PizarraContexto de trabajoDocumentos y registrosControles críticosRegistrosPreparaciónCondiciones bloqueantesAutorización
Aseguramiento / Técnico
Presentation-layer realignment only

FIELD PRE-START BOARD VISUAL REALIGNMENT (PRESENTATION ONLY)

PH6A-FPSO-UX-PRESTART-BOARD-VISUAL-REALIGNMENT-REV0

UX checks PASS
15
UX checks FAIL
0
Disposition
ACCEPTED

UX_PRESTART_BOARD_VISUAL_REALIGNMENT = ACCEPTED

REF · Authoritative reference

Pizarra de Reunión de Preinicio de Turno — used for visual hierarchy, board composition, section grouping, density and reading order only. No example-filled cell is treated as governing data.

  • Q4-like pattern — location / work transactional context (interaction only)
  • Aconex-like pattern — document register, revision and retrieval (interaction only)
Parent baselines (unchanged)
MASTER-PH6A-FPSO-CV07-REV2_FINAL · PH6A-FPSO-UX-HIERARCHY-ALIGNMENT-REV0 · PH6A-FPSO-EXECUTIVE-FINAL-DEMO-REV3 · PH6A-FPSO-CORRECTION-PROMPT-01-REV0 · PH6A-FPSO-CORRECTION-PROMPT-02-REV2

VIS · What changed visually

  • Compact operational header strip replaces the hero-card landing block.
  • Board surfaces (bounded panels, ruled grids, stronger section boundaries) replace dark empty space.
  • Board reading order A–J follows the physical pre-start board.
  • Higher information density: attendance, tasks, risks/controls and package visible above the fold.
  • Navigation demoted: secondary and technical navigation collapsed behind disclosures.
  • Field-oriented ES&H wording (Probabilidad, Consecuencia, Control crítico, Condición bloqueante, Vigencia, Revisión vigente) on visible labels only.

ARCH · What remained untouched architecturally

  • All frozen functional contracts and baselines
  • Authority, decision-right and source-authority logic
  • Evidence admission, DEAP and closure predicates
  • Change-control and temporal invariant semantics
  • All BC / EXT / gate / seal / baseline IDs
  • All 57 preserved engineering routes and registers

PRES · Preservation accounting

Deleted
0
Overwritten
0
SilentSupersession
0
BrokenTraceability
0
ArchitectureImpact
NONE
FunctionalContractImpact
NONE
AuthorityImpact
NONE
SourceAuthorityImpact
NONE

ROUTE · Route behaviour for "/" and "/prestart"

  • "/" continues to resolve to "/prestart" (redirect preserved).
  • "/prestart" opens directly on the Digital Pre-Start Board content — no console shell landing.
  • /console, /executive-assurance, /continuous-assurance, /documents, /shift-readiness and all technical routes remain reachable and unchanged.
Open the Digital Pre-Start Board →

ACC · Acceptance result

Ref.CheckResult
VB-01Landing route resolves to the board itselfPASS
VB-02Header strip exposes project/area/front/date/shift/supervisor/discipline/IWP/crewPASS
VB-03Location context shows canonical identity and GPS as context hint onlyPASS
VB-04Attendance shows present / missing / replacement and competency restrictionPASS
VB-05Task sequence shows steps, responsible role, job card and concurrencyPASS
VB-06Fatality risks map to critical controls with required vs observed statePASS
VB-07Pre-populated package renders as SYSTEM_PROPOSED / PREDETERMINED / DRAFT onlyPASS
VB-08No package item is approved by defaultPASS
VB-09Documents panel preserves revision / approval / effective distinctionPASS
VB-10Blockers show reason code, scope, owner, action and timingPASS
VB-11HUMAN_CONFIRMED and SYSTEM_PROPOSED remain visually separatedPASS
VB-12Authorization control remains disabled with an explicit reasonPASS
VB-13Traceability strip remains accessible (collapsible)PASS
VB-14Navigation demoted without removing any routePASS
VB-15No architecture, authority, evidence or change-control logic modifiedPASS