Aseguramiento / Técnico
Phase 1 prototype · Phase 2A corrective verification · SYNTHETIC DEMONSTRATION DATA

Integrated Preventive Readiness

Hold point — Phase 3 not authorized
Acting role — demonstration device only, not an authorization mechanism

Superintendent: What will be ready across my area, and what must be resequenced?

JC-7702 · Electrical

MCC-3100-B feeder termination and loop power-up

CONDITIONALSIMOPS STOPAUTHORIZED
Window
2026-09-02 06:00 → 2026-09-02 16:00
Crew
5 persons
Required by
2026-09-02 05:30
Primary blocker
Concurrent energised work while CV-07 isolation boundary is shared (CUM-1) · Owner: Isolation Authority

Enabling conditions

2 mandatory condition(s) not satisfied
EC-11 · MANDATORY
Arc-flash PPE certification current for all crew
PEOPLE · Source: People system (SoR) · Owner: Training Coordinator · Valid until 2026-09-02 12:00 · Required by 2026-09-02 05:00
EXPIRING
EC-12 · MANDATORY
Single-line diagram ELE-3100-221 rev F pinned
DOCUMENT · Source: Aconex (SoR) · Owner: Document Controller
SATISFIED
EC-13 · MANDATORY
Live-work justification approved
DOCUMENT · Source: Q4 · Owner: Electrical Authority
SATISFIED
EC-14 · MANDATORY
Test instruments calibrated
TOOLS · Source: Calibration register · Owner: Functional Owner — Electrical · Valid until 2026-10-01 00:00
SATISFIED
EC-15 · MANDATORY
Boundary segregation from ISO-CV07-A confirmed by Isolation Authority
CONTROL · Source: Q4 isolation register · Owner: Isolation Authority · Required by 2026-09-02 05:30
UNVERIFIABLE

Preventive package

applicability composed by PACE — proposal is not validation
  • PP-11HUMAN CONFIRMEDEVIDENCE GRADE
    Energised-work barrier and attendant
    Proposed by PACE (rule PKG-LIVE-01) · Live terminations within 6 m of access route.
    ConfirmedBy
    ES&H — M. Vera
    ConfirmedRole
    GOVERNED_POSITION (pre-session record)
    ConfirmedAt
    2026-09-01 17:05
    ObjectVersion
    package v2 · context v7
    ConfirmationContext
    JC-7702 · 3100-CONC-CV07-TT01 · preventive package confirmation
    EvidenceRef
    EV-BASE-PP-11
  • PP-12SYSTEM PROPOSED
    Cross-discipline isolation briefing with mechanical crew
    Proposed by PACE (rule PKG-SIMOPS-03) · Shared isolation boundary detected in the concurrent work set.
    Acting identity: Area Superintendent — Concentrator (PSN-2210)

IPERC Continuo

predicted context is never displayed as validated
  • IP-11PREDICTEDAWAITING FIELD CONFIRMATION
    Arc flash during termination
    Control: LCR-05
  • IP-12PREDICTEDAWAITING FIELD CONFIRMATION
    Unexpected back-feed from UPS circuit
    Control: LCR-05

Work control — PETAR / PTW routing

no auto-authorization anywhere in this flow
  • PTW-99205PTWAUTHORIZEDREADY
    Q4 state: Authorized · Next actor: · Auto-authorized: false
    GENERATEDIN_REVIEWVALIDATEDAUTHORIZED
  • JHA-3320JHABLOCKEDUNMAPPED STATE
    Q4 state: Locked · Next actor: Governance Administrator (CA-03) · Auto-authorized: false
    GENERATEDIN_REVIEWVALIDATEDAUTHORIZED

Risk decomposition

activity · location · SIMOPS interaction risks are never merged
Activity risk
Arc flash during termination
Unexpected back-feed from UPS circuit
Location risk
LCR-02Working at height
LCR-05Energy isolation
LCR-07Lifting operations
SIMOPS interaction risk
Concurrent energised work while CV-07 isolation boundary is shared (CUM-1)

Authorization

application access is not operational authority
Life critical controls
LCR-05 Energy isolation
Energy states
ELECTRICAL_LIVE
Isolation boundaries
ISO-CV07-A
Exclusion zone
6 m
Authorization is withheld while any mandatory condition is unsatisfied or the location SIMOPS verdict is STOP. The prototype exposes no path to release under these states.

Changes and reassessment

selective, bounded reassessment (TC-11)
  • 2026-09-01 11:30
    Q4 returned state 'Locked' for JHA-3320
    Impact: State not in the governed mapping table — fails closed · Reassessment: Blocked pending CA-03 / ADR mapping decision

Continuity context received

Inherit context — never inherit authorization.
  • INHERITEDLocation height risk context LCR-02
  • INHERITEDAccess route and barricade plan
  • INHERITEDEquipment register entry CV-07 (as-left mechanical state)
  • INHERITEDLesson LL-2211
  • NOT INHERITEDPTW-99180 (mechanical)
  • NOT INHERITEDIsolation certificate ISO-CV07-M

Prototype behaviour note

Phase 2A: confirmations carry ConfirmedBy / ConfirmedRole / ConfirmedAt / ConfirmationContext / ObjectVersion / EvidenceRef and are reconstructable in the Authority & Evidence console. Session-scoped store; no persistence beyond the session.