Phase 1 prototype · Phase 2A corrective verification · SYNTHETIC DEMONSTRATION DATA
Integrated Preventive Readiness
Acting role — demonstration device only, not an authorization mechanism
Superintendent: What will be ready across my area, and what must be resequenced?
JC-7701 · Mechanical
CV-07 head pulley bearing replacement
Location
Window
2026-09-02 07:00 → 2026-09-02 19:00
Crew
8 persons
Required by
2026-09-02 05:00
Primary blocker
SIMOPS CUM-3 — lifting envelope overlaps occupied grating (RST-441) · Owner: Shift SIMOPS CoordinatorEnabling conditions
3 mandatory condition(s) not satisfiedEC-01 · MANDATORY Isolation certificate ISO-CV07-A applied and verified PERMIT · Source: Q4 (SoR) · Owner: Isolation Authority · Valid until 2026-09-03 06:00 | SATISFIED |
EC-02 · MANDATORY Rigger competency current for all lift crew PEOPLE · Source: People system (SoR) · Owner: Training Coordinator · Valid until 2026-09-02 12:00 · Required by 2026-09-02 06:00 | EXPIRING |
EC-03 · MANDATORY Gantry crane inspection certificate current EQUIPMENT · Source: Maintenance register · Owner: Functional Owner — Lifting · Valid until 2026-11-10 00:00 | SATISFIED |
EC-04 · MANDATORY Wind speed below 15 m/s at working level ENVIRONMENT · Source: Site Met (federated) · Owner: Shift Superintendent · Required by 2026-09-02 13:00 | NOT SATISFIED |
EC-05 · MANDATORY Isometric drawing MEC-CV07-014 rev C pinned to the decision DOCUMENT · Source: Aconex (SoR) · Owner: Document Controller | SATISFIED |
EC-06 · MANDATORY Dropped-object exclusion barricade erected at +8 m CONTROL · Source: Field verification · Owner: Supervisor — Mechanical · Required by 2026-09-02 06:30 | NOT SATISFIED |
EC-07 Replacement bearing kit staged at TT01 MATERIALS · Source: Warehouse · Owner: Materials Coordinator | SATISFIED |
Preventive package
applicability composed by PACE — proposal is not validation- PP-01SYSTEM PROPOSEDApply dropped-object prevention pack (tethering + exclusion)Proposed by PACE (rule PKG-DO-02) · Lifting over occupied level in the location context.Acting identity: Area Superintendent — Concentrator (PSN-2210)
- PP-02HUMAN CONFIRMEDEVIDENCE GRADEIndependent isolation verification by second authorized personProposed by PACE (rule PKG-ISO-01) · Stored energy present in drive train.
- ConfirmedBy
- Isolation Authority — J. Rojas
- ConfirmedRole
- GOVERNED_POSITION (pre-session record)
- ConfirmedAt
- 2026-09-01 16:40
- ObjectVersion
- package v2 · context v7
- ConfirmationContext
- JC-7701 · 3100-CONC-CV07-TT01 · preventive package confirmation
- EvidenceRef
- EV-BASE-PP-02
- PP-03SYSTEM PROPOSEDPre-lift toolbox with rigging plan reviewProposed by PACE (rule PKG-LIFT-04) · Lift class B in confined tower structure.Acting identity: Area Superintendent — Concentrator (PSN-2210)
IPERC Continuo
predicted context is never displayed as validated- IP-01PREDICTEDAWAITING FIELD CONFIRMATIONSuspended load over walkwayControl: LCR-07
- IP-02PREDICTEDFIELD CONFIRMEDResidual stored energy in take-up unitControl: LCR-05 · Confirmed by Supervisor — Mechanical
- IP-03FIELD ORIGINATEDFIELD CONFIRMEDGrating opening at +12 m (field observed, not predicted)Control: LCR-02 · Confirmed by Supervisor — Mechanical
Work control — PETAR / PTW routing
no auto-authorization anywhere in this flow- PTW-99201PTWIN REVIEWHOLDQ4 state: In Review · Next actor: ES&H Reviewer · Auto-authorized: falseGENERATEDIN_REVIEWVALIDATEDAUTHORIZED
- PETAR-4410PETARGENERATEDHOLDQ4 state: Generated · Next actor: Area Superintendent (review) · Auto-authorized: falseGENERATEDIN_REVIEWVALIDATEDAUTHORIZED
- ISO-CV07-AISOLATIONVALIDATEDREADYQ4 state: Applied · Next actor: — · Auto-authorized: falseGENERATEDIN_REVIEWVALIDATEDAUTHORIZED
Risk decomposition
activity · location · SIMOPS interaction risks are never mergedActivity risk
Suspended load over walkway
Residual stored energy in take-up unit
Location risk
LCR-02 — Working at height
LCR-05 — Energy isolation
LCR-07 — Lifting operations
SIMOPS interaction risk
SIMOPS CUM-3 — lifting envelope overlaps occupied grating (RST-441)
Authorization
application access is not operational authorityLife critical controls
LCR-05 Energy isolation · LCR-07 Lifting operations · LCR-02 Working at height
Energy states
ISOLATED
Isolation boundaries
ISO-CV07-A
Exclusion zone
15 m
Authorization is withheld while any mandatory condition is unsatisfied or the location SIMOPS verdict is STOP. The prototype exposes no path to release under these states.
Changes and reassessment
selective, bounded reassessment (TC-11)- 2026-09-01 14:05Wind forecast revised upward for 13:00–17:00Impact: EC-04 moved SATISFIED → NOT_SATISFIED · Reassessment: Selective (TC-11): lifting-dependent conditions only
- 2026-09-01 15:20Instrumentation JC-7703 added to the location work setImpact: Cumulative SIMOPS re-evaluated · Reassessment: Location-level, bounded to concurrent set
Continuity context received
Inherit context — never inherit authorization.- INHERITEDLocation height risk context LCR-02
- INHERITEDAccess route and barricade plan
- INHERITEDEquipment register entry CV-07 (as-left mechanical state)
- INHERITEDLesson LL-2211
- NOT INHERITEDPTW-99180 (mechanical)
- NOT INHERITEDIsolation certificate ISO-CV07-M
Prototype behaviour note
Phase 2A: confirmations carry ConfirmedBy / ConfirmedRole / ConfirmedAt / ConfirmationContext / ObjectVersion / EvidenceRef and are reconstructable in the Authority & Evidence console. Session-scoped store; no persistence beyond the session.