reassessment (TC-11)
  • 2026-09-01 09:10
    REQ-INST-114 introduced without governed classification
    Impact: PACE cannot determine applicability · Reassessment: Fails closed — no default criticality assumed

Continuity context received

Inherit context — never inherit authorization.
  • INHERITEDLocation height risk context LCR-02
  • INHERITEDAccess route and barricade plan
  • INHERITEDEquipment register entry CV-07 (as-left mechanical state)
  • INHERITEDLesson LL-2211
  • NOT INHERITEDPTW-99180 (mechanical)
  • NOT INHERITEDIsolation certificate ISO-CV07-M

Prototype behaviour note

Phase 2A: confirmations carry ConfirmedBy / ConfirmedRole / ConfirmedAt / ConfirmationContext / ObjectVersion / EvidenceRef and are reconstructable in the Authority & Evidence console. Session-scoped store; no persistence beyond the session.