PizarraContexto de trabajoDocumentos y registrosControles críticosRegistrosPreparaciónCondiciones bloqueantesAutorización
Aseguramiento / Técnico
Phase 1 prototype · Phase 2A corrective verification · SYNTHETIC DEMONSTRATION DATA

Integrated Preventive Readiness

Hold point — Phase 3 not authorized
Acting role — demonstration device only, not an authorization mechanism

Superintendent: What will be ready across my area, and what must be resequenced?

JC-7701 · Mechanical

CV-07 head pulley bearing replacement

STOPSIMOPS STOPPREPARING
Window
2026-09-02 07:00 → 2026-09-02 19:00
Crew
8 persons
Required by
2026-09-02 05:00
Primary blocker
SIMOPS CUM-3 — lifting envelope overlaps occupied grating (RST-441) · Owner: Shift SIMOPS Coordinator

Enabling conditions

3 mandatory condition(s) not satisfied
EC-01 · MANDATORY
Isolation certificate ISO-CV07-A applied and verified
PERMIT · Source: Q4 (SoR) · Owner: Isolation Authority · Valid until 2026-09-03 06:00
SATISFIED
EC-02 · MANDATORY
Rigger competency current for all lift crew
PEOPLE · Source: People system (SoR) · Owner: Training Coordinator · Valid until 2026-09-02 12:00 · Required by 2026-09-02 06:00
EXPIRING
EC-03 · MANDATORY
Gantry crane inspection certificate current
EQUIPMENT · Source: Maintenance register · Owner: Functional Owner — Lifting · Valid until 2026-11-10 00:00
SATISFIED
EC-04 · MANDATORY
Wind speed below 15 m/s at working level
ENVIRONMENT · Source: Site Met (federated) · Owner: Shift Superintendent · Required by 2026-09-02 13:00
NOT SATISFIED
EC-05 · MANDATORY
Isometric drawing MEC-CV07-014 rev C pinned to the decision
DOCUMENT · Source: Aconex (SoR) · Owner: Document Controller
SATISFIED
EC-06 · MANDATORY
Dropped-object exclusion barricade erected at +8 m
CONTROL · Source: Field verification · Owner: Supervisor — Mechanical · Required by 2026-09-02 06:30
NOT SATISFIED
EC-07
Replacement bearing kit staged at TT01
MATERIALS · Source: Warehouse · Owner: Materials Coordinator
SATISFIED

Preventive package

applicability composed by PACE — proposal is not validation
  • PP-01SYSTEM PROPOSED
    Apply dropped-object prevention pack (tethering + exclusion)
    Proposed by PACE (rule PKG-DO-02) · Lifting over occupied level in the location context.
    Acting identity: Area Superintendent — Concentrator (PSN-2210)
  • PP-02HUMAN CONFIRMEDEVIDENCE GRADE
    Independent isolation verification by second authorized person
    Proposed by PACE (rule PKG-ISO-01) · Stored energy present in drive train.
    ConfirmedBy
    Isolation Authority — J. Rojas
    ConfirmedRole
    GOVERNED_POSITION (pre-session record)
    ConfirmedAt
    2026-09-01 16:40
    ObjectVersion
    package v2 · context v7
    ConfirmationContext
    JC-7701 · 3100-CONC-CV07-TT01 · preventive package confirmation
    EvidenceRef
    EV-BASE-PP-02
  • PP-03SYSTEM PROPOSED
    Pre-lift toolbox with rigging plan review
    Proposed by PACE (rule PKG-LIFT-04) · Lift class B in confined tower structure.
    Acting identity: Area Superintendent — Concentrator (PSN-2210)

IPERC Continuo

predicted context is never displayed as validated
  • IP-01PREDICTEDAWAITING FIELD CONFIRMATION
    Suspended load over walkway
    Control: LCR-07
  • IP-02PREDICTEDFIELD CONFIRMED
    Residual stored energy in take-up unit
    Control: LCR-05 · Confirmed by Supervisor — Mechanical
  • IP-03FIELD ORIGINATEDFIELD CONFIRMED
    Grating opening at +12 m (field observed, not predicted)
    Control: LCR-02 · Confirmed by Supervisor — Mechanical

Work control — PETAR / PTW routing

no auto-authorization anywhere in this flow
  • PTW-99201PTWIN REVIEWHOLD
    Q4 state: In Review · Next actor: ES&H Reviewer · Auto-authorized: false
    GENERATEDIN_REVIEWVALIDATEDAUTHORIZED
  • PETAR-4410PETARGENERATEDHOLD
    Q4 state: Generated · Next actor: Area Superintendent (review) · Auto-authorized: false
    GENERATEDIN_REVIEWVALIDATEDAUTHORIZED
  • ISO-CV07-AISOLATIONVALIDATEDREADY
    Q4 state: Applied · Next actor: · Auto-authorized: false
    GENERATEDIN_REVIEWVALIDATEDAUTHORIZED

Risk decomposition

activity · location · SIMOPS interaction risks are never merged
Activity risk
Suspended load over walkway
Residual stored energy in take-up unit
Location risk
LCR-02Working at height
LCR-05Energy isolation
LCR-07Lifting operations
SIMOPS interaction risk
SIMOPS CUM-3 — lifting envelope overlaps occupied grating (RST-441)

Authorization

application access is not operational authority
Life critical controls
LCR-05 Energy isolation · LCR-07 Lifting operations · LCR-02 Working at height
Energy states
ISOLATED
Isolation boundaries
ISO-CV07-A
Exclusion zone
15 m
Authorization is withheld while any mandatory condition is unsatisfied or the location SIMOPS verdict is STOP. The prototype exposes no path to release under these states.

Changes and reassessment

selective, bounded reassessment (TC-11)
  • 2026-09-01 14:05
    Wind forecast revised upward for 13:00–17:00
    Impact: EC-04 moved SATISFIED → NOT_SATISFIED · Reassessment: Selective (TC-11): lifting-dependent conditions only
  • 2026-09-01 15:20
    Instrumentation JC-7703 added to the location work set
    Impact: Cumulative SIMOPS re-evaluated · Reassessment: Location-level, bounded to concurrent set

Continuity context received

Inherit context — never inherit authorization.
  • INHERITEDLocation height risk context LCR-02
  • INHERITEDAccess route and barricade plan
  • INHERITEDEquipment register entry CV-07 (as-left mechanical state)
  • INHERITEDLesson LL-2211
  • NOT INHERITEDPTW-99180 (mechanical)
  • NOT INHERITEDIsolation certificate ISO-CV07-M

Prototype behaviour note

Phase 2A: confirmations carry ConfirmedBy / ConfirmedRole / ConfirmedAt / ConfirmationContext / ObjectVersion / EvidenceRef and are reconstructable in the Authority & Evidence console. Session-scoped store; no persistence beyond the session.